Professional Documents
Culture Documents
KHOSLA
KHOSLA
Design of Spillway
Name of the Project:- Hariharpur Lake Protection and Integrated Irrigation Development Project
Location:- Kapilvastu
Name of River:- Hariharpur Taal
Formula used
U/S total energy line, m
Q = 1.705*(L-0.1nH)H3/2 For broad crested weir
Where, L = Total clear waterway(m) Q = 1.705*(L-0.1nH)H3/2 (If H<1.5x width of crest)
H= head over the crest (m) For sharp crested weir
n= no. of end contraction Q = 1.84*(L-0.1nH)H3/2 (If H>1.5x width of crest)
Discharge through weir (m3/s)
Data