Professional Documents
Culture Documents
Load Comb - Tech Structure - Phani - Rev - 0
Load Comb - Tech Structure - Phani - Rev - 0
EQUIPM BUNDL
ECCENT
ENT TESTIN WIND X WIND Z SEISMIC SEISMIC E
ERECTION RIC
LC DL OPERAT G LOAD DIR DIR X DIR Z DIR REMOV
LOAD (EEL) LOAD
ING (ETL) (WLx) (WLy) (SLx) (SLy) AL
(ECL)
(EOL) LOAD
(TBL)
1 2 3 4 5 6 7 8 9 10
101 1.40
102 1.20 0.50 1.00 1.00
103 1.20 0.50 1.00 1.00
104 1.20 1.00 1.00 1.00
105 0.90 1.00
106 0.90 1.00
107 0.90 1.00 1.00
1of 7
2of 7
LOAD COMB 101 +1.4 DL
1 1.4
LOAD COMB 102 +1.2 DL+0.5 ERECTION LOAD (EEL)+1.0 TUBE BUNDLE RE
1 1.2 2 0.5 9 1.0 10 1.0
LOAD COMB 103 +1.2 DL+0.5 TESTING LOAD (ETL)+1.0 TUBE BUNDLE REM
1 1.2 4 0.5 9 1.0 10 1.0
LOAD COMB 104 +1.2 DL+1.0 EQUIPMENT OPERATING (EOL)+1.0 TUBE BUN
1 1.2 3 1.0 9 1.0 10 1.0
LOAD COMB 105 +0.9 DL+1.0 WIND X DIR (WLx)
1 0.9 5 1.0
LOAD COMB 106 +0.9 DL+1.0 WIND Z DIR (WLy)
1 0.9 6 1.0
LOAD COMB 107 +0.9 DL+1.0 SEISMIC X DIR (SLx)+1.0 SEISMIC Z DIR (SLy)
1 0.9 7 1.0 8 1.0
)+1.0 TUBE BUNDLE REMOVAL LOAD (TBL)+1.0 ECCENTRIC LOAD (ECL)