DRAMS-QA-PR-200 Quality Assurance and Control Requirements
DRAMS-QA-PR-200 Quality Assurance and Control Requirements
DRAMS-QA-PR-200 Quality Assurance and Control Requirements
Logo here if
applicable
Configuration Management
Document Number: DRAMS-QA-PR-200 Date issued : 22 October 2009
Author: A.Hill Status: Issued
Quality Assurance and Quality
File Name: Revision: 0
Control Requirements
TABLE OF CONTENTS
TABLE OF CONTENTS.................................................................................................................................2
1. REVISION RECORD SHEET.........................................................................................................3
2. PURPOSE..........................................................................................................................................4
3. REFERENCES..................................................................................................................................4
Insert Client
Logo here if
applicable
4. DEFINITIONS...................................................................................................................................4
5. QUALITY MANAGEMENT SYSTEM..........................................................................................5
6. SUPPLIER / CONTRACTOR SELECTION.................................................................................5
6.1 PRE-AWARD ASSESSMENT..............................................................................................5
6.2 SUPPLIER / CONTRACTOR QUALITY PLANS..................................................................5
6.3 DOCUMENT SUBMISSIONS...............................................................................................5
7. SUPPLIER / CONTRACTOR QUALITY ASSURANCE............................................................5
7.1 GENERAL REQUIREMENTS..............................................................................................6
7.2 CRITICALITY RATINGS.......................................................................................................6
7.2.1 Critical...................................................................................................................................6
7.2.2 Major.....................................................................................................................................6
7.2.3 All Other................................................................................................................................6
8. SUPPLIER / CONTRACTOR SURVEILLANCE.........................................................................6
9. NON CONFORMANCE...................................................................................................................7
10. CONCESSION REQUESTS............................................................................................................8
11. FINAL INSPECTION RELEASE...................................................................................................8
11.1 FINAL INSPECTION............................................................................................................8
12. QUALITY DATA BOOK (REFER TO THE CONTRACT REQUIREMENTS)......................8
12.1 FRONT SHEET....................................................................................................................9
12.2 SPINE MARKINGS...............................................................................................................9
12.3 OPERATING AND MAINTENANCE MANUALS (MECHANICAL EQUIPMENT).................9
13. CHANGE REQUEST CONTROL..................................................................................................9
13.1 CHANGES WITH CONTRACTUAL IMPLICATIONS.........................................................10
13.2 COMMUNICATION OF CHANGE REQUEST...................................................................10
14. QUALITY SPECIFICATIONS.....................................................................................................10
14.1 GENERAL..........................................................................................................................10
14.2 SHOP DETAILING.............................................................................................................10
14.3 WELDING...........................................................................................................................10
14.4 CORROSION PROTECTION.............................................................................................10
14.4.1 Fabrication / Steelwork / Plate work / Piping......................................................................10
14.4.2 Mechanical/Electrical Equipment (Capital).........................................................................11
14.5 HOT DIP GALVANISING...................................................................................................11
14.6 RUBBER LINING AND OTHER LININGS..........................................................................11
14.7 INSPECTIONS...................................................................................................................11
15. QUALITY RECORDS....................................................................................................................11
16. DOCUMENTATION AND RECORDS Retention......................................................................11
2. PURPOSE
This document is intended to instruct the Supplier / Contractor as to the minimum
Quality Assurance and Control requirements for the supply of goods and / or
services in terms of the contract placed on them, and to ensure that the
communication between the Supplier / Contractor and DRA is clearly defined.
3. REFERENCES
The following latest editions shall apply:
ISO 9001:2008: Quality Management Systems Requirements
ISO 9000:2005: Quality Management Systems – Fundamentals and
Vocabulary
The DRA Contract / Order
DRAMS-QA-PR-300 Non Conformance Procedure
DRAMS-QA-PR-400 Concession Request Procedure
The Suppliers / Contractors are required to request specific documentation which
may be required from DRA. This is not limited to the documentation listed in this
document.
4. DEFINITIONS
/ Contractor.
The Project Manager / Engineer will prepare the “Critical” and “Major” equipment
schedule.
The Project Engineer in conjunction with the Project Manager is responsible for
the control and monitoring of all Supplier / Contractors.
Quality Control (QC) on specific packages will be the responsibility of the
Package Engineer, with the assistance of a quality inspector, where required.
Supplier / Contractors will be required to demonstrate compliance to the relevant
parts of ISO 9001:2008.
Ratings, critical, major and other, as below, are defined to allow / enable
inspectors and / or expeditors to understand the importance of that piece of
equipment.
7.2.1 Critical
A component or permanent assembly is critical if;
Its failure is likely to result in hazardous or unsafe conditions for individuals
using, maintaining or depending upon the equipment or structure of which it
is a part: and / or
If the failure of which is likely to significantly affect the performance of
important equipment or the structure of which it is part: and / or
If it requires 24 hours or more to replace, assuming immediate availability of
spares.
7.2.2 Major
A component or permanent assembly is major, if the failure thereof is likely to
materially reduce the ability to use the equipment or structure of which it is a part.
7.2.3 All Other
Equipment termed “minor” i.e. not affecting human safety, not likely to have an
influence on the functioning of the product shall be controlled via the Quality
Control System.
In the event of disagreement between the Engineer and the Supplier / Contractor,
the DRA Project Engineer’s decision on classification of parts and sub-
assemblies shall be final.
Criticality must be specified on the relevant QCPs
9. NON CONFORMANCE
A Non Conformance Report (NCR) - DRAMS-QA-FO-006 - may be issued during
the course of fabrication or manufacture, where the Supplier / Contractor fail to
meet the agreed specification due to (but not limited to) any of the following
causes:
Any finished dimension outside tolerance.
Mechanical properties outside specification.
Identification or traceability is lost.
Non destructive examination has revealed indications outside specification.
The non-conformance affects safety, performance, maintainability, life or
interchange ability of the unit.
Failure of the Supplier / Contractor’s quality system has occurred.
The DRA QC Inspector shall raise a non-conformance report on the Supplier /
Contractor.
Non conformance reports will be registered and recorded by the DRA Project
Lead Quality Representative and issued to the DRA Discipline / Package
Engineer for his action. Copies of all “Closed Out” non-conformance reports shall
be included in the data book.
DRA will not be required to accept the non conforming materials or condition/s
involved unless rectified to the satisfaction of the Discipline / Package Engineer.
All costs incurred in rectifying \ the non-conformance to specification, shall be for
the Supplier / Contractor’s account.
Refer to DRAMS-QA-PR-300 Non-Conformance Procedure.
Ensuring that the correct revision of drawings have been used for
Manufacture / Fabrication
Dimensional checks to approved drawings
Witness of trial running, if possible, and recording of free running
clearances, motor power draw, bearing temperatures, etc.;
Final shipping release documentation checked for correctness and delivery
address;
Confirmation of Completion of the Data Dossier.
Status of Operating and Maintenance Manuals.
Packing Requirements as stated in the contract.
Manufacturer
Project
Project Number
Description
Client
Equipment number/s
Changes made that could affect the design and / or other disciplines involved in
the project. It is therefore imperative that they be rapidly communicated to the
Project Manager / Engineer and others concerned to ensure timeous inclusion of
the details, thereby minimizing the time and cost impact on the project.
14.1 GENERAL
14.3 WELDING
14.7 INSPECTIONS