Rev.

00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

SAFE WORK PROCEDURE


FOR REMOVAL OF MATERIALS THAT
THEY CONTAIN FRIABLE ASBESTOS AND
DO NOT
FRIABLE

Work: “Conservation service of


establishment, Liceo Pablo Neruda”

Made by: Reviewed by: Approved by:


Date: 08/18/2021 Date: Date:
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

INDEX

Work: “Conservation service of establishment, Liceo Pablo Neruda”...............................................1


INDEX..........................................................................................................................................2
1.1. General objective...............................................................................................................3
1.2. Specific objectives.............................................................................................................3
2. SCOPE...................................................................................................................................3
3. RESPONSIBLE.....................................................................................................................3
4. REFERENCES..........................................................................................................................4
5. DEFINITIONS......................................................................................................................4
6.1. Work procedures for handling asbestos.............................................................................5
6.2. Control measures adopted to prevent the generation and dispersion of asbestos fibers
into the environment.....................................................................................................................7
6.3. Personal protection elements (PPE)...................................................................................7
6.4. Characteristics of the worker decontamination zone.............................................................8
6.5. Procedures for evaluation and control of the work environment.....................................10
6.6. Waste management..........................................................................................................10
Non-Hazardous Waste................................................................................................................11
to. Waste of asbestos materials in good condition : Roofing sheets.....................................11
ID.................................................................................................................................................11
6.8. Training and training content for workers.......................................................................13
6.9. Medical surveillance program for workers......................................................................13
7. RECORDS...........................................................................................................................15
8. ANNEXES...........................................................................................................................16
7.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

1. AIM.

1.1. General objective

• Control the risks inherent to working with asbestos, both for workers and the environment,
in order to prevent health effects.

1.2. Specific objectives

• Define the responsibilities of workers.

• Establish an appropriate procedure for working with Asbestos-Containing Materials.

• Establish adequate management of waste generated at work.


• Provide personnel who work with asbestos-containing materials with the
necessary knowledge to prevent exposure to asbestos and thus avoid diseases.

• Carry out control of established activities and procedures.

2. SCOPE.
This procedure applies to all workers who carry out the work called: “Liceo Pablo Neruda
Establishment Conservation Service” and whose activity is the removal, storage and/or
transportation of asbestos, whether it is scheduled or emergency work.

3. RESPONSIBLE.

• Contract administrator : They will be responsible for ensuring that this


instructions are known and applied by all your staff.

• Supervisor : They will be in charge of applying the instructions, maintaining the


elements available for the correct execution of the work and supervise its compliance.

• Risk Preventionist : Will be responsible for technically advising on the interpretation of


this procedure, delivering the protection elements and coordinating the environmental
evaluation and surveillance examinations with the administering body.

Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.
• Workers : Carry out work to handle friable and non-friable asbestos.
friable according to these instructions.

4. REFERENCES.

• decree SupremeNo. 40 – Regulation on Risk Prevention Professionals.


• decree SupremeNo. 594 – Regulation on Basic Sanitary Conditions in
the workplaces.

• decree SupremeNo. 148 – Regulation on Waste Management Dangerous.


• decree SupremeNo. 656 – Prohibits the Use of Asbestos in Products which
indicates.

5. DEFINITIONS.

• Friable Asbestos : Asbestos mineral that is free, in sleeves, packages or as part of a


material, in a condition to crumble.

• Non-Friable Asbestos : Asbestos mineral that is encapsulated with some material that
does not allow it to crumble.
• Demolish : Includes the work of dismantling or partially or demolishing
completely a work or building.

• Dismantle : corresponds to the tasks of partially or completely disassembling


a work, ship, building, machine or equipment.

• Generating or owner company : natural or legal person to whom


The facility, activity, equipment or machinery that contains asbestos materials belongs.

• Performing Company : Natural or legal person responsible for carrying out


operations with materials containing asbestos, which must have a Health Authorization.

• Encapsulation : confine a material containing asbestos, to prevent it from


fibers are released from it.

• Asbestos-Containing Material (ACM): That which contains asbestos. As


For example, the following materials manufactured before 2001 that contain asbestos:
asbestos-cement products such as Pipes, Roof Tiles, Corrugated Sheets,

Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

Smooth sheets, Water storage ponds, some Thermal and/or Electrical Insulation
Materials, materials to cover the floor such as vinyl floors, among others.

• Friable Asbestos-Containing Material (MCAF): Material that contains asbestos and


when dry, can be crumbled, pulverized or reduced to powder with hand pressure. It also
includes non-friable material, which after being damaged and dry, can be crumbled,
pulverized or reduced to powder by hand pressure.

• Non-Friable Asbestos-Containing Material (MCANF) : that material that contains


asbestos, but when dry cannot be crumbled, pulverized or reduced to powder by hand
pressure.
• Preserved material: that which maintains its structure without alteration.

6. DESCRIPTION.

6.1. Work procedures for handling asbestos

6.1.1. Work procedure

• First carry out a visual inspection of the building or work.


• Identify asbestos materials.
• Since the material to be removed is at a height, scaffolding will be used for the job.
sure.

• Workers must have a safety harness with a Y-type life tail.

• If a material is suspected of containing asbestos, while there are no laboratories that


have the analysis techniques for these materials to confirm and rule out the presence of
asbestos fiber in them, they must be removed as if they actually contained this fiber.
• Use special personal protection elements, Tyvek paper coverall, double-filter half-face respirator,
p100 filter.
• Mark the area where the asbestos material is found.
• Only the workers who will carry out said work may be present at the site.

• Sheets, pipes or other asbestos materials should not be sawed, sanded, polished, tapped or
drilled.

Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

• When intervening on an asbestos sheet, the repair must be carried out by moistening the surface
in order to minimize the release of fiber. This humidification will be carried out through water.

• An effort will be made to cut in the same direction of the wind so that the dispersion of the fibers
does not directly affect the affected worker.
6.1.2. To lower or raise asbestos material.

• For lower the plates with asbestos from the ceiling should be done between 2
workers.

• For move materials of asbestos thatit is impossible to maneuver manually either


To raise or lower them, slings or other mooring equipment must be used, and its status must be
verified prior to each activity.

• When the material is greater than 25kg, lifting must be carried out using mechanical help.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

6.2. Control measures adopted to prevent the generation and dispersion of asbestos fibers
into the environment

• Before removing the asbestos material, moisten the materials with a product that prevents the
release of asbestos fibers (example: 20% vinyl latex solution).
• Clean the structure where the asbestos material was located.
To do this, use damp cloths so that no asbestos fiber remains.

• The waste generated from this cleaning must be disposed of with the rest of the waste
contaminated with asbestos, in well-sealed and labeled bags.

• The material containing asbestos (sheet, pipe, etc.) must be wrapped in plastic at least
80 microns thick or another type of wrapping, but of equal or better quality and labeled.

• The bags or other systems used must be sufficiently resistant to allow the transportation
and final disposal of this waste without breaking it.

6.3. Personal protection elements (PPE).

• The following PPE will be provided to workers:


- Respiratory protection: 3M 6200 half-face mask or another with equal or greater protection
with a P100 or similar filter.
- Work clothing: disposable coverall (Tyvek type) with hood and shoe covers.
- safety shoes o Safety boots.
- Nitrile gloves
- Sealed goggles with adjustment to the contour of the face
- Safety helmet

• The use of disposable respiratory protection will not be accepted.

• All disposable PPE must be placed in labeled containers and disposed of along with the rest of
the waste generated.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

6.4. Characteristics of the worker decontamination zone.


Only workers handling the MCA will be decontaminated in this area.
The decontamination zone will be as close as possible to the work area.

Characteristics:

• The decontamination zone will be made up of three zones: “Dirty Zone”, “Dirty Zone”.
Showers” and “Clean Zone”, located in a linear manner.

• These areas will be clearly marked on the outside, so that they are
easily identified by workers.

• The surface for each area must be at least 1 m 2


per worker, and the total surface must
be associated with the number of workers who will use this area (dirty, shower and
clean) simultaneously.

• The dirty area and the shower area will be waterproofed, including its walls, doors, floors and
ceilings.
• Access to the dirty area will be independent of access to the clean area.

• Access to the dirty area will have a security perimeter, to prevent people or communities
outside of this activity from traveling nearby and being exposed to asbestos fibers.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

6.4.1. Dirty Area

• In this area, workers will clean their PPE to ensure that no asbestos fibers are released
into the air.

• In this area, a container will be installed where disposable PPE contaminated with
asbestos will be disposed of. This container will be in a good state of cleanliness,
labeled, with a plastic bag inside and a lid.
• Activities in this area:

Area Activities

1. Moisten PPE clothing with a manual sprayer, clean with sponges or


PPE Cleaning
damp cloths.

2. Withdrawal of helmet and goggles.

PPE removal 3. Withdrawal of shoe covers and safety shoes.


sequence 4. Withdrawal of disposable diver.
5. Withdrawal of mask.

Residuous 6. Deposit the PPE in the container identified for waste


generation asbestos.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

6.4.2. Shower area

• The cloakroom must be equipped with a shower with hot and cold water (the
number of showers will be calculated according to the provisions of article 23 of
DS 594/99).
• Only workers handling the MCA will be decontaminated in this area.

6.4.3. Clean Zone

• The Zone will have 2 lockers per worker, one of them to store clean clothes (street) and
the other to store PPE that is not disposable and that has been decontaminated before
being stored.

6.5. Procedures for evaluation and control of the work environment.


For scheduled work with friable asbestos, the CCHC Mutual Safety Agency will be requested to evaluate
asbestos fibers in the air. DS No. 594 establishes in its article 66, the weighted permissible limit for all
types of asbestos in workplaces, its value being equal to 0.1 fibers/cc. The results will be communicated
to the area, according to these additional controls will be defined.

6.6. Waste management


The waste generated from MCA (roofing sheets) cannot be sold, reused, or given away. MCA can be
classified, according to its risk, as hazardous or non-hazardous waste.

6.6.1. non-hazardous waste

• Non-friable asbestos material waste that is in good condition (not damaged or broken).

• This material must be encapsulated.

• All measures indicated in point 6.2 “Control measures adopted to prevent the generation
and dispersion of asbestos fibers into the environment” must be taken.

• To remove waste, authorization must be requested from SEREMI de Salud. This through
the “Request for authorization of treatment and/or final disposition” form. of waste
industrial solids for generators, this
The form must be requested at the offices of the respective SEREMIs.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

Non-Hazardous Waste

to. Waste of asbestos materials in good condition : Roofing sheets

ID
Classificatio "Asbestos-containing materials"
n

DANGER

WASTE WITH ASBESTOS


AVOID BREAKING OR RELEASE OF DUST
Signaling
ASBESTOS FIBER CAN PRODUCE CANCER AND OTHER
DISEASES WHEN INHALED
(COMPANY NAME AND TELEPHONE OF THE GENERATOR)

6.6.2. Hazardous waste

• Residue of friable or non-friable asbestos material that is broken, fragile or in poor


condition (easy to break).

• This material must be encapsulated and all the measures indicated in point 6.2 "Control
measures adopted to prevent the generation and dispersion of asbestos fibers into the
environment" must be taken.
• For Management, the provisions of this procedure must be complied with.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

Hazardous Waste
to. Waste with dust and/or asbestos fiber : PPE, cleaning cloths, filters.

b. Waste of materials with asbestos in poor condition (easy to break) : pipes,


sheets, ponds, insulation, among others.

ID
A2050 Asbestos waste (dust and fiber).
DS code No.
148 II.18 Asbestos dust and/or fibers, excluding waste construction materials
manufactured with asbestos cement.
Dangerousnes Chronic Toxic
s

Label
d)
NCh 2190

6.6.3. Construction characteristics of the storage site


The waste storage sites will be authorized, for this the respective authorization for the storage of non-
hazardous industrial waste or authorization for the storage of hazardous industrial waste must be
requested from the Health Authority, as appropriate.

The following construction characteristics will be met:

• Perimeter closurefireproof.
• Light roof.
• continuous base, solid,smoothand raincoat.
• Signaling.

6.6.4. Container Features


Disposable PPE, cleaning cloths and other smaller asbestos waste will be deposited in containers, which
must meet the following requirements:

• Built with materials that are resistant to stored waste.


• Designed to resist stresses produced during handling.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

• In good conditions.
• Have a cover.
• Labeled visibly.
• Have a plastic bag inside.

6.7. Transfer of the MCA

6.7.1. Transport to temporary storage site

• The transportation of the MCA from the point of generation to the temporary storage
place will be in appropriate vehicles depending on the quantity to be transported.
• Waste must be encapsulated and labeled.
• The personnel carrying out the transportation must be trained.

6.7.2. Transport to final disposal


Hazardous and non-hazardous waste generated at work will be transported by authorized companies.

You must not remove asbestos-containing waste generated until you have the respective Health
Authorization Resolution for the final disposal of non-hazardous industrial solid waste for generators.

6.7.3. Final disposal of the waste generated


The disposal of hazardous and non-hazardous waste will be in a company authorized to receive this
waste.

6.8. Training and training content for workers


All workers involved in work with MCA must be compulsorily trained and trained before the start of work.

6.9. Medical surveillance program for workers


All exposed workers will be entered into the “ Worker Health Surveillance Program for Asbestos Exposure
” at CCHC Mutual Safety. To prove that the worker is in the program, a certificate or an email will be
requested from the administrative body to which the company is affiliated.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.
6.10. Signage
To demarcate the work areas, the signage formats indicated below will be used, with which restricted
areas, risk zones in the work area, MCA waste and containers with waste will be demarcated.

In addition, areas with restrictions or prohibited activities will be marked, such as:
- Smoking and eating are prohibited in work areas.
- Use of PPE required by area.
- Decontamination zone; clean area, dirty area, showers.
- Restricted access.

Work area
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

Waste Zone

7. RECORDS.
To control the established activities and procedures, the following records are used:

• Dissemination of safe work program for Materials Containing Asbestos.

• Inspection of personal protection elements.

The records, including this Work Plan, must be MAINTAINED ON SITE in such a way that they can be
easily consulted if requested.
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

8. ANNEXES.

Annex 1: Asbestos management diagram

Annex 1: Asbestos management diagram

CASE Nº 1: Established flow for authorization of the execution of works, transportation and final disposal
of waste with Non-Friable MCA (non-hazardous waste)
Rev. 00
APM PARTNER SPA
SAFE WORK PROCEDURE FOR REMOVAL OF
CONSTRUCTION
FRIABLE AND NON-FRIABLE ASBESTOS- Date: 18 – 08 - 2021
CONTAINING MATERIALS.

CASE Nº 2: Established flow for authorization of the execution of works, transportation and
final disposal of waste with Friable MCA (hazardous waste)

I submit documentation at
least 1 week before starting
work.
Issuance of
Documentation; SEREMI of Health
Resolution of
Application(*) and Plan Job Analyze information.
Authorization for
in
execution of work
customer service officeuser
and final disposition of
of
MCA .
SEREMI of Health.

t
Execution of work.

Execution of the withdrawal of


MCA.

Storage in Respel

o
Warehouse.

For withdrawal from the


warehouse, declare in
SIDREP

Notification of the start of


work 72 hours in advance.

Transportation and final


disposal of waste.

NOTE: If the material containing Asbestos is Friable, you CANNOT begin the work until you have the
respective Health Authorization, which authorizes both the execution of the work and the removal and
final disposal of the asbestos-containing waste generated.