CISA Chapter 3 - Info Systems Acquisition, Development, Implementation - Quizlet

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

throughput

16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet
Definition 2 of 20
this approach ensures consistency and increases confidence in the functionality of the fallback
scenario - the migration project team completes a high level analysis of the legacy and new data
models to establish links between them that will be refined later

procurement phase

data interface

migration infrastructure

unit testing

Definition 3 of 20
the process of managing change to application systems while maintaining the integrity of both
the production hardware and application source and executable code

parallel testing

warehouse management layer

system maintenance practices

program coding standards

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 1/7
approach
16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet

registration authority

digital certificate

certificate authority

Definition 6 of 20
after a successful full-system testing (the programs have been tested and refined, program
procedures and production schedules are in place, all necessary data have been successfully
converted and loaded into the new system, and the users have developed procedures and been
fully trained in the use of the new system

object-oriented system development (OOSD)

when is the system ready to migrate to the production environment?

system testing

installation test plan

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 2/7
Definition 8 of 20
16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet
applies scientific and engineering principles to identify security vulnerabilities and minimize or
contain risk associated with these vulnerabilities

activities that are "crashed"/"relaxed"

configuration management

system maintenance practices

information system security engineer project role

Definition 9 of 20
focused on the documented specifications and the technology employed; verifies that the
application works as documented by testing the logical design and the technology itself. Ensures
that the application meets the documented technical specifications and deliverables; primarily
performed by the IT department

Quality Assurance Testing (QAT)

Billing Medicare And medicaid

Proficiency testing (pt)

Waived testing

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 3/7
u ct o /val dat o test g
16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet
analogous estimating

Definition 11 of 20
1) build the model to create the design then based on that model develop the system design with
all the performance, quality and mainenance features needed
2) gradually build the actual system that will operate in production using a 4GL that has been
determined to be appropriate for the system being built

Phase 1 of SDLC approach: Feasibility Study

two methods or approaches to prototyping:

objectives of project portfolio management

Entity Relationship Diagram (ERD)

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 4/7
1) traditional proprietary version of EDI used by large companies and government parties
16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet
2) development of EDI through the publicly available commercial infrastructure offered through
the Internet (more risky)

Two approaches related to electronic data interchange (EDI)

what kind of approach to implementing DSS should an org use?

Major advantage of timebox management

two types of encryption to ensure security of emails

Definition 14 of 20
time it takes help desk to fix a problem

response time

waiting time

turnaround time

throughput

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 5/7
project
16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet

program/unit testing

senior mgmt project responsibilities

output analyzers

project portfolio

Definition 17 of 20
to enable a single physical computing environment to run multiple logical, yet independent
systems at the same time

main focus of virtualization

component-based development

knowledge interface

program

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 6/7
heavyweight project management
16/06/2024, 23:02 CISA Chapter 3 - Info Systems Acquisition, development, implementation | Quizlet

matrix project organization

message digest

moving

Definition 20 of 20
supports the process of ensuring that the system is production-ready and satisfies all
documented requirements

Performance testing

Unit testing

User Acceptance Testing (UAT)

Sociability testing

Privacy Terms English (UK)

https://quizlet.com/250811713/test?answerTermSides=2&promptTermSides=6&questionCount=20&questionTypes=4&showImages=true 7/7

You might also like