HARYANA ORBITAL RAIL CORRIDOR (HORC)

PROJECT

Design and Construction of Civil Works (Earthwork, Bridges, Station Buildings, Retaining Walls and other miscellaneous Works) from km 29.68
to km 49.70 & from km 55.60 to km 61.50 and its connectivity's to IR network from New Patli to Patli station & New Patli to Sultanpur station
including modifications/civil works at Sultanpur Station in connection with laying of New BG Double Railway line of HORC project.

CLIENT Haryana Rail Infrastructure Development Corporation Ltd


GENERAL CONSULTANT (GC) RITES Ltd. In consortium with SMEC int. Pvt.Ltd.
EPC - CONTRACTOR M/S PNC Infratech Limited.
DETERMINATION OF CALIFORNIA BEARING RATIO OF SOILS
(IS : 2720 - Part 16)
Type of Material Borrow Area Soil Date of Casting 30.12.2023
Source of Material BA NO. - 9 Date of Testing 03.01.2024
Location/Chainage 35+000 RHS @8.0 km Tested By Jointly
Sample No. Sample No. - 01 Proving Ring Factor (kg/div.) 6.792
Method of Casting Dynamic MDD (gm/cc) 1.877
Surcharge wt. (kg.) 5 OMC (%) 10.43
Density Description:-
Before Soaking After Soaking Before Soaking After Soaking Before Soaking After Soaking
No. of Blows
55 55 55 55 55 55
CBR Mould No. 1 1 2 2 3 3
Weight of Mould(gm) 6260 6260 6157 6157 6198 6198
Volume of Mould (cc) 2250 2250 2250 2250 2250 2250
Wt. of Mould + Wet Soil (gm) 10884 10914 10790 10823 10819 10860
Wt. of Wet Soil (gm) 4624 4654 4633 4666 4621 4662
Wet Density of Soil (gm/cc) 2.055 2.069 2.059 2.074 2.054 2.072
Container No. 1 10 2 11 3 12
Wt. of Cont.+ Wet Soil (gm) 129.03 124.09 119.32 125.57 120.82 125.83
Wt. of Cont.+ Dry Soil (gm) 122.05 116.75 113.25 117.87 114.56 117.92
Wt. of Container (gm) 54.81 56.21 54.97 54.53 54.42 52.64
Wt. of Water (gm) 6.98 7.34 6.07 7.70 6.26 7.91
Wt. of Dry Soil (gm) 67.24 60.54 58.28 63.34 60.14 65.28
Moisture Content % 10.38 12.12 10.42 12.15 10.41 12.11
Avg. Moisture Content % 10.38 12.12 10.42 12.15 10.41 12.11
Dry Density of Soil (gm/cc) 1.862 1.845 1.865 1.849 1.860 1.848
Penetration Test

Mould no. 1 2 3

Dial Accepted Dial Dial


Penetration Corrected Corrected CBR Accepted Corrected CBR Accepted
Gauge Load in kg CBR Value CBR Gauge Load in kg Gauge Load in kg
in mm Load in kg Load in kg Value CBR Value Load in kg Value CBR Value
Reading Value Reading Reading

0 0 0 0.000 0 0.00 0.000 0.00 0 0.00 0.000 0.00


0.50 5 33.96 4 27.17 5 33.96
1.00 11 74.71 9 61.13 10 67.92
1.50 16 108.67 14 95.09 15 101.88
2.00 21 142.63 19 129.05 20 135.84
2.50 26 176.59 176.59 12.89 18.51 24 163.01 163.01 11.90 15.86 25 169.80 169.80 12.39 16.20
4.00 44 298.85 40 271.68 41 278.47
5.00 56 380.35 380.35 18.51 48 326.02 326.02 15.86 49 332.81 332.81 16.20
7.50 75 509.40 63 427.90 64 434.69
10.00 85 577.32 75 509.40 72 489.02
12.50 88 597.70 83 563.74 75 509.40
0.0 0.00

CBR Value = 16.86 %

Contractor Representative GC-HORC/Client Representative


CBR Mould No. 1 CBR CHART 1
800

720

640

560

480

400 CTP1/PAA/QA/SOIL/BA-450
Load in kg

320
BA No-67,Pit NO-1 13.12.2014
240
17.12.2014
160

80 1.89 11
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Corrected Load at 2.5mm = 176.59 Corrected Load at 5.0mm = 380.35


.
CBR Mould No. 2 CBR CHART 2
800.00

720.00

640.00

560.00

480.00
Load in kg

400.00

320.00

240.00

160.00

80.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Corrected Load at 2.5mm = 163.01 Corrected Load at 5.0mm = 326.02

CBR Mould No. 3 CBR CHART 3


800.00
760.00
720.00
680.00
640.00
600.00
560.00
520.00
480.00
440.00
Load in kg

400.00
360.00
320.00
280.00
240.00
200.00
160.00
120.00
80.00
40.00
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Penetration in mm

Corrected Load at 2.5mm = 169.80 Corrected Load at 5.0mm = 332.81

Contractor Representative GC-HORC/Client Representative