Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

STUDENT INTERNSHIP LOG BOOK

NAME: SHU CEDRIC MBOWA


REGISTRATION NUMBER: UBa21E0158 / LEVEL: 300
DEPARTMENT: MECE / OPTION:
ATTACHMENT PERIOD: From 01/08/2023 to 30/09/2023

COMPANY’S NAME: LAHMOTECH VOCATIONAL TRAINING CENTER BAMENDA


ADDRESS: FOOD MARKET BAMENDA
PHONE NUMBER: 678278534 / E-MAIL:
DEPARTMENT/DIVISION: MANUFACTURING

DAILY/WEEKLY ATTACHMENT
RECORDS
WEEK 1 AND 2

Day / Date Day’s Activities


- During this week, we did fabrication of different machines and maintenance of a lathe
machine. We did maintenance on the chuck of a lathe machine that was bad so the chuck
was removed and the jaw keys adjusted.
WEEK5
-a spining moulding machine

- continuation of fabrication
- a peeling and grinding machine
- circular wood sawing machine
WEEK6

INTERNS REMARK

This week was quit a great one because I was able to use some fabrication tools like the welding machine
Which I really learned a lot from this activities

1
Further helpful Information like Drawings, Diagrams, Sketches, Calculations, Notes, etc. can be done on extra A4 sheets
and attached to this record sheet.

Intern’s Signature:

Field Supervisor’s Signature:


Name:
Company’s Stamp:
Date:

You might also like