EAST EXPANSION SP2-3

Documents/Materials Submittal (DMS)

DMS No : 51

To: Royal Haskoning DHV

Attention: Sander Odjik

Part A Part C
Section Concerned:
Part B Part D

Description: ( Flushing System - Mechanical)


Walkway shopdrawing ( Framing plan, Dinmentions plan, Stair Details and grating plan for both sides
downstream and upstream)

Item : Submitted for : Action taken:

Shop Drawings Approval Approved


Topography Drawings Approved As Noted
x Samples/Materials Revise & Resubmitt
Method Statement Rejected
Documents

Submitted By: Signature: Date: Time:


Eng. Ibrahim Abu Ragheb 14-Apr-24
Received By: Signature: Date: Time:

Remarks:

Engineer Representative: Signature: Date Time:


NOTES :

GRATING
GRATING
EXISTING
BEAM-U 100 FRAM 1- All Dimensions are in (mm) unless otherwise
ANGLE-100*10 L 30*30*3
indicated.
SLIDE GATE
2-All Levels are in (mm) unless otherwise
GRATING 4cm thickness

FRAM indicated.
1652
L 30*30*3
BEAM-U 100
CANTILEVER

EXISTING
BEAM-U 100

GABION - SECOND ROW

GABION- FIRST ROW


GRATING 4cm thickness

ANGLE-100*10

-392160 mm
-393660 mm
GRATING
FRAM

CANTILEVER
EXISTING L 30*30*3
ANGLE-100*10
BEAM-U 100
SLIDE GATE Workshop Drawing
GRATING 4cm thickness
SLIDE GATE
1652

CANTILEVER
1- ZTC : Zakaria Al-Tarawneh Contracting Co.
BEAM-U 100 2- EX: East Expansion Project Part D
GABION - SECOND ROW
3- No.: Drawing No.

GABION- FIRST ROW


GRATING
FRAM
L 30*30*3

-392160 mm
-393660 mm

LEGEND :
EXISTING
ANGLE-100*10 GRATING 4cm thickness
BEAM-U 100
SLIDE GATE

1652

BEAM-U 100
GRATING 4cm thickness

CANTILEVER
1652 GRATING 4cm thickness
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness


-392160 mm
-393660 mm

GRATING
FRAM
EXISTING L 30*30*3
BEAM-U 100 4
ANGLE-100*10

SLIDE GATE
3
2
1
GRATING 4cm thickness
1652 REV NAME DATE DESCRIPTION
CLIENT:
CANTILEVER
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness


-392160 mm
-393660 mm

EXISTING
ANGLE-100*10 CANTILEVER
1237 950
SLIDE GATE

GRATING 4cm thickness


MANHOLE
GRATING
4cm
GRATING
FRAM
L-30*30*3
GRATING 4cm thickness
GRATING
1652 FRAM
L 30*30*3

GRATING
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness

GRATING EXISTING
FRAM
-392160 mm

East Expansion Project Part D


-393660 mm

FRAM
L 30*30*3
ANGLE-100*100*10 PROJECT NAME:

L 30*30*3
EXISTING
ANGLE-100*10 BEAM-U 100 CONSULTANT:
SLIDE GATE
STEEL PIPE 1000
EXISTING
GRATING 4cm thickness
1652

CANTILEVER

ANGLE-100*10 BEAM-U 100


GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness MAIN CONTRACTOR:


Invert Level -395.08
-392160 mm
-393660 mm

GRATING
FRAM

SLIDE GATE
L 30*30*3
EXISTING
BEAM-U 100
ANGLE-100*10
CANTILEVER
SLIDE GATE
ZAKARIA SALEH AL-TARAWNEH COMPANY

1652 GRATING 4cm thickness


8.5 SUB CONTRACTOR:
GABION - SECOND ROW

6
GABION- FIRST ROW

GRATING 4cm thickness

30 CANTILEVER
100
-392160 mm

GRATING
-393660 mm

FRAM
L 30*30*3

B
EXISTING

3
ANGLE-100*10 BEAM-U 100

SLIDE GATE

CANTILEVER
1652 Seven Mountains Construction
E-Mail : smcjordan@smcjordan.com
50
B

1652

BEAM-U 100
30
GABION - SECOND ROW

GRATING 4cm thickness


GABION- FIRST ROW
-392160 mm
-393660 mm

BEAM-U 100
GRATING
FRAM
L 30*30*3
BEAM-U 100
SLIDE GATE
CANTILEVER

GRATING 4cm thickness


1652

BEAM-U 100
BEAM-H 200
COLUMN-U 200
BEAM-U 200
BEAM-U 200 BP 300*150*14
F5- 350*200*200
100 GRATING 4cm thickness DRAWING NAME:

DOWNSTREAM -
A
A

UP

EXISTING BP 300*150*14
10 WALKWAY
BEAM-U 100
ANGLE-100*10

SLIDE GATE
COLUMN-U 200
BEAM-U 200
F5- 350*200*200 FRAMING PLAN
BEAM-H 200

100
CANTILEVER GRATING 4cm thickness

1652

BEAM-U 100 GRATING


FRAM
L 30*30*3

GRATING FRAM
L 30*30*3

DOWNSTREAM - WALKWAY FRAMING PLAN


SEC B-B DOWNSTREAM - TYPICAL WALKWAY FRAMING PLAN
DRAWN: A.BARHOUM

DESIGNED: SMC
CHECKED:

APPROVED:

1 1:120
1:25 2 1:25
DRAWING NO.: S-700

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


1000 NOTES :

SLIDE GATE 75
950
75
GRATING 4cm thickness
1000 1- All Dimensions are in (mm) unless otherwise
indicated.
2-All Levels are in (mm) unless otherwise
GRATING indicated.

950
FRAM L30*3
1652 1402.0
950.0
CANTILEVER

75
75 BEAM-U 100

GABION - SECOND ROW

GABION- FIRST ROW


GRATING 4cm thickness

-392160 mm
1368.0

-393660 mm
GRATING

75
FRAM
EXISTING
ANGLE-100*10
BEAM-U 100
L 30*30*3
SLIDE GATE
SLIDE GATE 75
950.0
GRATING 4cm thickness
GRATING 4cm thickness Workshop Drawing
1652 1402.0

1000
75 BEAM-U 100
CANTILEVER
1- ZTC : Zakaria Al-Tarawneh Contracting Co.
2- EX: East Expansion Project Part D
GABION - SECOND ROW

GABION- FIRST ROW


950.0 GRATING 3- No.: Drawing No.
FRAM

1368.0
L 30*30*3

-392160 mm
GRATING
-393660 mm

EXISTING LEGEND :
FRAM L30*3
ANGLE-100*10 GRATING 4cm thickness

1652 1402.0
BEAM-U 100
SLIDE GATE
950.0
GRATING 4cm thickness
1652 1402.0

1000
BEAM-U 100
CANTILEVER
950.0
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness


-392160 mm

CANTILEVER
-393660 mm

1368.0
GRATING
FRAM

75
EXISTING L 30*30*3
ANGLE-100*10 BEAM-U 100

SLIDE GATE

1000
BEAM-U 100 4
3
2
GRATING 4cm thickness

GABION - SECOND ROW


1652 1402.0 1
REV NAME DATE DESCRIPTION

GABION- FIRST ROW


CANTILEVER CLIENT:

GRATING 4cm thickness


GABION - SECOND ROW

GABION- FIRST ROW

950.0
GRATING 4cm thickness
-392160 mm

1368.0
-393660 mm

EXISTING
ANGLE-100*10 CANTILEVER

SLIDE GATE

1000
GRATING 4cm thickness

-392160 mm
GRATING
1652 1402.0 FRAM
L 30*30*3

1368.0

-393660 mm
950.0

GRATING
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness

GRATING

FRAM
-392160 mm

1368.0
-393660 mm

FRAM
L 30*30*3
PROJECT NAME: East Expansion Project Part D
EXISTING

L 30*30*3
ANGLE-100*10 BEAM-U 100

SLIDE GATE

1000
EXISTING CONSULTANT:

ANGLE-100*10
GRATING 4cm thickness
1652 1402.0

950.0
CANTILEVER BEAM-U 100
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness

75
MAIN CONTRACTOR:

SLIDE GATE
-392160 mm

1368.0
-393660 mm

GRATING
FRAM
L 30*30*3

950.0
EXISTING
BEAM-U 100
ANGLE-100*10
CANTILEVER
SLIDE GATE

1000 ZAKARIA SALEH AL-TARAWNEH COMPANY


1652 1402.0 GRATING 4cm thickness
SUB CONTRACTOR:

950.0
GRATING 4cm thickness
GABION - SECOND ROW

GABION- FIRST ROW

GRATING 4cm thickness


-392160 mm
-393660 mm

1652 1402.0
1368.0 GRATING
FRAM
EXISTING L 30*30*3
ANGLE-100*10 BEAM-U 100

SLIDE GATE
950.0 CANTILEVER Seven Mountains Construction
E-Mail : smcjordan@smcjordan.com
B

1652 1402.0
1000
BEAM-U 100
1000
GABION - SECOND ROW

GRATING 4cm thickness

CANTILEVER
GABION- FIRST ROW
-392160 mm

BEAM-U 100
-393660 mm

1368.0

EXISTING
ANGLE-100*10

SLIDE GATE
BEAM-U 100
GRATING
FRAM
L 30*30*3
75

GABION - SECOND ROW


CANTILEVER
950.0

GABION- FIRST ROW


1652 1402.0
BEAM-U 200
BEAM-H 200
1000 BEAM-U 200
COLUMN-U 200 486 250
BP 300*150*14
DRAWING NAME:
1179 891 350 F5- 350*200*200
1264 54 200
GRATING
54
900
950.0 DOWNSTREAM -
A
A

UP
EXISTING
ANGLE-100*10
1368.0

75
350
775 975
FRAM WALKWAY
200
SLIDE GATE
1264
COLUMN-U 200
484
BEAM-U 200
999
BP 300*150*14
L 30*30*3 DIMENSIONS PLAN

-392160 mm
BEAM-U 100 BEAM-H 200 F5- 350*200*200

1368.0
1000 CANTILEVER

-393660 mm
1652 1402.0
GRATING
FRAM
L 30*30*3
75

950
1000

EXISTING
DRAWN: A.BARHOUM CHECKED:
DOWNSTREAM - WALKWAY DIMENSIONS PLAN DOWNSTREAM - TYPICAL WALKWAY DIMENSIONS PLAN
2
DESIGNED: SMC APPROVED:

1 1:120 1:25
DRAWING NO.: S-701

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


950.0 NOTES :

1- All Dimensions are in (mm) unless otherwise

GABION - SECOND ROW


indicated.

GABION- FIRST ROW


2-All Levels are in (mm) unless otherwise
indicated.

GRATING 4cm thickness

-392160 mm
-393660 mm
1368.0 GRATING
FRAM
EXISTING L 30*30*3 Workshop Drawing
ANGLE-100*10 BEAM-U 100
1- ZTC : Zakaria Al-Tarawneh Contracting Co.
SLIDE GATE 2- EX: East Expansion Project Part D
3- No.: Drawing No.
950.0 CANTILEVER
LEGEND :

B 999 2590
B

1652 1402.0
1000 1.5" PIPE
L60 X 60 X 6

BEAM-U 100
306 212 1.5" PIPE

GABION - SECOND ROW


4

GRATING 4cm thickness 3

GABION- FIRST ROW


2

1057
1

306 REV NAME


CLIENT:
DATE DESCRIPTION

L60 X 60 X 6

230

-392160 mm
-393660 mm
1368.0
1100
BEAM-U 100
EXISTING BP 300*150*14

ANGLE-100*10
GRATING ELEV = -392160 30° 74
FRAM
L 30*30*3 200 250 891 54
SLIDE GATE
CANTILEVER 350 160
U-200
950.0 F5- 350*200*200
GRATING
PROJECT NAME: East Expansion Project Part D

1368 300 FRAM CONSULTANT:


L 30*30*3

1652 1402.0 Gaboin Box


736 620
BEAM-U 200
50 950
BEAM-H 200 30° GRATING
4cm MAIN CONTRACTOR:

1000 BEAM-U 200 MANHOLE


H-200
COLUMN-U 200 486 250
BP 300*150*14
1179 891 350 F5- 350*200*200 50
1264 54 1179 44
200 1264 EXISTING
ZAKARIA SALEH AL-TARAWNEH COMPANY

54 ANGLE-100*10 SUB CONTRACTOR:

900
A
A

1264 19 1000
1368.0 UP 775 975
350 STEEL PIPE Seven Mountains Construction
EXISTING
ANGLE-100*10 75 E-Mail : smcjordan@smcjordan.com

1264 999 200


SLIDE GATE
COLUMN-U 200
484 BP 300*150*14
BEAM-U 200
BEAM-H 200 F5- 350*200*200
BEAM-U 100 8.5 8.5 200
1000 CANTILEVER 15
75
9 200 100
1652 1402.0 6 10
GRATING 100 11.5
FRAM
200 100 DRAWING NAME:

L 30*30*3 DOWNSTREAM -
75 300 STAIR DETAILS
50 30
950 3 23 M16
150
1000 30

DOWNSTREAM - STAIR DETAILS DIMENSIONS PLAN SEC A-A DRAWN: A.BARHOUM CHECKED:

1
DESIGNED: SMC APPROVED:

1:40 1:40 DRAWING NO.: S-702

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


NOTES :

1- All Dimensions are in (mm) unless otherwise


indicated.
2-All Levels are in (mm) unless otherwise
indicated.

Workshop Drawing

1- ZTC : Zakaria Al-Tarawneh Contracting Co.


2- EX: East Expansion Project Part D
3- No.: Drawing No.

LEGEND :

BEAM-H 200 MANHOLE 350 4


3
2

F5- 350*200*200 1

GABION - SECOND ROW


REV NAME DATE DESCRIPTION

486 CLIENT:

GABION- FIRST ROW


COLUMN-U 200 200

-392160 mm
-393660 mm BP 300*150*14
1870 900 350 775 975
PROJECT NAME: East Expansion Project Part D

CONSULTANT:

COLUMN-U 200 200 MAIN CONTRACTOR:

484
BEAM-H 200 F5- 350*200*200 ZAKARIA SALEH AL-TARAWNEH COMPANY

MANHOLE BP 300*150*14 SUB CONTRACTOR:

Seven Mountains Construction


E-Mail : smcjordan@smcjordan.com

DRAWING NAME:

DOWNSTREAM -
STAIR DETAILS

DOWNSTREAM - STAIR SUPPORTS - TOP VIEW


1 1:40

DRAWN: A.BARHOUM CHECKED:

DESIGNED: SMC APPROVED:

DRAWING NO.: S-703

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


EXISTING
1870 1670 NOTES :
ANGLE-100*10
U 100 U 100
1- All Dimensions are in (mm) unless otherwise
720
EXISTING indicated.
2-All Levels are in (mm) unless otherwise
indicated.
1000 1652
ANGLE-100*10
U 100
720
U 100
U 100 U 100
1870 1670
EXISTING

U 100 U 100

720
ANGLE-100*10

720 Workshop Drawing


1000 1652

720
1- ZTC : Zakaria Al-Tarawneh Contracting Co.
U 100
U 100
2- EX: East Expansion Project Part D
3- No.: Drawing No.
1870 1670
EXISTING
ANGLE-100*10
U 100 U 100 LEGEND :
720

1000 1652
1000 1652
U 100
720
U 100
U 100
1870 1670
EXISTING
ANGLE-100*10
U 100 U 100
4
720
3

GABION - SECOND ROW


720
2

GABION - FIRST ROW


1000 1652 1
REV NAME DATE DESCRIPTION
CLIENT:
720
U 100
U 100

1870 1670
EXISTING
ANGLE-100*10
U 100
U 100 U 100

-392060 mm
720

-393560 mm
1000 1652

U 100
720
U 100
1870 1670
1870 1670

U 100 U 100
EXISTING
ANGLE-100*10 EXISTING PROJECT NAME: East Expansion Project Part D

720
ANGLE-100*10
CONSULTANT:

1000 1652
U 100
U 100
720
U 100 720 MAIN CONTRACTOR:
1870 1670
EXISTING
ANGLE-100*10
U 100 U 100

720

ZAKARIA SALEH AL-TARAWNEH COMPANY


1000 1652

U 100 SUB CONTRACTOR:

720
U 100
U 100

1870 1670

U 100 U 100

720
EXISTING
ANGLE-100*10
1000 1652
Seven Mountains Construction

1000 1652 E-Mail : smcjordan@smcjordan.com

720
U 100
U 100

1870 1670
EXISTING
ANGLE-100*10
U 100 U 100

720
720
U 100
1000 1652 U 100
U 100
GABION - SECOND ROW

720
GABION - FIRST ROW

DRAWING NAME:
U 100

UPSTREAM -
-392060 mm

-393560 mm

1870 1670

U 100
EXISTING
ANGLE-100*10 WALKWAY
720
SUPPORTS
U 100

1000 1652

720
U 100
U 100

DRAWN: A.BARHOUM CHECKED:

UPSTREAM - WALKWAY SUPPORTS UPSTREAM - TYPICAL WALKWAY SUPPORTS DESIGNED: SMC APPROVED:

1 1:120
2 1:25
DRAWING NO.: S-800

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


GABION - SECOND ROW
GABION - FIRST ROW
NOTES :
U 100

896
EXISTING
ANGLE-100*10
U 100 1- All Dimensions are in (mm) unless otherwise
indicated.
2-All Levels are in (mm) unless otherwise
1000 1652
indicated.
176

-392060 mm

-393560 mm
GABION - SECOND ROW
896

GABION - FIRST ROW


U 100

-392060 mm

-393560 mm
EXISTING
ANGLE-100*10
U 100
896
EXISTING Workshop Drawing
1000 1652
U 100 ANGLE-100*10
176

896 U 100 1- ZTC : Zakaria Al-Tarawneh Contracting Co.


GABION - SECOND ROW

2- EX: East Expansion Project Part D


GABION - FIRST ROW

U 100
3- No.: Drawing No.

896
-392060 mm

-393560 mm

EXISTING
ANGLE-100*10
U 100 LEGEND :
896

1000 1652
176

896
GABION - SECOND ROW
GABION - FIRST ROW

U 100
-392060 mm

-393560 mm

EXISTING
ANGLE-100*10

1000 1652
U 100
896 4
3
2
1000 1652 U 100
176
1
176 REV NAME DATE DESCRIPTION
CLIENT:
896
GABION - SECOND ROW
GABION - FIRST ROW

U 100
-392060 mm

-393560 mm

EXISTING
ANGLE-100*10
U 100
896

896

GABION - SECOND ROW


1000 1652

GABION - FIRST ROW


176

896
GABION - SECOND ROW
GABION - FIRST ROW

U 100

U 100
-392060 mm

-393560 mm

EXISTING
ANGLE-100*10
PROJECT NAME: East Expansion Project Part D
U 100
896 CONSULTANT:

-392060 mm

-393560 mm
1000 1652
176
GABION - SECOND ROW

896
GABION - FIRST ROW

U 100
MAIN CONTRACTOR:
-392060 mm

-393560 mm

EXISTING
ANGLE-100*10
EXISTING
U 100
896 U 100 ANGLE-100*10
ZAKARIA SALEH AL-TARAWNEH COMPANY
1000 1652
176
U 100 SUB CONTRACTOR:

896

896
GABION - SECOND ROW
GABION - FIRST ROW

U 100
-392060 mm

-393560 mm

EXISTING
ANGLE-100*10
U 100
896
Seven Mountains Construction

1000 1652 E-Mail : smcjordan@smcjordan.com


176

896
GABION - SECOND ROW
GABION - FIRST ROW

U 100

1652
-392060 mm

1000
-393560 mm

EXISTING
U 100 ANGLE-100*10
U 100
896
U 100
U 100
1000
176
1652 176
896 DRAWING NAME:
GABION - SECOND ROW
GABION - FIRST ROW

U 100

UPSTREAM -
-392060 mm

-393560 mm

U 100
U 100
EXISTING
ANGLE-100*10 WALKWAY
896
FRAMING
1000 1652
PLAN
U 100
176

U 100
U 100

DRAWN: A.BARHOUM CHECKED:

UPSTREAM - WALKWAY FRAMING PLAN UPSTREAM - TYPICAL WALKWAY FRAMING PLAN DESIGNED: SMC APPROVED:

1 1:120
2 1:25
DRAWING NO.: S-801

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


U 100
GRATING EXISTING
GRATING NOTES :
FRAM
L 30*30*3
89.6
ANGLE-100*10

FRAM 1- All Dimensions are in (mm) unless otherwise


indicated.
2-All Levels are in (mm) unless otherwise
L 30*30*3 indicated.
1000 1652
1870
GRATING 4cm thickness
U 100
GRATING
FRAM
EXISTING
896
1870 L 30*30*3

EXISTING
896
U 100
ANGLE-100*10
ANGLE-100*10
Workshop Drawing
1000 1652
U 100

S-803

S-803
1- ZTC : Zakaria Al-Tarawneh Contracting Co.
2- EX: East Expansion Project Part D
GRATING 4cm thickness
U 100 3- No.: Drawing No.
GRATING

C
FRAM
1870 L 30*30*3

EXISTING
896 ANGLE-100*10 LEGEND :
U 100

1000 1652

GRATING 4cm thickness

1652
U 100

1000
GRATING
FRAM
1870 L 30*30*3

EXISTING
896 ANGLE-100*10
U 100 4
3
2
1
1000 1652
REV NAME DATE DESCRIPTION
CLIENT:

GRATING 4cm thickness U 100


GRATING
896 FRAM
1870 L 30*30*3

EXISTING
ANGLE-100*10
U 100

GRATING 4cm thickness


1000 1652

U 100
GRATING 4cm thickness
U 100
GRATING
GRATING
FRAM
FRAM
L 30*30*3
1870
EXISTING
PROJECT NAME: East Expansion Project Part D
896 ANGLE-100*10
U 100
L 30*30*3 CONSULTANT:

1000 1652
1870
EXISTING
GRATING 4cm thickness

1870
U 100
GRATING
FRAM
L 30*30*3
896 ANGLE-100*10
MAIN CONTRACTOR:

EXISTING
896

U 100
ANGLE-100*10
U 100
S-803

S-803
C

ZAKARIA SALEH AL-TARAWNEH COMPANY

1000 1652
SUB CONTRACTOR:

GRATING 4cm thickness


U 100
GRATING
FRAM
L 30*30*3
1870
EXISTING
896 ANGLE-100*10
U 100

Seven Mountains Construction


E-Mail : smcjordan@smcjordan.com
1000 1652

GRATING 4cm thickness


U 100
GRATING
FRAM
1000 1652
L 30*30*3
1870
EXISTING
896 ANGLE-100*10
U 100

1000 1652

DRAWING NAME:

GRATING 4cm thickness


U 100
GRATING
FRAM
L 30*30*3
UPSTREAM -
1870
EXISTING
ANGLE-100*10
WALKWAY
U 100
GRATING 4cm thickness GRATING
U 100 PLAN
1000 1652
GRATING
896
GRATING
FRAM
FRAM
L 30*30*3

L 30*30*3
1870 DRAWN: A.BARHOUM CHECKED:

UPSTREAM - WALKWAY GRATING PLAN UPSTREAM - TYPICAL WALKWAY GRATING PLAN DESIGNED: SMC APPROVED:

1 1:120
2 1:25
DRAWING NO.: S-802

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


NOTES :

1- All Dimensions are in (mm) unless otherwise


indicated.
2-All Levels are in (mm) unless otherwise
indicated.

Workshop Drawing

1- ZTC : Zakaria Al-Tarawneh Contracting Co.


2- EX: East Expansion Project Part D
3- No.: Drawing No.

LEGEND :

4
3
2
1
REV NAME DATE DESCRIPTION
CLIENT:

GRATING 4cm

142
896 780
U-100
100
620 30 MANHOLE PROJECT NAME: East Expansion Project Part D

CONSULTANT:

176 720
1500

STEEL PIPE MAIN CONTRACTOR:

ZAKARIA SALEH AL-TARAWNEH COMPANY

SUB CONTRACTOR:

8.5
Seven Mountains Construction

6 30 E-Mail : smcjordan@smcjordan.com

100 3

50 30

DRAWING NAME:

UPSTREAM -
WALKWAY
GRATING
PLAN
SEC C-C UPSTREAM - WALKWAY
S-802
DRAWN: A.BARHOUM CHECKED:

DESIGNED: SMC APPROVED:

DRAWING NO.: S-803

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


NOTES :

1- All Dimensions are in (mm) unless otherwise


indicated.
2-All Levels are in (mm) unless otherwise
indicated.

ANGLE-100*10
U 100 Workshop Drawing

1- ZTC : Zakaria Al-Tarawneh Contracting Co.


2- EX: East Expansion Project Part D
3- No.: Drawing No.
GRATING
FRAM
L 30*30*3 F 1000
LEGEND :

S-805
1544
F4- 200*200*210 INCLINED COLUMN-H 100
F4- 200*200*210
579 EXISTING
1544
825 700 850 850 4

200 200 PLATE 3


2
WELDED ON 1

SLIDE GATE REV NAME DATE DESCRIPTION

200 200 3 3 CLIENT:

779 755
F3- 1000*200*210 724 EXISTING
PLATE
3 3 WELDED ON
200 100 SLIDE GATE
1000 U-200 U-200
INCLINED COLUMN-H 100
GABION - SECOND ROW
GABION - FIRST ROW

2715.9 PROJECT NAME: East Expansion Project Part D

CONSULTANT:
-392060 mm

-393560 mm

820
2715.9 970
MAIN CONTRACTOR:

350 A B
F1
250 U-200

A B 115 ZAKARIA SALEH AL-TARAWNEH COMPANY


350 M16 2 2 SUB CONTRACTOR:
F1- 350*250*200
M16 BP 340*340*14
250 150 U-200
COLUMN-H 200
2 400 2 975.0 350 1050 U-200

F1 545 COLUMN-H 200


BP 300*200*14 400 F2- 400*400*400 U-200 Seven Mountains Construction
E-Mail : smcjordan@smcjordan.com
975.0 350 M16 COLUMN-H 200 1 1
F1- 350*250*200 980
BP 340*340*14
250 350
150 1825.0
200 A B
1 1
250 F2- 400*400*400
M16
A
1825.0 200
B
F
COLUMN-H 200
S-805 DRAWING NAME:

UPSTREAM -
STAIR DETAILS
UPSTREAM - STAIR SUPPORTS - TOP VIEW UPSTREAM - STAIR DETAILS DIMENSIONS PLAN
1 1:40 2 1:40

DRAWN: A.BARHOUM CHECKED:

DESIGNED: SMC APPROVED:

DRAWING NO.: S-804

DATE: 12/04/2024 MAIN SCALE: AS SHOWN


NOTES :

1- All Dimensions are in (mm) unless otherwise


indicated.
2-All Levels are in (mm) unless otherwise
indicated.

Workshop Drawing

1- ZTC : Zakaria Al-Tarawneh Contracting Co.


2- EX: East Expansion Project Part D
3- No.: Drawing No.

LEGEND :

1 2 3 A B
975.0 1319 957 839 4

814 3
2
1
REV NAME DATE DESCRIPTION

306
CLIENT:

1.5" PIPE

1057 306 1825.0


1038 406
U-200

350 1600 U-200


L60 X 60 X 6 U-200
1130
U-200 100 BP 300*200*14
ELEV =-392060 mm U-200 U-200 300 200
U-200 PROJECT NAME: East Expansion Project Part D
COLUMN-H 200 CONSULTANT:

1205 350 F1- 350*250*200


1205 M16
1029
BP 340*340*14
U-200
BP 340*340*14 MAIN CONTRACTOR:
F4- 200*200*210
25
F2- 400*400*400 25 14 700 400
F2- 400*400*400
400 400 L 50*50*5 407 ZAKARIA SALEH AL-TARAWNEH COMPANY

121 U-200 207 SUB CONTRACTOR:

400 400 400


975.0 2716.0 200 755
825 VARIABLE
1 2 3 HEIGHT
BASED Seven Mountains Construction
INCLINED COLUMN-H 100 ON E-Mail : smcjordan@smcjordan.com

SITE
CONDITION

EXISTING
PLATE
WELDED ON A B
SLIDE GATE
DRAWING NAME:

UPSTREAM -
STAIR DETAILS
UPSTREAM - ELEVATION AT GRID -1
SEC F-F UPSTREAM - STAIR DETAILS
1 1:40
1:40
S-804
DRAWN: A.BARHOUM CHECKED:

DESIGNED: SMC APPROVED:

DRAWING NO.: S-805