Professional Documents
Culture Documents
Routine Maintenance Cost Structure
Routine Maintenance Cost Structure
PROJECT: “EMP. LA100 (EL CINCO-TOTORAS PAMPA VERDE) FROM KM 00+000.00 TO KM 08+200.00; PTE ROAD. PALO BLANCO - PALA BLANCO - VILLARUMI - CANGREJERA FROM KM 00+000.00 TO KM 22+180.00”
SECTION: TOTAL (1 AND 2)
LENGTH: 30.38 km
PLACE: EL CINCO - PAMPA VERDE TOTORAS; PTE ROAD. PALO BLANCO - PALA BLANCO - VILLARUMI - CANGREJERA
DATE: Friday, September 11, 2020
MR-300
VEGETATION CONTROL Rubbing and Cleaning 0.00 0.00 369.00 0.00 0.00 0.00
MR-301
m2 4,100.00 0.09 369.00
0.00 0.00 143.46 0.00 0.00 0.00
MR-400 ROAD SAFETY
MR-401 Sign Conservation
und 18.00 7.97 143.46
MR-500
ENVIRONMENT Reforestation
0.00 0.00 0.00 0.00 0.00 0.00
MR-501
und 0.00 0.34 0.00
0.00 0.00 21.48 0.00 0.00 0.00
MR-600 ROAD SURVEILLANCE AND CONTROL
MR-601 Surveillance and Control km 8.20 2.62 21.48
MR-300
VEGETATION CONTROL Rubbing and Cleaning 998.10 0.00 0.00 0.00 0.00 0.00
MR-301
m2 11,090.00 0.09 998.10
382.56 0.00 0.00 0.00 0.00 0.00
MR-400 ROAD SAFETY
MR-401 Sign Conservation
und 48.00 7.97 382.56
MR-500
ENVIRONMENT Reforestation
0.00 0.00 0.00 0.00 0.00 0.00
MR-501
und 0.00 0.34 0.00
58.11 0.00 0.00 0.00 0.00 0.00
MR-600 ROAD SURVEILLANCE AND CONTROL
MR-601 Surveillance and Control km 22.18 2.62 58.11