Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

S.H.E.

CLEARANCE FORM
REQUIREMENTS TO GET WW ID BADGE

To work at WW area, must FIT & pass SHE induction. Utk bekerja di WW harus sehat dan lulus SHE induction.
Company Name Company phone no. - Working Area Power Station
Contractor supervisor Irvan Fitrianto Cont. spv phone no. - Type of Work
Contractor to fill & submit this form to WW medic 3 days prior induction, attachments copy of: health certificate (MCU), identification card & competency certificate.
Kontraktor mengisi & mengirim form ini ke WW medic 3 hari sebelum induksi, disertai copy lampiran: surat sehat (MCU), tanda pengenal, & sertifikat kompetensi.

Y N The contract will utilize operational vehicle. Kontrak ini akan memakai kendaraan operasional. (Vehicle shall inspect by WW SHE, driver must pass WW SIM).
Y N The contract will require additional local manpower. Kontrak ini akan membutuhkan tambahan pekerja lokal. (Coordinate with ER team)

Work Competency Induction


No Name Job Position Signature* Induction result# MCU result#
Duration Certificate date*
Student Y/N
Azharie Fairuz
1 1 month 1 1 1 FIT
Novandhia
Student 1 month Y/N 2 FIT
2 Fikry Aulia Tirta 2 2

Saya sudah menerima penjelasan Aturan Kerja di WW, saya mengerti dan akan mematuhi selama bekerja di Wayang Windu area.
Jika kedapatan saya melanggar aturan kerja WW, saya bersedia ditegur & menerima konsekuensi sesuai aturan yg berlaku.
Hereby, I have received explanation of WW Work Rules; I am understood and will abide by while working in the Wayang Windu area.
If caught violating the WW rules, I am willing to be remind and receive all the consequences according applicable rules.

Contractor Spv WW/SE Contract Spv Inducted by SHE Representative Remarks:

Saleh Suryadi
Irvan Fitrianto
Notes: * to fill during SHE induction; # to fill by WW SHE team; SHE induction material refer to ‘SPE.WR.101c General SHE Rules.doc’

WWMS Form: SPE.WR.101a Page 1 of 1 Print Date: 29 June 2024

You might also like