HARYANA ORBITAL RAIL CORRIDOR (HORC)

PROJECT

Design and Construction of Civil Works (Earthwork, Bridges, Station Buildings, Retaining Walls and other miscellaneous Works) from km 29.68
to km 49.70 & from km 55.60 to km 61.50 and its connectivity's to IR network from New Patli to Patli station & New Patli to Sultanpur station
including modifications/civil works at Sultanpur Station in connection with laying of New BG Double Railway line of HORC project.

CLIENT Haryana Rail Infrastructure Development Corporation Ltd


GENERAL CONSULTANT (GC) RITES Ltd. In consortium with SMEC int. Pvt.Ltd.
EPC - CONTRACTOR M/S PNC Infratech Limited.
DETERMINATION OF CALIFORNIA BEARING RATIO OF SOILS
(IS : 2720 - Part 16)
Type of Material Borrow Area Soil Date of Casting 01.01.2024
Source of Material BA NO. - 9 Date of Testing 05.01.2024
Location/Chainage 35+000 RHS @8.0 km Tested By Jointly
Sample No. Sample No. - 04 Proving Ring Factor (kg/div.) 6.792
Method of Casting Dynamic MDD (gm/cc) 1.905
Surcharge wt. (kg.) 5 OMC (%) 10.20
Density Description:-
Before Soaking After Soaking Before Soaking After Soaking Before Soaking After Soaking
No. of Blows
55 55 55 55 55 55
CBR Mould No. 10 10 11 11 12 12
Weight of Mould(gm) 6230 6230 6300 6300 6119 6119
Volume of Mould (cc) 2250 2250 2250 2250 2250 2250
Wt. of Mould + Wet Soil (gm) 10899 10943 10980 11022 10795 10837
Wt. of Wet Soil (gm) 4669 4713 4680 4722 4676 4718
Wet Density of Soil (gm/cc) 2.075 2.095 2.080 2.099 2.078 2.097
Container No. 33 4 34 5 35 6
Wt. of Cont.+ Wet Soil (gm) 121.09 126.28 124.64 123.43 127.01 125.73
Wt. of Cont.+ Dry Soil (gm) 114.95 118.83 118.39 116.46 120.55 118.50
Wt. of Container (gm) 54.48 56.55 56.99 58.29 57.17 57.98
Wt. of Water (gm) 6.14 7.45 6.25 6.97 6.46 7.23
Wt. of Dry Soil (gm) 60.47 62.28 61.40 58.17 63.38 60.52
Moisture Content % 10.15 11.96 10.18 11.99 10.19 11.95
Avg. Moisture Content % 10.15 11.96 10.18 11.99 10.19 11.95
Dry Density of Soil (gm/cc) 1.884 1.871 1.888 1.874 1.886 1.873
Penetration Test

Mould no. 10 11 12

Dial Accepted Dial Dial


Penetration Corrected Corrected CBR Accepted Corrected CBR Accepted
Gauge Load in kg CBR Value CBR Gauge Load in kg Gauge Load in kg
in mm Load in kg Load in kg Value CBR Value Load in kg Value CBR Value
Reading Value Reading Reading

0 0 0 0.000 0 0.00 0.000 0.00 0 0.00 0.000 0.00


0.50 4 27.17 6 40.75 5 33.96
1.00 9 61.13 11 74.71 10 67.92
1.50 13 88.30 16 108.67 15 101.88
2.00 17 115.46 21 142.63 19 129.05
2.50 21 142.63 142.63 10.41 13.55 25 169.80 169.80 12.39 15.53 23 156.22 156.22 11.40 14.54
4.00 34 230.93 38 258.10 36 244.51
5.00 41 278.47 278.47 13.55 47 319.22 319.22 15.53 44 298.85 298.85 14.54
7.50 55 373.56 61 414.31 58 393.94
10.00 66 448.27 73 495.82 70 475.44
12.50 73 495.82 80 543.36 76 516.19
0.0 0.00

CBR Value = 14.54 %

Contractor Representative GC-HORC/Client Representative


CBR Mould No. 10 CBR CHART 1
800

720

640

560

480

400 CTP1/PAA/QA/SOIL/BA-450
Load in kg

320
BA No-67,Pit NO-1 13.12.2014
240
17.12.2014
160

80 1.89 11
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Corrected Load at 2.5mm = 142.63 Corrected Load at 5.0mm = 278.47


.
CBR Mould No. 11 CBR CHART 2
800.00

720.00

640.00

560.00

480.00
Load in kg

400.00

320.00

240.00

160.00

80.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Corrected Load at 2.5mm = 169.80 Corrected Load at 5.0mm = 319.22

CBR Mould No. 12 CBR CHART 3


800.00
760.00
720.00
680.00
640.00
600.00
560.00
520.00
480.00
440.00
Load in kg

400.00
360.00
320.00
280.00
240.00
200.00
160.00
120.00
80.00
40.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Corrected Load at 2.5mm = 156.22 Corrected Load at 5.0mm = 298.85

Contractor Representative GC-HORC/Client Representative