Letter No 072.MGP - PAMA.2016 January Revisi
Letter No 072.MGP - PAMA.2016 January Revisi
PT. Bharinto Ekatama would like to inform PAMA about revised inpit production target for
working period January 2017 as detailed below:
BEK also notify Pama to control SR on January 2OL7 and the exceed OB volume from nominated
SR would not be pay on that period.
Pama have to control working area to prevent overcut and/or overdig that BEK keep to NO PAY
for those overplan (overcut, overdig).
OUTGOING
Mine Geology and Planning Head qr_^ 3:0i!illi
CcTo:
- Mr. Padungsak Thanakij (Melak Group Cluster Head)
- Mr. Deddy Sugiharto (Melak Group Deputy)
- Mr. Robert Jacob Scheeres (Melak Group Cluster Advisor)
- Mr. Prayono S. (KTT/Mine Head)
- Mr. Lauren Karyadi (Melak Group FA Head)
- Archived
PT Bharlnto Ekalama Kladl Slle Ottlc€ :
Pondok lndah Ofiico Tower lll.3dtloor Desa Muara Begai
Jl. Sultan lskandat Muda, Kecamalan Muara Lawa
Pondok lndah Kav V-TA Kabupalen Kulai Baral
Jaka a Selalan 12310 Kal'manlan Imur 75775. lndonesia