CLIENT: STATISTICS
UNDER
1
DGSSCBWOHDZZZZXXWICI00001 Trial Mix for Blinding Concrete (Grade 20/20 MSRC Blinding)
Civil WIR 001 25Nov23
REVIEW
Rev 0 157 OVERDUE
UNDER
2
DGSSCBWOHDZZZZXXWICI00002 Trial Mix for SUB STRUCTURE Concrete (Grade 40/20 MSRC & 70%GGBS)
Civil WIR 002 25Nov23
REVIEW
Rev 0 157 OVERDUE
UNDER
3
DGSSCBWOHDZZZZXXWICI00003 Trial Mix for Swimming Pool (Grade 40/20 MSRC & 70%GGBS with waterproofer)
Civil WIR 003 25Nov23
REVIEW
Rev 0 157 OVERDUE
UNDER
4
DGSSCBWOHDZZZZXXWICI00004 Trial Mix for Superstructure (Grade 40/20 OPC & 50% GGBS)
Civil WIR 004 27Nov23
REVIEW
Rev 0 155 OVERDUE
UNDER
5
DGSSCBWOHDZZZZXXWICI00005 Trial Mix for Screed (20/10 OPC)
Civil WIR 005 27Nov23
REVIEW
Rev 0 155 OVERDUE
UNDER
6
DGSSCBWOHDZZZZXXWICI00006 Trial Mix for Protection Screed (Grade 40/10 OPC)
Civil WIR 006 27Nov23
REVIEW
Rev 0 155 OVERDUE
UNDER
7
DGSSCBWOHDZZZZXXWICI00007 Trial Mix for 1:4 Sand Cement Screed OPC
Civil WIR 007 27Nov23
REVIEW
Rev 0 155 OVERDUE
UNDER
29
DGSSCBWOHDZZZZZZWICI00029 WIR For Soil compaction Test of Soil improvement Area 1(2nd Layer) as per attached topographic Grid DM+10.32/15+20.77 Code 1
Civil WIR 029 3Jan24
REVIEW
Rev 0 118 OVERDUE
UNDER
30
DGSSCBWOHDZZZZZZWICI00030 WIR For Soil compaction Test of Soil improvement Area 2(2nd Layer) as per attached topographic Grid BM+10.32/1215+20.77 Code 1
Civil WIR 030 3Jan24
REVIEW
Rev 0 118 OVERDUE
UNDER
31
DGSSCBWOHDZZZZZZWICI00031 WIR For Soil compaction Test of Soil improvement Area 3(2nd Layer) as per attached topographic Grid A+10.32mM+10.32m/915+20.77m Code 1
Civil WIR 031 3Jan24
REVIEW
Rev 0 118 OVERDUE
UNDER
43
DGSSCBWOHDZZZZZZWISU00043 Joint Survey for Establishing Control Points at project details Code 1
Survey WIR 043 27Nov23
REVIEW
Rev 0 155 OVERDUE
UNDER
60
DGSSCBWOHDZZZZZZWICI00060 To Start Water Proofing Weber Dry (RBV) Materials 2nd Coat Zone 1 Grid HM/610
Civil WIR 060 22Jan24
REVIEW
Rev 0 99 OVERDUE
UNDER
61
DGSSCBWOHDZZZZZZWICI00061 To start Work For Screed Zone 1 Grid HM/610
Civil WIR 061 22Jan24
REVIEW
Rev 0 99 OVERDUE
UNDER
62
DGSSCBWOHDZZZZZZWICI00062 Inspection Request for Site Hoarding Installation and Maintenance for Suburb Sports Club Site at Ghayati in Al Dhafra as per attached Photos. Reference BOQ(Code A.41)
Civil WIR 062 29Jan24
REVIEW
Rev 0 92 OVERDUE
UNDER
63
DGSSCBWOHDZZZZZZWICI00063 Inspection Request of Installation Project Sign Boards For Suburb Sports Club at Ghayati as per attached Drawing and Photo, Reference BOQ(Code A.52)
Civil WIR 063 29Jan24
REVIEW
Rev 0 92 OVERDUE
UNDER
64
DGSSCBWOHDZZZZZZWICI00064 Inspection Request for Established new Control Points of Suburb sports club Site at Ghayathi in Al Dhafra as per attached Report
Civil WIR 064 29Jan24
REVIEW
Rev 0 92 OVERDUE
UNDER
65
DGSSCBWOHDZZZZZZWICI00065 Inspection Request for Site Levels(Architecture & Structure ) 0.00(68.8)
Civil WIR 065 30Jan24
REVIEW
Rev 0 91 OVERDUE
UNDER
66
DGSSCBWOHDZZZZZZWICI00066 Inspection Request to start Excavation Works Zone 1,2,3,4,5 and Soil Improvement Area
Civil WIR 066 30Jan24
REVIEW
Rev 0 91 OVERDUE
UNDER
164 DGSSCBWOHDZZZZZZWICI00164 Inspection Request for surface preparation prior to start waterproofing of Tie beam Zone 1 Grid DM/512 and Zone 2 Grid DM/1215 as per highlighted drawing Civil WIR 206 15Apr24
REVIEW
Rev 0 15 OVERDUE
UNDER
165 DGSSCBWOHDZZZZZZWICI00165 Inspection Request for 1st coat Water Proofing of Tie beam Zone 1 Grid DM/512 and Zone 2 Grid DM/1215 as per highlighted drawing Civil WIR 207 15Apr24
REVIEW
Rev 0 15 OVERDUE
UNDER
166 DGSSCBWOHDZZZZZZWICI00166 Inspection Request for 2nd coat Water Proofing of Tie beam Zone 1 Grid DM/512 and Zone 2 Grid DM/1215 as per highlighted drawing Civil WIR 208 15Apr24
REVIEW
Rev 0 15 OVERDUE
UNDER
167 DGSSCBWOHDZZZZZZWICI00167 Inspection Request of Steel Reinforcement of Columns from Ground floor to + 5.20 Zone 3 Grid AM, LM/12' as per highlighted drawing Civil WIR 209 15Apr24
REVIEW
Rev 0 15 OVERDUE
UNDER
168 DGSSCBWOHDZZZZZZWICI00168 Inspection Request of setting out and formwork of Columns from Ground floor to + 5.20 Zone 3 Grid AM, LM/12' as per highlighted drawing Civil WIR 210 15Apr24
REVIEW
Rev 0 15 OVERDUE
UNDER
169 DGSSCBWOHDZZZZZZWICI00169 Inspection Request for Antitermite Application below SOG of zone 3 Grid DG/23 as per highlighted drawing Civil WIR 211 15Apr24
REVIEW
Rev 0 15 OVERDUE
UNDER
170 DGSSCBWOHDZZZZZZWICI00171 Inspection Request for Antitermite Application below SOG of zone 1 Grid JM/712 and Zone 3 Grid BG/12 as per highlighted drawing Civil WIR 212 17Apr24
REVIEW
Rev 0 13 OVERDUE
UNDER
171 DGSSCBWOHDZZZZZZWICI00172 Inspection Request of authorization to Pour for casting Columns from Ground floor to + 5.20 Zone 3 Grid AM, LM/12' as per highlighted drawing Civil WIR 213 17Apr24
REVIEW
Rev 0 13 OVERDUE