1.

Design of Spillway

Name of the Project:- Hariharpur Lake Protection and Integrated Irrigation Development Project
Location:- Kapilvastu
Name of River:- Hariharpur Taal
Formula used
U/S total energy line, m
Q = 1.705*(L-0.1nH)H3/2 For broad crested weir
Where, L = Total clear waterway(m) Q = 1.705*(L-0.1nH)H3/2 (If H<1.5x width of crest)
H= head over the crest (m) For sharp crested weir
n= no. of end contraction Q = 1.84*(L-0.1nH)H3/2 (If H>1.5x width of crest)
Discharge through weir (m3/s)

Data

Average bed level, m 117.30 Weir/Barrage


Full Supply Level, m 117.85 Nos. of piers 0.00
High flood discharge,m3/s 30.00 Width of each pier, m 0.00
Nos.of bays 1.00
High flood level, m 119.80 Width of each bay, m 24.00
Head regulator crest level, m 117.80 Overall waterway of Weir, m 24.00
Canal bed Level, m 117.60 Weir crest Level, m 119.30
Afflux, m 0.30 Total overall waterway, m 25.00
Average grain size, mm 0.32 Avg. discharge intensity, m3/s/m 1.20
Average Existing Waterway,m 24.00 Velocity head,m 0.03
Concentration, % 20.00 Head over weir crest, m 0.83
Bed Retrogression, m 0.50 Width of weir crest, m 1.50
Safe Exit gradient 0.17 Discharge through weir, m3/s 31.03
Silt factor 1.00
Lacey's waterway, m 26.02
Pond level, m 119.30
Normal Scour Depth,m 1.53
Approach velocity, m/s 0.79
U/S total energy line, m 120.13