Professional Documents
Culture Documents
Potongan1 A1 - A2 Blok B: Numara Bintaro
Potongan1 A1 - A2 Blok B: Numara Bintaro
BLOK B
Jl. Darmawangsa IIB no.4
Jakarta Selatan
0+05
Stripping = 0,00 sqm
bidang persamaan
reference level
-3,00
-1,724
-1,813
-1,809
-1,557
-1,485
-1,497
-1,441
-1,415
-1,522
-1,425
-1,381
-1,100
-1,000
-0,834
ELEVASI TANAH AKTUAL
ORIGINAL GROUND LEVEL
JARAK (m)
0,74
0,78
0,76
3,30 2,26 4,05 5,42 5,28 1,72 3,23 2,69 2,55 1,98
DISTANCE (m)
SYMBOL :
0+10
Stripping = 0,00 sqm
bidang persamaan
reference level
-3,00
-1,813
-1,876
-1,843
-1,486
-1,510
-1,534
-1,443
-1,645
-1,554
-1,547
-1,100
-0,941
-0,922
-0,865
ELEVASI TANAH AKTUAL
ORIGINAL GROUND LEVEL
JARAK (m)
0,93
0,89
2,67 3,74 3,60 4,94 7,84 2,69 2,23 1,27 2,43 3,90 2,66
DISTANCE (m)
Soding = 0,00 m
0
NUMARA BINTARO
bidang persamaan
reference level
-3,00
-1,809
-2,087
-1,750
-1,721
-1,497
-1,509
-1,482
-1,606
-1,678
-1,670
-1,456
-1,354
-1,281
-1,280
ELEVASI TANAH AKTUAL
ORIGINAL GROUND LEVEL
JARAK (m)
0,70
0,48
0,23
3,07 3,25 1,39 7,43 8,15 2,90 1,48 1,78 2,50 7,02
DISTANCE (m)
CLIENT :
SYNERGI
DRAWING TITLE :
0+19.13
Excavation
Embankment =
= 0,00 sqm
0,00 sqm
DENAH GENERAL
Soding = 0,00 m
0
-2,182
-1,999
-1,531
-1,466
-1,490
-1,715
-1,890
-1,702
-1,446
-1,339
-1,377
-1,296
ELEVASI TANAH AKTUAL
PROJECT DRAWING
ORIGINAL GROUND LEVEL ISSUED FOR
CODE NUMBER
JARAK (m)
0,29
1,73 6,04 1,57 6,37 4,84 1,20 1,69 7,27 2,46 5,39 1,95
DISTANCE (m)
PRE-
CONCEPT AD001 A100