4x4 Risk Matrix Evaluation

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

1. It has happened 2. Has occurred at 3. It happened several times 4.

It happened
People Assets Environment Image once in the the operating at the operating company several times at
industry company during the year the site during the
4. One or more fatalities 4. Massive damage 4. Mass effect 4. Major International year.
Impact 4 8 12 16
3. Major injury with 3. Extensive damage 3. Effect outside property 3. Major national impact
hospitalization limits 3 6 9 12
2. Minor injury without 2. Major damage 2. Effect within property 2. Considerable impact
hospitalization limits 2 4 6 8
1. No injury 1. No damage/minor damage 1. No effects/Minor effect
1. No impact/Limited impact 1 2 3 4

TO. IT REQUIRES ESTABLISHING SPECIFIC ADMINISTRATIVE, OPERATIONAL OR DESIGN REQUIREMENTS FOR THE
PREVENTION, PROTECTION, CONTROL AND MITIGATION OF ACCIDENTS/INCIDENTS. REGULATORY ACTIONS WITH A b b TO TO
HIGHER LEVEL OF PRESCRIPTION

b. IT REQUIRES ESTABLISHING GENERAL ADMINISTRATIVE, OPERATIONAL OR DESIGN REQUIREMENTS FOR THE


PREVENTION, PROTECTION, CONTROL AND MITIGATION OF ACCIDENTS/INCIDENTS AT A LEVEL AS LOW AS POSSIBLE c b TO TO
(ALARP). MIXED REGULATORY ACTIONS (PRESCRIPTIVE / GOAL-ORIENTED)

c. IT REQUIRES ESTABLISHING GENERAL ADMINISTRATIVE, OPERATIONAL OR DESIGN REQUIREMENTS FOR THE


PREVENTION, PROTECTION, CONTROL AND MITIGATION OF ACCIDENTS/INCIDENTS AT AN ACCEPTABLE LEVEL OF RISK. c b b b
REGULATORY ACTIONS WITH A HIGHER LEVEL OF ORIENTATION TOWARDS OBJECTIVES

c c c b