TENDER FORMS
FORM ‘A’
Organisation Chart
(Use separate sheet if required)
Page 1 of 11
Annexure-A1
TENDER FORMS
FORM ‘B’
We agree that the staff mentioned herein before will be deputed full time on the Project.
Page 2 of 11
Annexure-A1
TENDER FORMS
Page 3 of 11
Annexure-A1
TENDER FORMS
FORM ‘D’
Page 4 of 11
Annexure-A1
TENDER FORMS
Page 5 of 11
Annexure-A1
TENDER FORMS
Details of measuring and testing instruments available with bidder for use on this
work
Testing Equipment
Sr. No. Equipment Name Numbers
Note: Bidder to confirm that calibration certificate is available against certified equipment
having a known valid relation ship to internationally or nationally recognised standard.
FORM ‘F’
Pre-bid queries
Page 6 of 11
Annexure-A1
TENDER FORMS
Note: Bidder to give proper reference of tender document i.e. Volume/ Section/ clause no
before submitting this Forms.
FORM ‘G’
Page 7 of 11
Annexure-A1
TENDER FORMS
Page 8 of 11
Annexure-A1
TENDER FORMS
Note:
1) Bidder to give proper reference of tender document i.e. Volume/ Section/ clause no
before submitting this Forms.
2) Bidder shall give valid reason for deviation.
Page 9 of 11
Annexure-A1
TENDER FORMS
FORM ‘H’
Note:
1) Bidder Shall prepare Bar Chart Schedule for each facility-wise such as buildings
(separately for each buildings), pipe rack, general civil works, etc. and work-wise
such as excavation, foundations, columns, floor beam, slab, wall, plaster and
finishing items for each facilities in separate sheet.
2) Bar chart schedule shall indicate No. of weeks required for each activities.
Page 10 of 11
Annexure-A1
TENDER FORMS
FORM ‘I’
LABOUR
1 MASON 1550 Per Day
2 CARPENTERS FOR SHUTTERING 1550 Per Day
3 FITTER 1850 Per Day
4 WELDER 1650 Per Day
5 ELECTRICIAN 1550 Per Day
6 TURNER 1550 Per Day
7 UNSKILLED LABOUR 850 Per Day
8 PLUMBER 1850 Per Day
9 PAINTER 1650 Per Day
10 MACHINE OPERATOR 1650
Note : Detail Field quality assurance plan will be submitted during execution.