Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

Test Analysis Document

Arttha 5G FR1 RU product solution


Rel.2.0.2

TEST REPORT for TDD duplexed 100 Mhz and 80 Mhz bandwidth
where we have identified the list of cases with final status
attached.

Test_Case_list_for_E
xecution.xlsx

For 100MHz
1. Default TDD test pattern "No Comp" scenario
2. 3 customized TDD patterns
3. Rx path default TDD test pattern

For 80MHz
1. Default TDD test pattern "No Comp" scenario
2. Rx path default TDD test pattern.
All cases will be executed with validation :

 DL slot timing (as per the TDD pattern) in time


domain graph of VSA
100mhz:
Test case referenced from Test report:
TC_RU_CPLANE_02
TC_RU_CPLANE_03
Analysis for 80mhz:
Test case referenced from Test report:
TC_RU_E2E_TDD_FR1_TX_01
TC_RU_E2E_TDD_FR1_TX_03
TC_RU_E2E_TDD_FR1_RX_01
TC_RU_E2E_TDD_FR1_RX_03
 UL slot timing (as per the TDD pattern) in time
domain graph of VSA -64 QAM

256 QAM:
QPSK:

DL-time length for DSUUU

 Any unwanted spike in DL and UL slot should not be


present.

Test case referenced from Test list document:


TC_RU_CPLANE_12
TC_RU_CPLANE_13
TC_RU_CPLANE_14
TC_RU_CPLANE_15
 Frame start Offset value should be same for Ant0
and Ant1 in nano seconds.
Ant0: 100mhz 64QAM
Ant1: 100mhz 64QA in both ANT frame offset 169.95ns and
166.43ns respectively

Ant2:
 Tx and Rx power level in db.

TX power :

 Same will repeat for each different Bandwidth.


100Mhz and 80 Mhz.
TX path:
100 Mhz (9bit-comp & No-comp) testcases are
completed for TDD pattern 7624
100 Mhz (9bit comp) Siemens TDD patterns DDDSU,
DDSUU and DSUUU test-cases are completed.
80 Mhz (9bit comp & No-comp) testcases are
completed for TDD pattern 7624

DDDSU:
DDSUU:

DSUUU:
 For internal analysis only need to check data per
symbol in octave plot tool of bin file of DU and RU
for per slot data of uplink.

Following JIRA fixes validated:

Issue
Summary key
PS5GRUS-
"CONFIGURABLE-TDD-PATTERN-SUPPORTED" - is it supported or not? 56
UL/Rx+TDD: Timing issue of UL/Rx data between symbol to symbol not precisely coming PS5GRUS-
for 1-Ant case itself 159
PS5GRUS-
Remove "ps5gru_mp_netconf_v5p0" after installation to new user provided directory 156
DL/Tx+TDD: ANT 0 , ANT 1 transmission is 675uS delayed !!! should start on exact same PS5GRUS-
time. 155
PS5GRUS-
Uplink timing issue observed during uplink data transmission 154
PS5GRUS-
netopeer installation problems 153
PS5GRUS-
PS ruapp application segmentation fault 145
PS5GRUS-
compression configuration 87
M-plane parameter excel : though approved by PS , in practice Yang and parameters are PS5GRUS-
different , PS to review excel again 78

You might also like