Check List
Check List
A NuviotiaCPSE
Statement of Test reguired Vs. Every 4th Bill basis materials/ MTC Every 4th Bill
Conducted on building Materials (4th, 8th,.....) received on site (4th, 8th,.....)
Statement of recovery of
5 Mobilization Advance Every Bil Every Bil
(proaressive)
CP CP -
7
Manufacture test certificates of With respective Bill |With respective Bill
the bought out materials
CP Cp
Copy of Workmen Compensation
11 policy duly valid First/Renewal First/Renewal
25|0s]2094 T4tos ons
Suo
EPF Registration Number Cp Cp
12
of RPFC First/Renewal First/Renewal
Cp Cp
13 Challan of Deposit of EPE Every Bill Every Bill
8o
|Undertaking by the Contractor in Cp cp
14 Compliance of the labour laws Every Bill Every Bill
and EPFESI Act.
Cp Cp
18
Copy of Performance Bank Every Bil Every Bill
Gurrantee duly valid 82to 85
= 18|os|2026
CP CP
19 Statement of Facilities Every Bill Every Bill
Upon Actual
Waterproofing and Anti-termite Completion &before
20 Bank Gurantee and Gurantee Final BillOnly
release of SD, not with
Bond
interim blls
|Acceptance of Deductions/ CP Cp
21 Every Bill Every Bill.
recovery
To be appended by
RBG/SBG Head with To be appended by
22 Undertaking Certificate Every Bill Every Bill
Bil RBG/SBG Head with bill
CP
23 Quality Test Reports With respective Bill With respective Bill
8to 119
NBCC contrgeto