: FABS-001-FO-0016
JOB SAFETY AND ENVIRONMENT ANALYSIS Revision : 01
Effective Date : 1 March 2013
PROJECT : I&F Formulation Project LOCATION OF WORK : CORTEVA - MEDAN PLANT Analysis By : I Putu Yoga DATE : 10 October 2019
Reviewed By : Agus
SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARD / ASPECT RISK /IMPACT RECOMMENDED ACTION OR PROCEDURE WHO
Work preparation Don't understand the work method There was an accident and Conduct toolbox meeting before work All worker
reworked
Make sure permits are available and in accordance with work SPV and HSE
activities
Supervisors must explain the work plan and potential hazards SPV and HSE
to workers
Make sure workers understand the potential hazards All Worker
Install the base foundation for a container office Manual Handling Muscle injury Make sure good ergonomic position when doing manual SPV and HSE
handling activities
To maximize usage of machinery aid to minimize manual SPV and HSE
handling.
To organize work rotation SPV and HSE
Never lift heavy load alone, seek assistance from other SPV and HSE
(maximum load per person is 25 kg)
Pinched Wound Avoid pit points SPV and HSE
Good coordination among co-workers during the manual SPV and HSE
handling process
There should be no workers standing on the crane platform SPV and HSE
while the crane is operating
Trailer and crane Enter the work area Hit by Heavy Equipment Fatalityn and Property damage To install traffic cone and safety warning signage to separate SPV and HSE
the pedestrian and acess road
Make sure the driver has a driving license SPV and HSE
To prepare safe designated access and egress road for SPV and HSE
construction machineries mobilization.
To provide flagman to control machineries movement SPV and HSE
Unloading of container office Crane overturning during lifting Fatalityn and Property damage Make sure the crane is certified and inspected by the client SPV and HSE
Ground to be level and able to stand the weight of SPV and HSE
machine(install Steel matras)
Provide one person to monitor the outrigger's condition SPV and HSE
Make sure crane operating license (SIO for operator and SILO SPV and HSE
for equipment)
Make sure the operator is competent and familiar with the SPV and HSE
type of crane
Wire sling breaks during the lifting Wound and Property damage Make sure there is no damage / defect in the sling SPV and HSE
process SPV and HSE
Make sure the wire sling passes inspection and install the
inspection tag
Make sure rigging arrangements not exceeding Safe Working SPV and HSE
Load (SWL) slings.
Make sure rigging is done by a competent rigger SPV and HSE
Hit by swinging container Fatality To use Tag Line to control load movement SPV and HSE
Make sure the line of fire is free from unauthorized people SPV and HSE
Do not do lifting activities during high winds / bad weather SPV and HSE
Keep safe distance during process swinging container SPV and HSE
Do not be in the blind spot area of the operator cabin SPV and HSE
There should be no workers standing on the crane platform SPV and HSE
while the crane is operating
Oil and Fuel Spill Environmental pollution Make sure that no fuel lines or hydraulic hoses are leaking SPV and HSE
Provide spun kits and spill kits in the work area SPV and HSE
Make sure that no fuel lines or hydraulic hoses are leaking SPV and HSE
Provide a fire extinguisher around the work area SPV and HSE
Bad Housekeeping Slip, trip, and fall Tidy up the work area when finished the activity SPV and HSE
Reopen the barricade and remove the safety sign SPV and HSE