PETROCHEMICAL AND LUBE INTEGRATION PROJECT “LuPech” (J-18)” AT

IOCL
GUJARAT REFINERY, VADODARA, GUJARAT,INDIA
EPCC-5 PACKAGE (MS BLOCK AND OCTAMAX UNIT)

PURCHASE ORDER NO.: SBU - O & G (OIL, GAS & HYDROCARBONS)/LUPECH J18 - IOCL-MS BLOCK/500054/19274

SR NUMBER:

VENDOR NAME: ARTSON ENGINEERING LIMITED

PMC DOCUMENT NO.: 077154C-27794927-1836-AEL02-MTE-A2001-006

CONTRACTOR DOC NO.: 500054-TPL-19274-D141-00037

DOCUMENT TITLE: G.A. OF LP CONDENSATE POT-2 (1836-V-009)

ITEM DESCRIPTION LP CONDENSATE POT-2

TAG NO: 1836-V-009

REVISION
CODE-1 NO:
IS SUBJECTED 2 OF IBR,
TO APPROVAL REV. DATE 18.04.2024
ANY CHANGE DUE TO IBR VENDOR TO
RESUBMIT DOCUMENT FOR APPROVAL.
DOCUMENT CATEGORY A REV. OBJECT IFA

APPROVE W ITH COMMENTS,


VENDOR TO TAK E CARE OF COMMENTS
Technip Energies Review Stamp DURING FABRICATION & DISPATCH.

Additional information which Contractor wants to mention

DOCUMENT IS REVIEW ED W .R.T EARLIER COMMENTS ONLY. ANY CHANGE W ITHOUT HIGHLIGHTING
OR PRIOR INFORMATION IS COMPLETELY VENDOR RESPONSIBILITY.
CODE-1 IS SUBJECTED TO APPROVAL RECEVIED FROM PMC/LICENSER, ANY FUTURE COMMENTS
FROM PMC/LICENSER SHALL BE INCORPORATED W ITHOUT TIME & COST IMPLICATION
APPROVAL/REVIEW SHALL NOT RELIEVE VENDOR OF THIER RESPONSIBILITY FOR CORRECT
2 18.04.2024 ISSUE FOR APPROVAL KGS DNS DNS
DESIGN, ENGINEERING AND CONSTRUCTION. THE SOLE RESPONSIBILITY OF CORRECTNESS OF
DESIGN, ENGINEERING
1
AND CONSTRUCTION
12.07.2023
SHALL LIE W ITHKGS
ISSUE FOR APPROVAL
VENDOR IRRESPECTIVE
DNS
OF THE
DNS
FACT THAT THE SUBMITTED DELIVERABLE ARE REVIEW ED OR NOT REVIEW ED.
0 10.04.2023 ISSUE FOR APPROVAL KGS DNS DNS

PURPOSE/ DESCRIPTION OF
REV. DATE Written by Checked by Approved by
REVISION
A B C D E F G H I


NOZZLE SCHEDULE DESIGN DATA
V2 V2 2 ASME B16.5 WIDTHxTHK.
- DAVIT SUPPORT NOZZLE (NPS) PROJ. DESIGN CODE ASME SEC VIII DIV.1 ED 2021 + ERRATA + IBR
V1 T PG - SERVICE QTY. SCH. THK REMARKS
MARK SIZE TYPE FACE RATTING R.F. PAD FROM C.L.
N ORIENTATION QUANTITY ONE
200 200 30° 2 F CONDENSATE INLET / OUTLET 3 1 160 - WN RF 600 60 x 12 SEE DRG. VORTEX BREAKER VESSEL SIZE (OUTER DIA x BTL-FF LENGTH) OD 610 x 1500mm
EQUALIZING NOZZLE 2 DESIGN PRESSURE (Kg/Cm² g) 26.7 / FV
T 2 1 - 16.6 LWN RF 600 - SEE DRG. -
DAVIT SUPPORT DESIGN TEMPERATURE (INT./EXT.) °C 220 / 220
2 NOS. LIFTING LUG U UTILITY CONNECTION 2 1 - 16.6 LWN RF 600 - 505 -
OPERATING TEMPERATURE °C 145
7 AT 180° APART LT1-2 LEVEL TRANSMITTER 3 2 160 - WN RF 300 60 x 12 505 - 7
OPERATING PRESSURE (Kg/Cm² g) 3
LG1-2 LEVEL GUAGE 2 2 - 16.6 LWN RF 300 - 505 - MDMT °C 4.4
2
FLUID DENSITY Kg/m3 921
PG PRESSURE GAUGE 2 1 - 16.6 LWN RF 300 - 2 SEE DRG. -
104 CORROSION ALLOWANCE mm 3
106 V1 VENT 2 1 - 16.6 LWN RF 300 - SEE DRG. WITH BLIND FLG.
275

COVER FLANGE SPECIAL SERVICE IBR


105

4.5 THK.
GASKET
24 NPS x 300# x BLRF D DRAIN 2 1 160 - WN RF 300 - SEE DRG. WITH BLIND FLG. JOINT EFFICIENCY (S H EL L / DIS H ) 0.85 / 1
98 THK., 3 MM RF ASME B16.5
RADIOGRAPHY (S H EL L / DIS H ) (SPOT/FULL)

100
2 PSV RELIEF VALVE 3 1 160 - WN RF 600 SPOT / FULL
2 60 x 12 505 2
EL. + 1500 IMPACT TESTING EXEMPTED AS PER UCS-66
FLANGE GASKET HH HANDHOLE + BL 8 1 80 - WN RF 300 100 x 12 525 WITH BLIND FLG. PWHT N.A.
FACE BODY FLANGE YES (NOTE-21)
24 NPS x 300# x WNRF
103 GENERAL NOTES:- PFHT
270° 90° (Kg/Cm² g) 27.3 (COVER FLANGE)
ASME B16.5 V1 T MAWP AND GOVERNING ELEMENT 2
V3 CS2 V3 1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED. MAP AND GOVERNING ELEMENT (Kg/Cm² g) 29.2 (COVER FLANGE)
- - 2. ALL FLANGE BOLT HOLES SHALL STRADDLE NORMAL CENTRE LINE OF VESSEL UNLESS OTHERWISE STATED HYDROTEST PRESSURE SHOP (HORZ.) (Kg/Cm² g) 40.1 IBR / 38 UG-99 (c)

00
R2
3. ALL FLANGE GASKET FACE MACHINED WITH 3.2 to 6.3µm (Ra 125 to 250 AARH). HYDROTEST PRESSURE SITE (VERT.) (Kg/Cm² g) 40.1 IBR / 34.71 UG-99(b) (35)
`W3'
4. NOZZLES WITH BLIND FLANGE TO BE PROVIDED WITH GASKET, STUD BOLTS, & NUTS.
NACE REQUIREMENT (YES / NO) NO 2
5. SS316 SPIRAL WOUND GASKET WITH GRAPHITE FILLER ALONG WITH SS316 INNER RING & CS OUTER RING SHALL BE USED.
2 6. FOUNDATION BOLTS SHALL BE DESIGNED WITH THE FOLLOWING ALLOWABLE, TENSILE LOADS: 1400 kg/cm², SHEAR LOADS: 1100 STATUTORY REQUIREMENT (YES / NO) YES (IBR)
EL. + 1175
PSV PAINTING AS PER SPECIFICATION (REFER NOTE-18, 19, 20)
6 kg/cm² 6
EL. + 1125 7. ALL CARBON STEEL MATERIAL SHALL BE IN KILLED QUALITY. INSULATION THK. / TYPE (BY OTHERS) mm 40 / HOT INSULATION
8. ALL PIPES AND FITTINGS SHALL BE SEAMLESS. FIRE PROOFING THK. (BY OTHERS) mm 50MM ON EACH SURFACE
LT1
9. THE INSIDE CORNER OF NOZZLE AND MANWAY NECKS SHALL BE ROUNDED (MIN. 6mm RADIUS) TO ELIMINATE ALL SHARP
EL. + 1025 U STAMP N.A.
CORNERS.
1500 T.L. TO BODY FLANGE GASKET CONTACT FACE

LG1 2 NOS.
C.G. + 998 INSPECTION BY BV + TPL / TECHNIP
EMPTY LIFTING LUG 10. INTERNAL ATTACHMENTS WELDED TO VESSEL SHELL SHALL BE WITH FULL PENETRATION ON BOTH SIDES
11. ALL REMOVABLE INTERNALS SHALL BE DESIGNED TO PASS THROUGH MANHOLE I.D. 586MM. 2 FLUID STEAM CONDENSATE
C.G. + 760 OP. 12. FOR INTERNAL PARTS EACH SURFACE, INCLUDING WELDS, EXPOSED TO THE PROCESS FLUID, SHALL HAVE A CORROSION TYPE OF SUPPORT LEG SUPPORT
HLL. + 900
180° ALLOWANCE AS FOLLOWS:- CORROSION ALLOWANCE FOR CARBON STEEL WELDED INTERNAL SHALL BE TWICE THE VESSEL IS-875 PART-3 2015 Ed+AMENDMENT
2 2 210° WIND 4.(Vb=44m/s, K1=1.07,K2=2,K3/K4=1,Cf=0.8)
PG CORROSION ALLOWANCE AND CORROSION ALLOWANCE FOR CARBON STEEL. REMOVABLE INTERNALS SHALL BE SAME AS
VESSEL CORROSION ALLOWANCE. ON FILLET OR SEAL WELDS ON INTERNAL ATTACHMENTS ADD THE FULL CORROSION IS-1893 PART-1 2016, Part-4
SEISMIC 2015+AMENDMENTS (Z=1.6,I=1.75,R=2)
40 THK. INSULATION ALLOWANCE TO THE THROAT THICKNESS NECESSARY FOR STRENGTH OR TIGHTNESS (THROAT THICKNESS SHALL NOT EXCEED
Z=0.16
(BY OTHERS)
VIEW 'V2-V2' 10 MM). WEIGHT DATA 2
NOZZLE ORIENTATION 13. VENT NOZZLE SHALL BE WELDED TO VENTILATION NOZZLE (V2) BLIND FLANGE Kg
SLS1 2 SHOP FABRICATED WEIGHT 1630
14. ALL TELL-TALE HOLES SHALL BE PLUGGED WITH HARD GREASE BEFORE DISPATCH.
EMPTY WEIGHT ( AT SITE) Kg 1660
15. ALL PRESSURE AND NON-PRESSURE PART ATTACHED TO PRESSURE PART ARE COMPILED CERTIFICATES AS PER EUROPEAN
525 STANDARD EN 10204 3.1, AND ALL OTHERS REMAINING PARTS CERTIFICATE 2.2 IS REQUIRED. ERECTED WEIGHT Kg 1660
BOTTOM
SHELL F 16. HYDROTESTING GASKET SHALL BE SAME AS GASKETS ARE THE SAME TYPE AS USED IN SERVICE. OPERATING WEIGHT Kg 2475
LG1 SHELL
LG2 17. UNLESS OTHERWISE INDICATED, NOZZLE PROJECTIONS ARE MEASURED FROM VESSEL CENTERLINE & T.L FIELD HYDROTEST WEIGHT Kg 2090 2
HINGE `W1' N 18. COAT ALL MACHINED SURFACES, SUBJECT TO ATMOSPHERIC CORROSION, WITH HEAVY RUST PREVENTATIVE GREASE.
2 12 LOADING DATA
5 586 SHELL I.D. 101 0° 19. SURFACE PREPARATION- EXTERNAL 5
THK. OPERATING FIELD HYDROTEST
SSPC-SP-10 - BLAST CLEANING TO NEAR WHITE METAL CLEANLINESS, UNTIL AT LEAST 95% OF EACH ELEMENT OF OPERATING (WIND)
505 (TYP.) (HOLD) (SEISMIC) DBE
FRICTION LOAD
(WIND)
SURFACE AREA IS FREE OF ALL VISIBLE RESIDUES WITH DESIRED SURFACE PROFILE.OATEx125µ
~ 2974.8 OVERALL HEIGHT

HH EL. + 400
20. PAINTING- EXTERNAL - DOCUMENT NO.077154C-000-JSD-2300-001 TABLE - 02 2.1.1 2 VERTICAL LOAD (N) SEE WEIGHT SEE WEIGHT N.A. SEE WEIGHT
ON NOZ F PRIMER DFT/ COAT TOTAL DFT
340° D 2
SHEAR LOAD (N) 1742 5640 N.A. 575
LLL. + 300 2 SSPC-SP-10 (TWO COMPONENT EPOXY PHENOLIC 1 COAT OF FP-10 (TWO COMPONENT EPOXY
SLS1 PHENOLIC COATING CURED WITH POLYAMINE MOMENT LOAD (N-m) 685 2831 N.A. 227
COATING CURED WITH POLYAMINE ADDUCT 2 2
ADDUCT HARDENER SYSTEM) @ 75 MICR. 250 MICR.
HARDENER SYSTEM) 1 COAT OF FP-10 @ 125 MICR. MATERIAL OF CONSTRUCTION
EL. + 200 DFT/COAT. DFT/COAT. (1X125=125) 2
LG2 LT2 SHELL SA 516 GR 70N
21. HEAT TREATMENT 2
HEAD SA 516 GR 70N
V4 EL. + 125 EL. + 125 V4 DISH END SHALL BE SUBJECTED TO NORMALIZING AS PER BELOW TABLE
U 505
NAME PLATE BODY FLANGE / COVER SA 105N / SA 105N
- `W2' - HEATING RATE HOLDING TEMP. HOLDING TIME MAX. UNLOADING
W.L. CS1 2 LOADING TEMP. COOLING IN CLAD / WELD OVERLAY N.A.
(MAX.) (MAX.) (MIN.) TEMP.
EL. + 0.00 B.T.L. + 101.500 HINGE NOZZLE FLANGE / BLIND FLANGE SA 105N / SA 105N
300° C (MAX.) 2 100°C/hr 2 910±10°C 2 40 MINUTS STILL AIR 2 -
270° 90° SHELL NOZZLE NECK (PIPE / FORGING) SA 106 GR B / SA 105N
PSV 22. POST WELD HEAT TREATMENT
S.F.

NOZZLE REINFORCEMENT (RF PAD / SRN) SA 516 GR 70N / N.A.


50

NOZZLES ON COVER FLANGE SHALL BE SUBJECTED TO STRESS RELIEVING AS PER BELOW TABLE
100° SHELL HEATING RATE HOLDING TEMP. HOLDING TIME COOLING RATE MAX. UNLOADING 2 SS 316 SPIRAL WOUND GASKETS WITH GRAPHITE
LOADING TEMP. GASKET FOR EXTERNAL NOZZLES/ BODY FLANGE
U (MAX.) (MAX.) (MIN.) (MAX.) FILLED SS 316 INNER RING & CS OUTER RING
2:1 ELLIPSOIDAL DISHEND TEMP.
4 102 4
14 THK.(NOM.) x 12 THK.(MIN.) 300° C (MAX.) 56°C/hr 610±10°C 170 MINUTS 56°C/HR 300°C EXTERNAL STIFFENERS N.A.
VORTEX BREAKER 2 EXTERNAL BOLTING / NUT SA 193 GR B7 / SA 194 GR 2H
490

23. MANDATORY SPARE EXTERNAL WELDED ATTACHMENT


HEAT TREATMENT NOT REQ UIRED FOR COVER
SA 516 GR 70N
BOLTING - 20% (MIN. 2 NOS.) FOR EACH INSTALLED JOINT. (EXT. CLEATS, LIFTING DEVICES,PAD ETC)
D 240° FLANGE AS NOZ Z LE ATTACHMENT SET ON TYPE.
GASKETS - TWO SETS OF EACH INSTALLED JOINT.
25

50 THK. FIRE HH 2 VORTEX BREAKER SA 516 GR 70N


60° SHELL 24. COMMISSIONING SPARE
PROOFING 180° LEG SUPPORT / PAD IS 2062 E250B / SA 516 GR 70N
176

(BY OTHERS) BOLTING - 10% (MIN. 2 NOS.) FOR EACH FLANGED JOINT.
GASKETS - 100% OF EACH SIZE AND TYPE. BASE PLATE IS 2062 E250B
2 140° SHELL
LT1 25. NOZZLE FOULING WITH WELD SEAM FOUNDATION BOLTS (BY OTHERS) IS 2062 E250 A (REF. NOTE 6)
THIS DOCUMENT OR DRAWING DEVELOPED BY " (TATA PROJECTS LIMITED) " IS THE PROPERTY OF INDIAN OIL CORPORATION LTD. AND SHALL NOT, UNDER ANY CIRCUMSTANCES, BE TOTALLY OR PARTIALLY,

2
SHELL 25.a. ANY WELD SEAM HAVING DISTANCE (WELD EDGE TO WELD EDGE) TO REINFORCING PAD OR NOZZLE (WITHOUT
2 LT2 EARTHING LUG SS 304
210 VIEW 'V3-V3' REINFORCING PAD) WITHIN 50MM (BUT NOT FOULING WITH WELD SEAM) SHALL BE FULLY RADIOGRAPHED AND DYE
3" x 2"NPS x SCH.160 70 70 2 TAILING LUG SA-516 Gr.70
PENETRANT EXAMINED TO A LENGTH EQUAL TO 100 MM ON EACH SIDE MEASURED FROM NEAREST POINT TO
UNEQUAL TEE NOZZLE ORIENTATION
1200

F REINFORCING PAD EDGE. NAME PLATE / NAME PLATE BRACKET SS 304 / SA 516 GR 70N
25.b. ANY WELD SEAM NOT FOULING WITH NOZZLE OPENING BUT COMING UNDER REINFORCEMENT PAD SHALL BE GROUND FITTINGS SA 234 WPB (SEAMLESS)
FLUSH, FULLY RADIOGRAPHED AND DYE PENETRANT EXAMINED TO A LENGTH EQUAL TO PORTION OF WELD SEAM BELOW
27° NAME 2 DAVIT SA 516 GR 70N / IS 2062 E250A 2
0° REINFORCEMENT PAD + 100 MM ON EACH SIDE.
PLATE
25.c. ANY WELD SEAM FOULING WITH NOZZLE OPENING SHALL BE GROUND FLUSH, FULLY RADIOGRAPHED AND DYE
3 NOS. LEG SUPPORTS
PENETRANT EXAMINED TO A LENGTH EQUAL TO HIGHER OF 3 TIMES OF OUTSIDE DIAMETER OF NOZZLE I.E. 1.5 TIMES OF
NOZZLE LOADING DETAIL TABLE
N AT 120° APART P
OUTSIDE DIAMETER OF NOZZLE ON EACH SIDE OR LENGTH EQUAL TO PORTION OF WELD SEAM BELOW REINFORCEMENT FORCE (kN) MOMENT (kN-m) MT
SL. SIZE NOZ.
3 3 NOS. ISA 110 x 110 x 12 THK. 300° 60° PAD + 100 MM ON EACH SIDE. 3
NO. NPS MARK
LEG SUPPORTS EQUI-SPACED VL P VC MC MT ML
REFERENCE SPECIFICATION
1 2 T, U 3.3 3.3 2.5 0.4 0.6 0.5
DOCUMENT NUMBER PART DESCRIPTION 2 3 PSV 4.9 4.9 3.7 0.9 1.3 1.1
DIRECTLY OR INDIRECTLY, TRANSFERRED, REPRODUCED, COPIED, DISCLOSED OR USED WITHOUT INDIAN OIL CORPORATION LTD. PRIOR WRITTEN CONSENT.

MC
ML
077154C-27794927-1836-PRO-PDS-037 PROCESS DATASHEET FOR LP CONDENSATE POT-2 (1836-V-009) 3 3 F FR=7.0 5.6 - MR=1.64 1.5 -
EP1 VC VL
077154C-000-JSD-0400-001 ENGINEERING DESIGN BASIS FOR STATIC EQUIPMENT
EP1-2 270° 90°
Ø30 HOLE FOR
077154C-000-JSS-0400-001 JOB SPECIFICATION FOR SUPPLY OF PRESSURE EQUIPMENT IBR SERVICE
077154C-1832-JSS-0400-101 JOB SPECIFICATION FOR PRESSURE EQUIPMENT IN SOUR SERVICE
150

M24 FOUNDATION BOLTS


077154C-000-STC-0490-000 STANDARD CONSTRUCTION DRAWINGS FOR PRESSURE EQUIPMENT 2 18.04.2024 ISSUED FOR APPROVAL KGS DNS DNS
(BY OTHERS) 27
EL. +100.300 Ø5 077154C-000-JSS-1360-001 JOB SUPPLY SPECIFICATION FOR GASKETS 1 12.07.2023 ISSUED FOR APPROVAL KGS DNS DNS
BASE PLATE ELEVATION 077154C-000-JSS-1370-001 JOB SUPPLY SPECIFICATION FOR FASTENERS
0 10.04.2023 ISSUED FOR APPROVAL KGS DNS DNS
210 x 180 x 25 THK. 077154C-000-JSD-2300-001 SPECIFICATION FOR PAINTING
527 B.C.D. BASE PLATE Date Description of Issue Written by Checked by Approved by
INSPECTION AND TEST PLAN FOR DRUMS (CS VESSELS / SS VESSELS / Rev DD / MM / YYYY
077154C-000-ITP-0810-001
CLADDED VESSELS AND LOW ALLOY STEEL VESSELS)
GENERAL SPECIFICATION FOR WELDING AND NDE FOR PRESSURE VESSELS DOCUMENT CATEGORY
INCORRECT DOCUMENT NO. 077154C-000-JSS-6300-001
VENDOR TO UPDATE IN AS BUILD. AND HEAT EXCHANGERS (USE " X " MARK) APPROVAL REVIEW INFORMATION
077154C-000-QCP-6820-001 QUALITY CONTROL PLAN - STATIC EQUIPMENT INSTALLATION
CONTRACTOR LOGO
077154C-000-QCP-2300-001 QUALITY CONTROL PLAN - PAINTING
2 EL. +100.000 2
GRADE 180° EP2 REFERENCE DRAWINGS
TPL/WORLEY DRG/ DOC.REF NO PMC DRG/ DOC.REF NO DESCRIPTION
SECTIONAL ELEVATION VIEW 'V4-V4' PMC/ EPCM Services for PETROCHEMICAL AND
500054-TPL-19274-C109-00025 077154C-27794927-1835-AEL02-MTE-A1003-010 DESIGN CALCULATIONS
LUBE INTEGRATION
NOZZLE ORIENTATION 500054-TPL-19274-D140-00037 077154C-27794927-1835-AEL02-MTE-A1109-009 SUPPORT & NOZZLE DETAIL
2 PROJECT “LuPech” (J-18) IOCL GUJARAT
500054-TPL-19274-D147-00025 077154C-27794927-1835-AEL02-MTE-A1112-010 NAME PLATE DETAILS REFINERY
500054-TPL-19274-D145-00025 077154C-27794927-1835-AEL02-MTE-C1009-010 TRANSPORTATION DRAWING PURCHASE ORDER NO.: SBU-O&G(OIL,GAS & HYDROCARBONS)/LUPECH J18-IOCL-MS BLOCK/500054/19274
SR NUMBER: -
HOLD LIST: VENDOR NAME: ARTSON ENGINEERING LIMITED
PMC DOCUMENT NO.: 077154C-27794927-1836-AEL02-MTE-A2001-006
60° L 0.8~2.5 2 CONTRACTOR DOC NO.: 500054-TPL-19274-D141-00037
OUTSIDE
MIN. 60° OUTSIDE VENDOR DOCUMENT NO.: AEL/6198/GAD/1836-V-009
106 STUD+2NUTS 1-1/2" 8UN x 300 LG. 2 2 24+5+3 SA 193 GR B7 / SA 194 GR 2H 76.1 - DOCUMENT TITLE: G.A. OF
2.5 ~4

105 COVER FLANGE 24 NPS x 300# x BLRF x 98 THK. x 3MM RF 1 SA 105N 515.0 ASME B16.5 LP CONDENSATE POT - 2
2
(1836-V-009)
T2

3 SS 316 SPIRAL WOUND


T1

3 CHIP BACK TO
GASKETS WITH GRAPHITE ITEM DESCRIPTION: LP CONDENSATE POT - 2
+5
-0

SOUND METAL & 104 GASKET 24 NPS x 300# x 4.5 THK. 1+2+1 4.6 -
THK.

75°
3

1 FILLED SS 316 INNER RING & CS TAG NO: 1836-V-009 PAGE NO: 1 OF 1 1
FPW REWELD 3 OUTER RING
103 BODY FLANGE 24 NPS x 300# x 12 THK. x WNRF 1 SA 105N 288.29 ASME B16.5 DOCUMENT REVIEW STATUS (T.EN) DOCUMENT REVIEW STATUS
(AS PER IBR REG. NO. 125(a)
3

FPW (CONTRACTOR)
FIG. 4 & XII/4) 102 BOTTOM DISHEND 14 THK (NOM.) x 12 (MIN.) I.D. 586 1 SA 516 GR 70N 64.78 2:1 ELLIPSODAL
L=8 (T2-T1) BUT NOT LESS THAN 38mm
SHELL + SHELL LONG. 101 SHELL Cir. 1877 x 1281 LG. x 12 THK. 1 SA 516 GR 70N 226.5 -
(AS PER IBR REG. NO. XII/1) (AS PER IBR REG. NO. 28(ix)(a))
SHELL + SHELL CIRCUMF. SHELL + HEAD CIRCUMF. NOZZ. NECK + FLANGE
PART
DESCRIPTION SIZE
QTY.+
MATERIAL
WEIGHT
REMARK
No. SPARES (KG)
WELD DETAIL-`W1' WELD DETAIL-`W2' WELD DETAIL-'W3'
BILL OF MATERIAL
A B C D E F G H I
CAD FILE NAME : 500054-TPL-19274-D141-00037_REV_2 (GA).DWG SHEET SIZE : A1
`
PETROCHEMICAL AND LUBE INTEGRATION PROJECT “LuPech” (J-18)”
AT IOCL GUJARAT REFINERY, VADODARA, GUJARAT,INDIA

EPCC-5 PACKAGE (MS BLOCK AND OCTAMAX UNIT)


CONTRACTOR: TATA PROJECTS LTD. DEC :
COMMENT RESOLUTION SHEET OWNER: INDIAN OIL CORPORATION LTD.
WORLEY INDIA PVT. LTD.
CONTRACTOR PROJECT NO. 500054-TPL-19274- Doc No.: 077154C-27794927-1836-AEL02-MTE-A2001-006
PMC : PMC : TECHNIP ENERGIES INDIA LTD
D141-00037 Title: GENERAL ARRANGEMENT DRAWING (1836-V-009)

PMC/ TPL / Worley Comments Vendor Reply PMC/ TPL / Worley OPEN / CLOSED
Sr No. Page no Response
Technip Comments on NOZZLE DETAIL DRAWING (1836-V-009) Action by Artson Date : 26/02/2024
dated. 26/02/2024

1 2 Noted and Updated.

2 2 Noted and Updated.

3 2 Noted and Updated.

4 2 Noted and Updated.

5 2 Noted and Updated.

6 2 Noted and Updated.

7 2 Noted and Updated.

8 2 Noted and Updated.

9 2 Noted and Updated.

10 2 Noted and Updated.

11 2 Noted and Updated.

12 2 Noted and Updated.

13 2 Noted and Updated.

14 2 Noted and Updated.

15 2 Noted and Updated.


16 2 Noted and Updated.

17 2 Noted and Updated.

18 2 Noted and Updated.

19 2 Noted and Updated.

20 2 Noted and Updated.

21 2 Noted and Updated.

22 2 Noted and Updated.

23 2 Noted and Updated.

24 2 Noted and Updated.

25 2 Noted and Updated.

26 2 Noted and Updated.

27 2 Noted and Updated.

28 2 Noted and Updated.

29 2 Noted and Updated.

30 2 Noted and Updated.

31 2 Noted and Updated.

32 2 Noted and Updated.

33 2 Noted and Updated.


34 2 Noted and Updated.

35 2 Noted and Updated.

36 2 Noted and Updated.

37 2 Noted and Updated.

38 2 Noted and Updated.

39 2 Noted and Updated.

40 2 Noted and Updated.

41 2 Noted and Updated.

42 2 Noted and Updated.

43 2 Noted and Updated.

44 2 Noted and Updated.

45 2 Noted and Updated.

R1

ELEVATION

1 OK NOTED & INCORPORATED

ELEVATION

2 OK NOTED & INCORPORATED

VIEW V2 - V2

3 OK NOTED & INCORPORATED

VIEW V2 - V2

4 OK NOTED & INCORPORATED

VIWE V3 - V3

5 OK NOTED & INCORPORATED


VIWE V3 - V3

6 OK NOTED & INCORPORATED

VIWE V3 - V3

7 OK NOTED & INCORPORATED

NOZZLE SCHEDULE

8 OK NOTED & INCORPORATED

NOZZLE SCHEDULE

9 OK NOTED & INCORPORATED

GENERAL NOTES

10 OK NOTED & INCORPORATED

GENERAL NOTES

11 OK NOTED & INCORPORATED

GENERAL NOTES

12

BILL OF MATERIAL

13 OK NOTED & INCORPORATED

DESIGN DATA

14 OK NOTED & INCORPORATED

DESIGN DATA

15 OK NOTED & INCORPORATED

16 OK NOTED & INCORPORATED

17 OK NOTED & INCORPORATED


18 OK NOTED & INCORPORATED