Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Question

Additional Sandbox tier can be included in the BOM for 2 months.


True

False
Message Strip Success

Correct

Question
How many countries are included as part of the Best Practice activation
service?
1

2
Message Strip Success

Correct

How much block storage will be required on the HANA DB Server for backups
during the migration process if the source system DB is sized at 2TB HANA?
3 TB
5 TB
2 TB
4 TB
Message Strip Success

Correct

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
How many additional application servers will be required when the system is
scaled up from the base tee shirt size for 512Gb HANA to the target system
size of 2TB HANA?
4
3
1
2
Message Strip Success

Correct

Question 17
What are the available DR SLA options for the customer Acme, Inc.?
12 HR RTO 30 Min RPO

4 HR RTO 0 MIN RPO

2 HR RTO 30 Min RPO

4 HR RTO 30 Min RPO

12 HR RTO 0 Min RPO


Message Strip Success

Correct

What is the required duration for SAP ECS to perform the post processing
activities on production systems?
10 hours
14 hours
12 hours
16 hours
Message Strip Success

Correct

Question 10
What is the required duration for SAP ECS to perform the post processing
activities on non-production systems?
2 working days

5 working days

4 working days

3 working days
Message Strip Success

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
Correct

Question 8
SAP S/4HANA versions that have at least _____ months of mainstream
maintenance left are allowed a "as-is" migration in PCE without upgrading to
latest S/4HANA version.
9

12

18
Message Strip Success

Correct

Question 7
What is maximum system size for the base option RISE with SAP S/4HANA
Cloud, private edition SKU deployed on SAP Data Center?
256GB

1 TB

512GB

2 TB
Message Strip Success

Correct

Question 13
Which additional and variable costs does the Partner Cloud Architect (PCA)
need to account for in a typical PCE Migration scenario?
Cost of the Migration VM

Cost of the block Storage to take any backup's during the conversion process

Cost related to temporarily increasing the bandwidth speed and the Hyperscaler
gateway port to speed up data transfer during the duration of the Migration project
Cost related to the Storage needed in the migration VM for copying the Export
dump for the S/4HANA conversion
Cost of the Object Storage

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
Message Strip Success

Correct

Question 11
Which is the most preferred option to move an on-premise ECC on any DB
customer to SAP S/4HANA Cloud, private edition?
Migrate ECC on any DB to ECC on SAP HANA in the on-premise setup followed by
conversion to SAP S/4HANA Cloud, private edition

Convert ECC to SAP S/4HANA in the on-premise setup followed by migration to


SAP S/4HANA Cloud, private edition

Migrate ECC on anyDB to ECC on anyDB in the SAP S/4HANA Cloud, private
edition, followed by SAP S/4HANA conversion

One step ECC to SAP S/4HANA conversion together with on-premise to SAP
S/4HANA Cloud, private edition migration using the SUM DMO with System Move
option
Message Strip Success

Correct

Question 4
How many external (customer invoked) DR tests are included with RISE with
SAP S/4HANA Cloud, private edition?
2 per contract year

4 per contract year

1 per contract year

Customer invoked / external DR tests are not included


Message Strip Success

Correct

Question 2
Which of the following is correct in terms of an additional Sandbox tier
required for this customer?
You will need to advise the IAE to add “SAP Cloud, memory extension for
productive tiers, private edition” to the existing BoM in order to accommodate the
additional Sandbox tier required by the customer

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
You will need to advise the IAE to add “SAP S/4HANA Cloud, additional non-
productive tier, private edition (S)” to the existing BoM in order to accommodate the
additional tier required by the customer

You will need to advise the IAE to add “SAP S/4HANA Cloud, additional non-
productive tier, private edition (L)” to the existing BoM in order to accommodate the
additional tier required by the customer

You will need to advise the IAE to adjust the FUE count for this customer to
above 135FUE’s to ensure that the QAS tier is accommodate as per the customers
requirement.
Message Strip Success

Correct

Question 22
The SAP Application System <SID> in the source system should match the
SIDs in the target system.
True

False
Message Strip Success

Correct

Question 20
How many full system refreshes is the customer entitled to in a contract
year?
1

4
Message Strip Success

Correct

Question 19

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
Which of the below statements related to Migration VM are correct ?
Storage needed for Export dump for the S/4HANA conversion is already assigned
in the migration VM by default without the partner needing to add the storage SKU
in the BOM

For the PCE S/4HANA conversion and system copy opportunities, the Migration
VM method is provided to the partners by the SAP delivery team to execute tasks
which need OS / DB access like executing SUM / SWPM etc. for Hyperscaler like
AWS, Azure and GCP

eMigration VM is available both as Linux as well as windows deployment option

Migration VM method can be used for all SAP Products running on ABAP as well
as JAVA, running on all databases like HANA/ASE, for ex. SAP PO running on ASE,
SAP Business Objects etc.
Message Strip Success

Correct

Question 2
How many dry runs are included as part of the migration process in the
production environment by ECS?
3

6
Message Strip Success

Correct

Question 3
What are the possible options for partners to move an on-premise ECC on
HANA customer to SAP S/4HANA Cloud, private edition?
Migrate ECC on SAP HANA to ECC on SAP HANA in the PCE setup followed by
conversion to RISE with SAP S/4HANA Cloud, private edition
Convert ECC on SAP HANA to SAP S/4HANA in the on-premise setup followed by
migration to SAP S/4HANA Cloud, private edition
One step ECC on SAP HANA to SAP S/4HANA conversion together with on-
premise to PCE migration using the SUM DMO with System Move option
Message Strip Success

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
Correct

Question 5
What type of storage is included as part of the base cost in a Brownfield
Migration?
Object Store / Blob / S3 Bucket

Block Storage (Storage on HANA DB)

Storage on Migration Server for Export Dump


Message Strip Success

Correct

Question
Best Practices can be implemented as part of the system or can be
completed after the systems have been handed over to the customer.
True

False
Message Strip Success

Correct

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
Question
How many additional Production application servers will be required when
the system is scaled up from the base tee shirt size for 512Gb HANA to the
target system size of 1TB HANA?
4

3
Message Strip Success

Correct

This study source was downloaded by 100000768221958 from CourseHero.com on 06-21-2024 03:36:25 GMT -05:00

https://www.coursehero.com/file/211835097/PE-S4HC-PR-DD2-WAdocx/
Powered by TCPDF (www.tcpdf.org)

You might also like