kPWEaHI GREEN J SAFE WORK ANALYSIS (ATS)
Rev 1.
Date 02/13/21
TOOLS AND/OR
EQUIPMENT TO USE
10.- For work at height, did you evaluate: certification of personnel, ladders,
4.- Was the appropriate PPE identified for the task: Helmet, Shoes, Safety glasses,
ladders, accesses, lifelines, platforms, scaffolding, fall protection equipment,
Gloves, Hearing Protectors, Respirator, are they in good condition?
anchor points
11.- Are the scaffolding assembled correctly, according to the procedure for
5.- Does the staff know the procedure to carry out the activity?
safe work at heights?
12.-Is there fire extinguishing equipment for hot work? Is the extinguishing
6.- Were INTERFERENCES or interfaces with other activities and/or operations
YE equipment in good condition?
adequately coordinated?
AH conditions? Are there screens?
HE MADE SURE TO ANSWER ALL THE QUESTIONS IN THE PREPARATION PROCESS OF A
YEAH NO
LOCATIONAL RISK : Irregular surfaces, lack of order and cleanliness, Respect safety regulations, and pay attention to signage,
falls at the same level, lack of signage, slips, trips, wounds to the travel through established and marked areas, be careful with
extremities due to contact with sharp elements, areas with poor lighting. machinery and vehicles on the construction site during transfer
BIOLOGICAL RISK : Contact with pathogenic from one place to another.
microorganisms, presence of rodents, vectors, insect bites, allergic 1.2. Protect yourself
reaction to the environment. from ultra violet rays with sunscreen and wear a long-sleeved
2.) PREOPERATIONAL TALK FOR THE PHYSICAL RISK: High temperatures, shirt to avoid direct exposure to the sun, locate water hydration
IDENTIFICATION OF HAZARDS DURING Exposure to solar radiation, skin burns (redness), fatigue due to excess points to avoid physical wear and tear.
THE DEVELOPMENT OF THE ACTIVITY heat.
BIOMECHANICAL RISK : Prolonged Postures Standing and/or sitting,
muscle fatigue, tension, spasms.
1.3. Take an active
break or work gymnastics, when the training and induction
time is extended.
LOCATIONAL RISK : Irregular surfaces, lack of order and cleanliness, 1 Respect safety regulations, and pay attention to signage,
falls on the same level, lack of signage, slips, trips due to false steps. travel through established and marked areas, use caution with
MECHANICAL RISK: Cuts, entrapment of limbs, blows, bruises, injuries machinery and vehicles on the construction site during
due to improper handling of tools and equipment, failure to properly use transfer from one place to another.
personal protection elements.
BIOMECHANICAL RISK: Overexertion due to lifting heavy loads,
3.) INSPECTION OF TOOLS, EQUIPMENT repetitive movements, inappropriate postures and turns. 2.2 Carry out inspection of equipment and tools before starting
TRANSFER TO THE WORK AREA activities, checking that they work correctly, checking that they
have safety guards for greater protection and safety in the
development of activities, using the appropriate personal
protection elements for the activity.
IA5CFV 1.885% GREEN J SAFE WORK ANALYSIS (ATS)
Rev 1.
Date 02/13/21
1 PHYSICAL RISK: High temperatures, Exposure to solar radiation,
skin burns (redness), fatigue due to excess heat, noise generated by Protect yourself from ultraviolet rays with sunscreen and wear
equipment and machinery in close proximity to the work area RISK a long-sleeved shirt to avoid direct exposure to the sun, locate
LOCATION : Irregular surfaces, lack of order and cleanliness, falls on water hydration points to avoid physical wear, mandatory use
the same level, lack of signage, slips, trips due to false steps. of hearing protection elements when exposed to high noise
NATURAL RISK: levels and/or or continuous.
Rain, electrical storm, earthquake, land flooding, hail...
BIOMECHANICAL RISK ;
Overexertion due to lifting heavy loads, repetitive movements, bipedal 3.2 Respect safety
4.) TRANSFER OF MATERIALS AND regulations, and pay attention to signage, travel through
EQUIPMENT TO THE WORK AREA WITH postures, improper turns, muscle tension, spasms, lower back pain established and marked areas, be careful with machinery and
MANUAL AND MECHANICAL vehicles on the construction site during transfer from one place
ASSISTANCE to another.
ENVIRONMENTAL RISK; Soil pollution, due to the generation of solid Apply the Environmental Management Manual
waste. 1.Ordinary and inert waste: Container
BIOMECHANICAL RISK ; Repetitive movements, overexertion; Green 2.Waste
musculoskeletal injuries. RISK Biodegradable: Green Container
PHYSICAL: Exposure to solar radiation, Vibrations, Burns or redness on 3.Plastics: White Container
the skin, headache 4 .Paper and
LOCATIONAL RISK ; Cardboard: White Container
Irregular surfaces, lack of order and cleanliness; Falls, slips, trips. 5. Hazardous Waste: Red Container Dispose of all this waste
ORDER AND CLEANLINESS OF WORK CHEMICAL RISK:
FRONT properly at the Ecopoint
Inhalation and contact with particulate matter
Take an active break or work exercise when
the working day is extended
Make use of
Hearing Protection Elements, use sunscreen
1 caseliec
IA5CFV 1.885%
kPWEaHI GREEN J SAFE WORK ANALYSIS (ATS)
Rev 1.
Date 02/13/21
* The field ATS is a tool designed to control risks at the point of work for and by the * The ATS must consider the hazards, aspects and emergencies identified in the hazard and
worker, given that conditions change permanently, it allows the identification of aspects identification, evaluation and control matrix.
differences that may exist with respect to procedures or other documents generated
prior to the activity. . * When the tasks or work carried out have established procedures, standards or practices,
these control measures must be considered as a basis for carrying out the work, and other
* All high-risk work or activities must have a risk analysis before starting the task. activities that are not contemplated within these standards must also be considered.
Activities with high potential for harm are included. The quality of the ATS will be self-assessed by the workers on the same form and reviewed in
* To carry out an activity, you must meet with your work team the field by SUPERVISION.
at the point to carry out the task, writing down in your field ATS the steps, risks and * This ATS is completed for a maximum of 7 days. If working conditions change, another ATS
control measures, emphasizing those with the greatest potential related to safety, must be completed.
health occupational and environmental (in the field ATS, you can reference and attach
the checklist or others).
PERSONNEL REGISTRATION
FULL NAME DC MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY
RESIDENT
IN CHARGE
COORDINATOR
HEIGHTS/
HS MANAGER
CONSTRUCTIONSERVICE
S
SAFE WORK ANALYSIS (ATS)
JOB OR ACTIVITY:
TOOLS AND/OR
EQUIPMENT TO USE
1.- Was the most critical RISK of the work identified? (Suspended load
L, 7.- The herr
work at heightL, falling objectSL, Hot WorkL, ElectricityL, 1 RadiographyL, conditions of s
ExplosiveL, Loads greater than 100 kgL, Excavation L, Confined spaceL
2.- Did you evaluate the conditions of the work environment (e.g.: Noise levels,
8.- Did you
Available space, Lighting, Temperature, Sup. of work, Unevenness, Dust,
evaluate the
Obstacles, Etc.)?
dangers?
3.- Did you identify the environmental aspects: oil or hydrocarbon spills, sust. Pel. 9.- Is the t area
air pollution, waste generation and discharges to water courses? clean?
RIE
7.) ROCERIA WITH MACHETE, GAUDAÑA ELECTRICAL: Electrocution due to direct and indirect electric
AND CHAINSAW shock and/or ground humidity, short circuits due to bad cables
and electrical fires generated by overheating, falling from the
same level due to an obstacle and/or lack of concentration,
overload generated by multiple connections in the same exit.
* The field ATS is a tool intended to control risks at the point of work for and by the * ATS must have
worker, given that conditions change permanently, it allows the identification of identification, eval
differences that may exist with respect to procedures or other documents generated
prior to the activity. * When the tasks are
established, these are
* All high-risk work or activities must have a risk analysis before starting the task. part of the job, and
Activities with high potential for harm are included. also within these are
* To carry out an activity, you must meet with your work ATS quality reviewed
team at the point to carry out the task, writing down in your field ATS the steps, risks in the field p
and control measures, emphasizing those with the greatest potential related to safety, * This ATS is due to
health occupational and environmental (in the field ATS, you can reference and attach complete another
the checklist or others). ATS.
PERSONNEL REGISTRATION
FULL NAME DC MONDAY TUESDAY WEDNESDA
Y
ADRIAN SUAREZ 11,437,628
HEIGHTS
COORDINATOR/HS
MANAGER
Rev 1.
Date 02/13/21
DATE:
number 2.2 Carry out inspection of equipment and tools before starting
of activities, checking that they work correctly, checking that they
squares. have safety guards for greater protection and safety in the
development of activities, using the appropriate personal
protection elements for the activity.
solar Protect yourself from ultraviolet rays with sunscreen and
alor., wear a long-sleeved shirt to avoid direct exposure to the sun,
ESGO locate water hydration points to avoid physical wear,
zone as mandatory use of hearing protection elements when exposed
to to high noise levels and/or or continuous.
footprint
s RAL:
ada..
NICO ; 3.2 Respect
osular, safety regulations, and pay attention to signage, travel
through established and marked areas, be careful with
machinery and vehicles on the construction site during
transfer from one place to another.
POST SIGNATURE
SAFE WORK ANALYSIS (ATS)
TOOLS AND/OR
EQUIPMENT TO USE
STAGES OF WORK
*CHECK YES, NO, N/A (not applicable), AS APPLICABLE.
RISK
PSYCHOSOCIAL: organizational management, job conditions
and work hours.
* The field ATS is a tool designed to control risks at the point of work for and by the * ATS must consider
worker, given that conditions change permanently, it allows the identification of identification, evaluation
differences that may exist with respect to procedures or other documents generated
* When tasks are
prior to the activity. .
established, they measure
* All high-risk work or activities must have a risk analysis before starting the task. the work, and also within
Activities with high potential for harm are included. these standards.
* To carry out an activity, you must meet with your work The quality of the ATS will
team at the point to carry out the task, writing down in your field ATS the steps, risks be reviewed in the field by
and control measures, emphasizing those with the greatest potential related to safety, the
health occupational and environmental (in the field ATS, you can reference and attach * This ATS is completed by
the checklist or others). completing another ATS.
------------------------------------------------------------------------------------------------------------------------------------------------------
PERSONNEL REGISTRATION
FULL NAME DC MONDAY TUESDAY WEDNESDAY
RESIDENT
IN CHARGE
HEIGHTS
COORDINATOR/HS
MANAGER
Rev 1.
Date 02/13/21
ed to the side
DATE:
and side
4.3Respect the
safety regulations and pay attention to the signs located on the
work site, travel through established and marked areas, be
careful with machinery and go
4.4 Do not exceed the load limit 25 Kg. per person, seek
mechanical help when the load exceeds the established
weight, take an active break when the activity is prolonged,
adopt good posture during the development of the activities.
A.K.
bar.
If any event identified as a natural risk occurs, please
suspend activities and comply with the alert call.
4.6 Use individual protection elements to
carry out activities safely and prevent possible injuries,
to, report when
or, present injuries or any other event, Signage, area
an e demarcation, entry to personnel unrelated to the activity must
be restricted, electrical boxes must be blocked so that they
cannot be manipulated by third parties, Inspection of work
areas (Signage and demarcation work front), socialization of
work procedure (ATS), fill out work permit with peli rosas
energies
gp g pg
When applicable, it must be checked for de-energization.
of the electrical system to intervene. 4.7 use of
personal protection elements, socialize the
safe work procedure at heights and activity, demarcate area to
intervene
4.8 proper use of face masks
4.9 active breaks and
pleasant communication with the contractor, manager and hse
to improve the work environment
T it t bl id ñ li dt
rate the hazards, aspects and emergencies identified in the matrix
on and control of hazards and aspects
activities that are carried out have control procedures, standards or
practices, they must be considered as a basis for carrying them out,
they must consider other activities that are not contemplated.
s.
self-assessed by workers on the same form and SUPERVISION.
for 7 days maximum. If working conditions change, it must be
ELECT
RICAL RISK: Electrocution due to direct and indirect electric shock
7.) ROCERIA WITH MACHETE, GAUDAÑA and/or due to soil moisture, short circuits due to cables in poor
AND CHAINSAW condition, electrical fires generated by overheating, falls at the same
level due to an obstacle and/or lack of concentration, overloads
generated by multiple connections in the same output.
CHEMICAL RISK : Inhalation and contact with particulate
matter
RISK
PSYCHOSOCIAL: organizational management, job conditions
and work hours.
* The field ATS is a tool designed to control risks at the point of work for and by the * ATS must consider
worker, given that conditions change permanently, it allows the identification of identification, evaluation
differences that may exist with respect to procedures or other documents generated
* When tasks are
prior to the activity. .
established, they measure
* All high-risk work or activities must have a risk analysis before starting the task. the work, and also within
Activities with high potential for harm are included. these standards.
* To carry out an activity, you must meet with your work The quality of the ATS will
team at the point to carry out the task, writing down in your field ATS the steps, risks be reviewed in the field by
and control measures, emphasizing those with the greatest potential related to safety, the
health occupational and environmental (in the field ATS, you can reference and attach * This ATS is completed by
the checklist or others). completing another ATS.
PERSONNEL REGISTRATION
FULL NAME DC MONDAY TUESDAY WEDNESDAY
RESIDENT
IN CHARGE
HEIGHTS
COORDINATOR/HS
MANAGER
Rev 1.
Date 02/13/21
DATE:
4.3Respect the
safety regulations and pay attention to the signs located on the
work site, travel through established and marked areas, be
careful with machinery and go
4.4 Do not exceed the load limit 25 Kg. per person, seek
mechanical help when the load exceeds the established
weight, take an active break when the activity is prolonged,
adopt good posture during the development of the activities.
bar.
4.5
If any event identified as a natural risk occurs, please
suspend activities and comply with the alert call.
4.6 Use individual protection elements to carry out
to, activities in a safe manner.
or, safe and prevent possible injuries, report when injuries or any
an e other event occurs, Signage, area demarcation, entry to
personnel unrelated to the activity must be restricted, electrical
boxes must be blocked so that they cannot be manipulated by
third parties, Inspection of the work areas (Signage and
demarcation of the work front), socialization of the work
procedure (ATS), filling out a work permit with dangerous
energies
gp g pg
When applicable, it must be checked for de-energization.
of the electrical system to intervene. 4.7 use of
personal protection elements, socialize the
safe work procedure at heights and activity, demarcate area to
intervene
4.8 proper use of face masks
4.9 active breaks and
pleasant communication with the contractor, manager and hse
to improve the work environment
T it t bl id ñ li dt
rate the hazards, aspects and emergencies identified in the matrix
on and control of hazards and aspects
activities that are carried out have control procedures, standards or
practices, they must be considered as a basis for carrying them out,
they must consider other activities that are not contemplated.
s.
self-assessed by workers on the same form and SUPERVISION.
for 7 days maximum. If working conditions change, you must