GROUND FLOOR PLAN - 13APRIL2020 - FKY - Clashes 2
GROUND FLOOR PLAN - 13APRIL2020 - FKY - Clashes 2
Ditto to 1.
Ditto to 1.
This area only
This area only approx 4.85m
This area only
approx 4.85m clear. Is automation
approx 4.85m
clear. Is bag system ok?
clear. Is automation
automation bag
bag system ok?
system ok?
3. Kindly advise
what is the height
2. Pls advise the clearance from FFL Ditto to 3
height clearance required?
Ditto to 1 from FFL required
for this conveyor.
Ditto to 1. Ditto to 1.
1. Automation bag
system clashing with
beam (refer to beam
height in Section
dwgs), pls advise
what is height
clearance from FFL
required?
Does this area
require any
headroom above
4.85m?