Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

PRASHANT M.

SAWANT 14 Years of experience in the field of Quality assurance, Quality control, shop and field
Inspection, Inspection co-ordination, Expediting, Vendor evaluation, Vendor pre-qualification
and supplier surveillance in construction, fabrication and welding fields, including assistance in
corporate and project quality management.

Experience in different work sectors like Oil & Gas, Water, Power, Renewable energy and Nuclear
and executed projects pertaining to Petroleum refineries, Chemical plants, LNG, CNG, Solar,
Nuclear infrastructure and Coal fired power plant.

Personal Work experience


Address Senior Manager - Quality Jul 2022 - Present
C/301 , Vrundavan complex , Raju nagar ,
Tata Projects Limited ( Oil , Gas & Hydrocarbon ), Mumbai
Shivaji path , Dombivli ( west )
421202 Dombivli KEY QUALITY CONTROL RESPONSIBILITIES :
Phone number
+91- 9967037407 Ensure suppliers meet project requirements through vendor evaluation / audits of

Email supplierʼs.
sawantprashant87@yahoo.com Responsible to conducts shop inspections in accordance with project requirements, codes
& standards, Inspection packages and requisitioning engineer requests.
Date of birth
16-09-1987 Responsible to liaison with PMC / End customers for dispatch clearances of shop inspected
packages before dispatches.
Gender
Male Review of Quality assurance plan as per client specification and project requirement. Review
and approval of TDC , NDE procedures , WPS / PQR / WPQ , Work procedures like hydro test ,
Nationality
positive material identification , vacuum test , Heat treatment procedure , FAT procedure ,
Indian
packing procedure, etc.
Marital status
Carry out Kick‑off meeting, Pre‑inspection meetings for briefing the project requirements to
Married
vendor & TPIA.
LinkedIn
Co‑ordination with third party inspection agencies for inspection arrangements and review
www.linkedin.com/in/ prashantmsawant
TPIA reports.
Review of Inspection documents, QA Dossiers, MRB / MDR / Vendor data books as per
Key Skills & Characteristics Customer specification and project requirements.
Co‑ordinate with PMC / Client for quality documentation review and endorsement on IRN
Required Minimum Supervision
and review of Manufacturing record books.
Problem solving Skills
Accountability KEY EXPEDITING RESPONSIBILITIES :
Active & Patient Listener
Strong Interpersonal skills and Team Player Review the scope of supply of purchase order along with Project specifications.
Continuous Learning Arrange and participate in post award Kick Off Meeting (KOM) to discuss vendorʼs
engineering and manufacturing schedule, documents requirement and submission dates,
key documents, communication protocols, progress reporting and project formats.
Languages Expedite timely receipt of vendorʼs engineering deliverables
English Expedite internally for timely and expedited approval of key documents that are required
Hindi for Suppliers to proceed further with Procurement/Manufacturing/Inspection.
Expedite vendorʼs procurement activities to ensure suborders of materials and respective
Marathi
deliveries are in line with vendorʼs engineering and manufacturing schedule.
Review Monthly Progress Reports, Manufacturing Schedule, visit Vendorʼs premises for
progress verification.
As and when required, arrange, and lead Pre‑Inspection Meeting.
Arrange the Engineering Clearance, Inspection clearance, Shipping Releases.
Ensure that all day‑to‑day activities are aligned to achieve the timely deliveries in right
quantity.
Items Expedited : Piping , Structures , E&I items , Fire fighting systems , Static and Rotary
equipment's and Packages.

Major Projects handled:

1. PROJECT NAME : Rajasthan refinery project


PROJECT DESCRIPTION : CDU VDU with Hotwell off gas treatment unit
PROJECT LOCATION : Barmer district , Rajasthan, India
OWNER / CLIENT : HPCL Rajasthan refinery Ltd. ( HRRL )
EPC CONTRACTOR : Tata projects limited.
PMC : Engineers India limited.

Role & responsibilities: Lead – Quality control


Handled Quality assurance, Quality control and inspection activities for below packages :‑
Static Packages : Caustic pre‑wash column, Coalescers, Drums, Vessels, Air
coolers, Exchangers, Ejectors, Condensers, Coolers.
Rotary Packages : Pump, Compressors
Mechanical packages : Heater package, Liquid ring vacuum package, HVAC package & Goods
Lift.
Piping Bulk : CS, SS and Clad piping

2. PROJECT NAME : Petrochemical and lube integration project Lupech J18


PROJECT DESCRIPTION : MS Block unit including control room and Octamax
PROJECT LOCATION : Vadodara , Gujarat , India
OWNER / CLIENT : Indian oil corporation limited
EPC CONTRACTOR : Tata projects Limited
PMC : Technip Energies

Role & responsibilities: Senior Manager – Quality control


Handling Quality assurance, Quality control and inspection activities for below packages :‑

Static Packages : Caustic pre‑wash column , Coalescers , Drums , Vessels , Air coolers
, Exchangers ,Ejectors , Condensers , Coolers , Filters, etc.

3. PROJECT NAME : Nitric acid expansion project


PROJECT LOCATION : Dahej , Gujarat , India
OWNER / CLIENT : Deepak Fertilizer & Petrochemical Corporation Ltd. ( DFCL )
EPCM CONTRACTOR : Tata projects Limited

Role & responsibilities: Lead – Quality control


Handling Quality assurance, Quality control and inspection activities :‑
Preparation of Indicative Inspection and test plan to attach in MR
Review Technical offers received from Bidders
Discussion with Bidders on technical Queries
Preparation of Project Quality plan , Inspection categorization plan , Supplier quality
requirements , etc.
Participation in Kick off meetings , etc.

Quality Control Engineer Jul 2017 - Jul 2022


Black & Veatch, Mumbai
Estimation of the project QC man‑hours as per the project material take off list.
To ensure suppliers meet project requirements through vendor evaluation / audits of
supplierʼs and site contractorʼs quality control programs.
Conduct shop inspections in accordance with project requirements, codes & standards,
Inspection packages and requisitioning engineer requests.
Determine any non‑conformance, participate in corrective action and ensure appropriate
resolution and documentation.
Liaise with end customers for dispatch clearances of shop inspected packages before
dispatch to site.
Responsible for third party inspector performance evaluations.
Review & development of project execution procedures, quality procedures, Inspection and
Test Plans, NDE procedures, FAT procedures, WPS / PQR / WPQ, Work procedures like hydro
test, positive material identification, vacuum test, Cryogenic test procedure, Heat treatment
procedures, packing procedures, etc.
Participate in Kick‑off meeting, Pre‑inspection meetings with vendor for briefing the project
requirements to vendor & TPIA.
Co‑ordination with third party inspection agencies for inspection arrangements and review
TPIA reports.
Monitoring Inspection stages and forecasting Inspection requirements.
Maintaining proper log of inspection activities & clearances for smooth project execution.
Preparation of QA dossier and submission to Owner for review / approval and for providing
the final dispatch clearances.
Review of Inspection documents, Quality Dossiers, MRB / MDR / Vendor data books as per
Customer specification and Project requirements.
Project co‑ordination and support to B&V worldwide offices for arranging and attending
inspections.
Inspected Power plantʼs super critical pumps packages like Turbine Driven Boiler Feed
pumps (TDBFP) including Booster Pumps: Flow‑1456 M3/hrs, Head‑3600 M, D.
Pressure‑323.3 Bar, Motor Driven Boiler Feed pumps (MDBFP) including Booster pumps:
Flow‑915 M3/hrs, Head‑3200 M, D. Pressure‑291 Bar, Condensate Extraction pumps (CEP):
Flow‑1950M3/hrs, Head‑90M,at M/s. KSB Pump‑ Shirwal factory.

MAJOR PROJECTS HANDLED :

PROJECT NAME : Van Phong 1 BOT thermal power plant project


PROJECT DESCRIPTION : 2 x 716 MW – Coal fired supercritical power plant
PROJECT LOCATION : Ninh yen hamlets , Vietnam
OWNER / CLIENT : Van Phong Power company limited, Established by Sumitomo corporation.
EPC CONTRACTOR : Toshiba Energy systems & solutions corporations & Black & Veatch

Role & responsibilities: Quality control inspector and coordinator


Worked as Quality control inspector and coordinator, Handled inspection activities for below
packages.

Piping : Pipe supports, High pressure cast steel valves, General service cast steel valves,
Miscellaneous valves, Butterfly valves, Pressure safety valves
Mechanical: Automatic tube cleaning system, Condenser tube leak detection system, Boiler
feed water pump package.

PROJECT NAME : IOLPL Ennore LNG Regasification facility


PROJECT DESCRIPTION : 5 MMTPA of LNG import , storage and regasification terminal
PROJECT LOCATION : Ennore terminal , Chennai , India
OWNER / CLIENT : Indian oil LNG Pvt. Ltd. ( IOLPL )
EPC CONTRACTOR : Black & Veatch
PMC : AMEC Foster Wheeler

Role & responsibilities : Lead Quality control


Worked as Lead Quality control and handled inspection activities for nearly 72 packages:

Piping : Cryogenic and Non‑cryogenic valves, PSV, strainers, pipe and spring supports, CS & SS
forged fittings, Gaskets, CS & SS pipes, CS & SS flanges, CS & SS fasteners.

Mechanical : Metering skid package, EOT cranes, Nitrogen generation package, Additive
injection package, Air operated pit pumps.

HSE : Safety shower & eyewash, Low and high expansion foam skid, Clean agent system, DCP
skid system, Deluge and alarm valve package, Fire monitors, Extinguishers, Water and foam
monitors, fire jeep and first aid vehicle, Fire truck.

E&I : LNG sampling system, On‑off cryogenic and non‑cryogenic valves with actuator,
temperature gauges and thermowells, Cathodic protection system, Pressure and Pressure
gauges, Magnetic pressure gauges, Power and control cables, cable trays, security and telecom
package, Bus duct, Ultrasonic flowmeter.

PROJECT NAME : LNG Jetty topside and offshore facility


PROJECT DESCRIPTION : FSRU based LNG import terminal of 5MMTPA capacity
PROJECT LOCATION : Jafrabad , Gujarat , India
OWNER / CLIENT : Swan energy limited
EPC CONTRACTOR : Black & Veatch
PMC : RINA

Role & responsibilities : Lead Quality control


Worked as Lead Quality control and handled inspection activities of nearly 52 packages:

Piping : Cryogenic and Non‑cryogenic valves, Dual plate check valves, PSV, strainers, pipe and
spring supports, CS & SS forged fittings, Gaskets, CS & SS pipes, CS & SS flanges, CS & SS
fasteners, Flow element
and orifice packages.

HSE : Safety shower & eyewash, clean agent system, Spray and sprinklers package, DCP skid
system, Deluge and alarm valve package, Tower and foam monitors.

E&I : MOV / On‑off cryogenic and non‑cryogenic valves with actuator, Temperature gauges and
thermowells, Cathodic protection system, Pressure and differential pressure gauges, Magnetic
pressure gauges, Power and control cables, cable trays, Security and telecom package,
Ultrasonic flowmeter.

PROJECT NAME : Lontar extension coal fired steam power plant


PROJECT DESCRIPTION : 315 MW supercritical coal‑fired boiler , steam turbine and associated
BOP
PROJECT LOCATION : Lontar village , Indinesia
OWNER / CLIENT : Perusahaan Listrik Negara ( PLN )
EPC CONTRACTOR : Black & Veatch

Role & responsibilities : Quality control coordinator


Worked as Quality control coordinator, Handled inspection activities for 04 packages :

Package details : BFP turbine package, Lube oil system, Wastewater treatment plant &
Automatic tube cleaning system package.

PROJECT NAME : Golar gimi tortue phase 1A FLNG


PROJECT DESCRIPTION : FLNG topside including LNG export , Gas treating , BOG & Fuel gas
handling
PROJECT LOCATION : Shore of Mauritania and saint louis profonde block offshore Senegal
OWNER / CLIENT : Golar LNG
EPC CONTRACTOR : Keppel shipyard
EP SUB‑CONTRACTOR : Black & Veatch

Role & responsibilities : Lead Quality control for India based packages.

Worked as Lead Quality control and Handled inspection activities for 03 packages :

Piping : Cryogenic and Non‑cryogenic valves


Mechanical : Vacuum Jacketed cryogenic storage vessel

Inspection Engineer Apr 2012 - Jul 2017


TUV India Private Limited. TUV NORD Group, Mumbai
Carry out inspection at vendor premises for bought out items, forging, tubes, pipes, plates,
fittings, flanges, valves, fasteners ,storage tanks, fabricated items like Pressure Vessels, Heat
Exchangers and structural fabrication.
Final Inspection of seamless and ERW line pipes at M/s. Maharashtra seamless ltd.
Nagothane for client IOCL, L&T, HPCL, Samsung, etc. ,In‑process , NDE and Final Inspection
of LSAW pipes at M/s. Lalit pipes & pipes ltd.
Witness & certify material testing machines at test labs for compliance to material testing
standard.
WPS/PQR/WPQ Qualification and approval.

Major Projects handled:

Solar pv power plant project { Kukshi (M.P.) } of M/s. Real Gold Developer for vendor
M/s.Alfa Infraprop Pvt. Ltd. At Sub‑vendor place M/s. Sterling Strips (Bhiwandi), involves
Expediting and inspection of raw material at vendor / sub‑vendor premises.
Online monitoring / Inspection during production of project structures like ‑ S Purlins,
Channel poles, C section rafters, End bracing struts, Purlin supporting plates, clamps.
Final inspection of S Purlins, Channel poles, C section rafters, End bracing struts, Purlin
supporting plates, clamps after completion of hole punching as per drawing and painting on
punching areas.

Bhabha Atomic Research Centre (Tarapur ) project ASFSF ( i.e. additional spent fuel
storage facility )
as“ QA MANAGER ( Mechanical ) ”, involves,

Preparation of Quality work procedures, NDE procedures ,Quality Assurance plans and
inspection report formats for various systems of the entire project.
In process inspection as per approved QAP of Leak Detection module, S S Lining of fuel pool
area, CS piping, SS piping, CS and SS Embedded parts and various systems involved in
project.
WPS/PQR/WPQ Qualification and approval.
Preparation and maintenance of all quality related documentation.

Junior Surveyor - Inspection Dec 2011 - Mar 2012


International Certification Services Pvt. Ltd., Mumbai
Carry out inspection at different vendor premises for inspection of various bought out items,
forging, casting, tubes, pipes, plates, fittings, flanges, valves for clients like BEML, HPCL,
BPCL, etc.
Onsite Inspection / Supervision for Mahanagar Gas Pipeline project ‑ Compressed Gas
Distribution Network

Quality Control Engineer Aug 2011 - Nov 2011


Surindra Engineering Company Limited., Mumbai
Preparation of Quality Control Procedures, NDE Procedures & Quality Assurance Plans for
LSAW pipes.
Raw material, In‑process and final inspection of LSAW pipes.
Liaise with TPIA for inspection and clearances.
Quality control documentation and Pre‑shipment inspection.

Production and Quality control Engineer Dec 2010 - Jun 2011


Pinnacle Infrastructure International Pvt. Ltd., Murbad - Thane
Preparation of Quality control procedures, NDE procedures & Quality assurance plans for
LSAW pipes, Turnkey Projects & Fabrication works as per customer requirements.
Raw material , In‑process and Final inspection of LSAW pipes & Fabricated structures.
Liaise with third party inspection agency / surveyors for inspection and clearance.
Quality control documentation and Pre‑shipment inspection before dispatch.

Trainee Engineer Jun 2010 - Nov 2010


Gea Ecoflex India Pvt. Ltd., Rabale - Navi Mumbai
Production planning, Manpower allocation and labour handling.
Preparation of Auto CADD drawings and CNC machine programming.
In process supervision and final inspection of plate type heat exchangers.

Education and Qualifications


Bachelor of Engineering - Mechanical Jun 2005 - Jun 2010
Y.T.I.E.T., Mumbai

H.S.C. Jun 2003 - Jun 2004


S.H. Jondhale College, Mumbai

S.S.C. Jun 2002 - Jun 2003


Mahatma Gandhi School, Mumbai

Certifications
API SIFE - Source Inspector Fixed Equipments Dec 2018 - Dec 2018
API

CSWIP Welding Inspector 3.1 Mar 2015 - Mar 2015


TWI

ASNT Level II - Ultrasonic testing Jun 2011 - Jun 2011


Bhide Institute of testing technologies

ASNT Level II - Mangnetic Particle testing Jul 2011 - Jul 2011


Bhide institute of testing & technologies

ASNT Level II - Radiographic testing Jul 2011 - Jul 2011


Bhide institute of testing & technologies

ASNT Level II - Liquid Penetrant testing Jul 2011 - Jul 2011


Bhide institute of testing & technologies

Foundation in Mechanical CADD Apr 2008 - Apr 2008


CADD Centre

Solar Photo Voltaic Grid Connected Power Plants Jun 2015 - Jun 2015
National Training Centre for Solar Technology Banglore

Internal QMS Auditor ISO 9001 2015 May 2024 - May 2024
LRQA Limited

PMI - Project Management Professional ( Training Program ) Nov 2023 - Nov 2023
Star Agile LLC

Passport Details :
Passport No. : V2782360
Date of Expiry : 12/ 08 / 2031