Conveyor Cleaning Procedure

Conveyor Cleaning Procedure


Application:
Foam and Manual Cleaning
Cleaning equipment required:
Foaming Equipment (FI-10N), soft brush or cloth, Specific application area:
low/medium pressure water hose Conveyor
Cleaning interval:
Start Up or interval of 8-16 hours operating time
Cleaning Procedure & Chemicals Conc. Temp. Contact Notes
(%) (°C) Time
(min)
Remove the coarse soils.
Initial rinse
Ambient 5 - 10 High pressure wash is not recommended.
Water
Water may destroy bearings & photocells.

Apply chemical by Mobile Foamer FI-10N


Alkaline Foam Cleaning Required utility for FI-10N: high pressure air
4-6 bar
3-5 Ambient 10 – 30
Mild alkaline
Remove the organic soil
FPC
After production / Daily
Intermediate rinse
Water Rinse thoroughly till neutral pH
Ambient 5 - 10
High pressure wash is not recommended.

Cleanliness check Check all critical areas. Make sure that the
contact surfaces between the chain likns are
cleaned.
Re-clean if necessary.
Spray Sanitizing Sanitizing with Mobile Foamer FI-10N

Peracetic acid based sanitizer


0.2-0.3 Ambient 15 – 30 Required utility for FI-10N: high pressure air
Oxonia Active 4-6 bar

No post rinse required

PPE Personal Protection Equipment required for cleaning

 05/2016, Ecolab Vietnam


For any more assistance, do not hesitate to contact your responsible Ecolab service.

Important additional remarks!


! Due to the diversity of materials and applications the information given below represents only a non binding guideline and is
not intended to supersede the manufacturers specifications, limitations and recommendations. It is compulsory to follow the
manufacturers limitations, especially concerning pH and temperature stability of the materials. The cleaning process should
be individually optimized.