Corrigendum Notice 01

You might also like

Download as pdf
Download as pdf
You are on page 1of 15
Bihar Renewable Energy Development Agency (A Government Agency under Energy Department) 2 Floor, Vidyut Bhawan- I, Bailey Road, Patna ~ 800001, Bihar State, India, Tel: 0612-2505734Fax: 0612-2505572; Toll Free No. ~ 18003456204 Website: www breda.bih.nic.in Email: bredag@breda,in (Through e-procurement mode only- www.eproc2.bil in) Letter No:- 24 u Date: | ]02)202 Corrigendum Notice: 01 Eol No: - BREDA/Eol/SPV/MGSSLY/27/2021-22 Bihar Renewable Energy Development Agency, a Goverment Agency under Energy De - Government of Bihar (hereinafter called “BREDA”) invites Bids through Expression of Interest (I the Bidders fulfilling the Minimum Eligibility Criteria specified hereunder for Expression of Interes ‘Testing, Commissioning with Comprehensive Maintenance Contract (CMC for S years) including Remote Monitoring System (RMS)~of Smart Solar Street Light System on the identified existing electric pole under ‘Mukhyamantri Gramin Solar Street Light Yojana’ in Bihar State” > Minimum Eligibility Criteria [SN Minimum Eligibility Criteria _ ee 2 | Bidder should have during last five (05) Year at least had cumulative 5000 nos. of Solar Sirec Systems, Commissioned before date of submission of bid. (Required experience certitiente issued by competent authority from SNA/ Govt,/ Semi Govt. Organization or Govt Semi Govt. Bodies! Sey : DISCOM). cumulative 2.5 MW of Off-Grid/My! (Required experience Solar Bidder should have during last five (05) Year at power plants, Commissioned before date of submi competent authority from SNA/ Govt. Semi Govt. Orga DISCOM). 3. | Bidder should have Minimum Average Annual Turnover (MAAT) of Rs. 10 Cr. in last 3 financial ye (The bidder should submit Audited Financial Statement for last 3 years to this effect), Bidder should submit Banker Credit Facility Certificate fo | ‘Nationalized/ Scheduled Comme oR Evidence of Working Capital Certificate for a value of 10 Crore Format-X below) FORMAT-X by Chartered Accounted as per ” SAMPLE FORMAT FOR EVIDENCE OF WORKING CAPITAL CERTIFICATE (ISSUED ON LETTERHEAD OF CHARTERED ACCOUNTANT) This is to certify that M/s. is a reputed company with a good financial standing, If the works as per EO! is awarded to the above firm, they shall be able to provide overdrafticredit facilities to the extent of Rs. to meet their working capital requirements for executing to the above contract during the contract period. CHARTERED ACCOUNTANT > BANK DETAIL! + Bank Name- Punjab National Bank > © Branch Address- Boring Road, Patna * Account Holder Name- Bihar Renewable Energy Development Agency * Account No- 2910000100302729 * IFSC Code. PUNBO291000 ‘+ Revised Format for “FORM OF BANK GUARANTEE FOR EARNEST MONEY DEPOSIT” (Format-8) shall be as: Format 8 Form of Bank Guarantee for Earnest Money Deposit (To be furnished within the period specified in the Bidding Documents atthe time of signing of Agreement) ‘(To be stamped in accordance with the Stamp Act, ifany, of the Country/State of the issuing Bank): Bank Guarantee No. - & date... Issue date: (For Rs... Expiry date . Claim period: Name & Address of the Bank, To, Director, Bihar Renewable Energy Development Agency (BREDA), (A Government Agency under Energy Department), 2" Floor, “Vidhyut Bhawan”, Building No- II, Baily Road Patna — 800001 (Bihar) Whereas MIS. .nrnnnnn (hereinafter called the Bidder) have participated in the Eol Mloated by the Bihar Renewable Energy Development Agency (here in afer called BREDA), Vide Eo! 10. veneer dle... “Empanelment of Executing Agencies for Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for § years) including Remote Monitoring System (RMS) of Smart Solar Street Light System on the identified existing electric pole under ‘Mukhyamantri Gramin Solar Street Light Yojana’ in Bihar State” on EPC Basis 1, And whereas under the terms of the said Eol, the Executing Agency isto furnish to BREDA with a Bank G for an amount of INR (50,00,000/-) Fifty Lakhs as Earnest Money Deposit (EMD) and fulfilment of the terms (Name of the Bank).. vw (hereinafter referred to as the Bank) do antec thereof, we.. hereby undertake to pay to the BREDA an amount not exceeding INR (50,00,000)-) Fifty Lakhs against any loss or damage caused to or suffered or would be caused to or suffered by the BREDA by reason of any breach by the said Bidding Agency (3) of any of the terms or conditions contained in the said Eol. 2. Wesrnoan (Name of the Bank)...» 40 hereby undertake to pay the amounts due and payable under this Guarantee without any demur, merely on a demand from BREDA stating that the amount claimed is due by way of loss or damage caused to or would be caused to or suffered by the BREDA by reason of any breach by the same bidder of any of the terms or conditions contained in the said Eol or by reason of the bidder failure to perform the said Eol, Any such demand made on the Bank shall be conclusive as regards the amount due and payable by the Bank under this Guarantee. However, our liability under this Guarantee shall be restricted to an amount not excepding INR (50,00,000/-) Fifty Lakhs/- only. 3. Wesronen (Name of the Bank)...n..n.u: Further agree that the Guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said Eol and that it shat! continue to be enforcenble till ll the dues of BREDA under or by virtue ofthe said Contract have been fully paid and its claims satisfied or discharged or till BREDA cert the said Contract have been fully and properly carried out by the said Executing Agency and discharge the Guarantee. Unless a demand or claim under this Guarantee is male on us in writing on or before that the terms and conditions of ‘cordingly expiry of the period of ...... months from the time up to which the Guarantee continues 10 be enforceable, we shall be discharged from all liability under this Guarantee thereafter. 4. We. (Name of the Bank). further agree with BREDA that BREDA shall fullest liberty, without our consent and without affecting in any manner our obligations hereunder, to of the terms and conditions of the said Contract or to extend time of performance by the said bidder from time i timer to postpone for any time or from time to time any of the powers exercisable by BREDA a bidder and to forebear or enforce any of the terms and conditions relating to the said Contract and we shall not be relieved from our liability by reasons of any such variation or extension being granted to the said bidder or for any forbearance, act or omission on the part of BREDA or any indulgence by BREDA to the said bidder or by any such matter of thing whatsoever which under the law relating to sureties would but for jon have effect of so relieving us. wgainst the said this. prov: 5. Notwithstanding anything contained above ~ i) Ourliabilities under this guarantee shall not exceed INR 50,00,000.00 (Fifty Lakh). ii) This Bank Guarantee is valid up to —--— Nine (09) months from the date of opening of Technical Bid), iti) We are iable to pay the guaranteed amount or any part thereof under this Bank Guarantee only and only if (BREDA) serve upon us a written claim or demand on or before In witness whereof we Bank Limited have executed this on this the __day of Signature__ Name Seal of the Bank a Designation + Revised Format for “FORM OF PERFORMANCE BANK GUARANTEE” Format 9 Form of Performance Bank Guarantee (To be furnished within the period specified in the Bidding Documents at the time of signing of Agreement) (To be stamped in accordance with the Stamp Act, if any, of the Country/State of the issuing Bank): Bank Guarantee No........... & date ..... Issue date: (Por RS so... xpiry date: Claim period: Name & Address of the Bank. To, Panchayati Raj Department, Govt. of Bihar or its authorized representative, Whereas M/s. ~~ (hereinafter called the Executing Agency) have entered into a contract with the Panchayati Raj Department (here in after called PRD) or its authorized representative, Contract Agreement No, dated. Supply, installation, testing, Commissioning with Comprehensive M: including Remote Monitoring System (RMS) of Smart Solar Street L electric pole under ‘Mukhyamantri Gramin Solar Street Light Yojana’ in Bi order value of INR. nt of Executing Agencies for Desi tenance Contract (CMC for § y ht System on the identified existing State” on EPC Basi of the PRD or its authorized representative, “Empanelm for the And whereas under the terms of the said Eol, the Executing Agency is to furnish to PRD or its authorize representative with a Bank Guarantee for an amount of 5% (Five Percent) of the Contract Price for the due performance of the Contract and fulfillment of the terms thereof, we... : (Name of the Bank). (hereinafter referred to as the Bank) do hereby undertake to pay to the PRD or its reptgsentative an amount not exceeding INR. against any loss or damage caused to or sulfered or would be caused to or suffered by the BREDA by reason of any breach by the said Executing Agency (3) of any of the terms or conditions contained in the said Contract, Wesrnns (Name of the Bank)n.nnone do hereby undertake t0 pay the amounts due and payable under this Guarantee without any demur, merely on @ demand from PRD of its authorized representative stating thatthe uffered by the PRDD or its amount claimed is due by way of loss or damage caused to or would be caused to or s authgrized representative by reason of any breach by the same Executing Agency of any ofthe terms or condition, contained inthe said Contactor by reason of the Executing Agency fale to perfor the said Contact, Any such demand made on the Bank shall be conclusive as regards the amount due snd payable by the Bank under thic Guarantee. However, our liability under this Guarantee shall be restricted to an amount not exceeding INR only. We.nouo (Name of the Bank). further agree that the Guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance ofthe said Contrt and that it shall continue to be enforceable tll all the dues of PRD or its authorized representative under or by virtue ofthe said Contract have been fully paid and its claims satisfied or discharged oF tillaweomnm PRD of ite authorized representative certifies that the terms and conditions ofthe said Contract have been fully and properly carried out by the said Executing Agency and accordingly discharge the Guarantee. Unless a demand or claim tnder this Guarantee is made on us in writing on or before expiry of the period of... months from the time up to which the Guarantee continues to be enforceable, we shall be discharged from all liability under this Guafantee thereafter. AL Wenesosennmnenes (Name of the Bank)... further agree with PRD or its authorized representative that PRD ots authorized representative shall have the fullest liberty, without our consent and without affecting in any manner our obligations hereunder, to vary any ofthe terms and conditions of the said Contractor to extend time of performance by the said Executing Agency from time to time or to postpone forany time or from time to time any ofthe powers exercisable by PRD or its authorized representative agains the said Exeeuting Ayency and to forebear or enforce any of the terms and conditions relating to the suid Contract and we shall not be relieved from our liability by reasons of any such variation or extension being gr ed to the said Executing Agency or for any forbearance, act or omission on the part of PRD or its authorized representative or any indulgence by BREDA to the said Executing Agency or by any such matter of thing whatsoever which under the -*' law relating to sureties would but for this provision have effect of so relieving us, 5. Notwithstanding anything contained above — iv) Our liabilities under this guarantee shall not exceed INR v) This Bank Guarantee is valid up to vi) We are liable to pay the guaranteed amount or any part thereof under this Bank Guarantee only and only if (PRD or its authorized representative) serve upon us a written claim or demand on or bef In witness whereof we Bank Limited have executed this on this the ___day of .. . Signature _ Seal of the Bank Name __ = Designation _ “+ Revised Format for “TRANSFER OF OWNERSHIP CERTIFICATE” (Format-14) shall be as: Format 14 TRANSFER OF OWNERSHIP CERTIFICATE (To be issued in Triplicate) It is hereby certified thatthe commissioned Solar Street Light System with following details has been successfully completed five (05) CMC as per the terms & conditions of the Eol & transfer of ownership to the PRD or its authorise) representatives in satisfactory working condition, under “Mukhyamantri Gramin Solar Street Light Yojana” in Bihar Siate. [[SL.No. Items Details i ‘Name of system = ‘Smart Solar Street Light System 2 ‘Work Order No. & date 3 ‘Name of Beneficiary/ Depariment eee (Nodal Officer with mobile number) 2 a District 7 _ - 3 * | Block/ Tehsil - Gram Panchayat/ Town _ 7 Exact location on installation (land mark) Date of commissioning - Date of CMC (5 years from commissioning) completion of SSLS Name & Address of the Executing Agency of the system: Contact Number: email: : a : elelJa 10 SPV Modules installed + | Sr.No Make Model | Ti Battery - ~ Sr. No. Make Model 12 Luminaire - — Sr. No. Make | Model | ‘The ownership of the Solar Street Light System & its equipment is being wansferred in working condition | --so(PRD or its authorized representative) Signature of Executing Agency Signature of BREDA Signature of PRD with Seal Representative Representative (BREDA will retain one copy for office record and one will be with Beneficiary/ PRD) ‘+. Revised Format for “DRAFT CONTRACT AGREEMENT” (Format-1 7) shall by Draft Contract Agreement Contract Agreement No. os This Contract agreement is made and entered into__day of month of year 2022 between representative of Panchayati Raj Department, GoB, (hereinafter refered to 85 “Owner, which expression shal, unless repugnan fo the context or meaning thereof, include its successors, administrators and assigns) of the ONE PARTY ‘And (hereinafier referred to as the Mis having its office at xecutin Agency” which expression shall, unless repugnant to the context or meaning thereof) include its successors administrators and assigns) of the OTHER PARTY, WHEREAS the Owner, desirous of associating withthe Executing Agency for “Empaneiment of Executing Agencies for Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for 5 years) including Remote Monitoring System (RMS) of Solar Street Light System on the ident isting electric pole under ‘Mukhyamantri Gramin Solar Street Light Yojana’ in Bihar State” on EPC Basis ° AND WHEREAS the Executing Agency had signed its Empanelment Agreement No.__ Date for the said Project under Bol No: BREDA/Eol/SPV/MGSSLY/27/2021-22. 7 —— NOW THEREFORE THIS AGREEMENT WITNESS AS UNDER: Article - 1.0 ~ Definition In this Contract Agreement, the word and expression shall have the same meaning as are respectively assigned to them in the Contract Documents specified hereunder, attached herewith, which form an integral part ofthis Comtrnct Agreement. This Contract Agreement together with all the Contract Documents attached therewith is referred to as the Contract for all intent and purpose of the aforesaid Project. Article - 2.0 - Period of Validity of Contract Agreement ‘The Contract Agreement shall valid for a period of Two (02) Years from the date of signing of Contract ‘Agreement. The validity of Contract Agreement may be extended after issuance of extension notice by BREDA. Article - 3.0— Contract Agreement Documents ‘The Contract Agreement shall be performed strictly as per the terms & conditions stipulated herein and in the following documents attached hereto (hereinafter referred to as “Contract Agreement Documents”) I. The Contract Agreement between the representative of Panchayati Raj Dey ‘Agency and the attachments there to (This Contract Agreement). IL. Copy of Empanelment Agreement between BREDA and Executing Agency (Appendix 1). ment, GoB and the Executing ‘The above contract documents shall form an integral part of this Contract agreement. All documents forming pafiheconmas documentaries tbeconsive complement) snap ~~ Agreement shall be read as a whole. Article - 4.0 - Scope of Work The detailed scope of work of the Executing Agency, under the Agreement has been brought out in the Agreement Documents, However, the above scope of work of the Executing Agency shall also include such even work af may not have been specifically brought out inthe sad Contract Agreement Documents but samy ke necessary forthe safe and successful completion of the various items of work envistged as por good engineers practice and recognized principles. The approved Unit Price of Solar Street stem is for the entire scope ot supply & services. TDS deduction, as applicable, would be levied by PRD or its authorized representatives Article - 5.0 — Price of Solar Street Light System ‘The unit price of Solar Street Light System (excluding GI Pole) shall be Rs. C ) inclusive ofall taxes, duties, levis, fees, ete. The price shall remait fixed and Tay and shall not change on any account whatsoever, for the duration of the Contract Agreement and wherever if required, As Hot Dipped Galvanized Iron (HDGI) pole for mounting Solar Sree Light then the payment shal be mate as per Building Construction Department (BCD) SOR rate applicable. PRD or its authorized represent es will not pay anything over and above this pres unlessasothervse specie, All the matters eating tothe enc to the executing agency shall be as per the Terms & Conditions and subject to the requirements as specified in the said Conditions of Agreement of Eol No: BREDA/Eol/SPV/MGSSLY/27/2021-22. Article - 6.0 ~ Schedule of Completion of Work Order Time is the essence of work order and shal be strictly adhered to, The Executing Ageney shall so ompanize iy resources and perform its work as to complete it within @ period of 6 month from the date of isuance of pantical work order. Aricle- 7.0 ~ Inspection () Material Inspection a) The Executing Agency after approval of Complete Smart Solar Street Light System Model shall rie inspection call for material inspection to BREDA, Based on the raised inspection eal by the Excewies Agency, representatives of BREDA & PRD or its authorized representative shall carry out the materi * inspection at warehouse in Bar forthe Solar Street Light System including Module, Luminary, Batter Remote Monitoring System (RMS), Cables, Fittings, Earhings Kit, Nu-Bolls, HDGI Pole (Whose required) ete. as per approved “Complete Street Light System Model” and other technical requirement st mentioned in this Eol. 5) After successful material inspection and submission of complete test reports of Solar Steet Light System the Dispatch Instruction (D1) shall be issued by BREDA. ©) In case of any discrepancy! deviation is found in the material inspection report as per Format-11 and quality parameters of the test certificates! reports, the executing agency shall be intimated about set . discrepaney/ deviation and Dispatch Instruction shall not be issued. 4) No partial inspection of material shall be allowed in terms of both (a) partial quantity against ised work order (b) partial component/ nos. of SSLS units as inspection call raised to BREDA. * (i) Commissioning Inspection 8) The Executing Agency after receiving the DI & completion of instalation of Smart Solar Street Light Systems along with RMS, to be commissioned shall raise inspection call for commissioning to BREDA ) Based on the raised inspection call by the Executing Agency, representatives of BREDA & PRD or its authorized representative shall earry out the inspection ofthe Solar Street Light System to be commissioned and after inspection of Solar Street Light System including Module, Luminary, Battery, Remote Monitoring System (RMS), Cables, Fittings, Earthings Kit, Nut-Bolts, HDGI Pole (Wherever required) et. as pes approved “Complete Street Light System Model” and other technical requirements as mentioned in te Fol, a the identified sites in Bihar, the Joint Inspection Commissioning Report (JICR) Format12 shall be issued ¢) After inspection ofthe Solar Street Light System Executing Agency shall ensure that the RMS i functional along with network connectivity and Performance Report are being generated & obligated Comprehensice Maintenance Contract (CMC) activities along with Routine Maintenance Report are being performers certified accordingly as per Eol. Gil) Comprehensive Maintenance Contract Obligations a) The Executing Agency after commissioning of Solar Street Light System shall ensure that the Solar St Light System with RMS is functional along with network connectivity and Performance Report ane han generated & obligated Comprehensive Maintenance Contract (CMC) activities as per with Routine Maintenance Report are being performed/ certified accordingly as per Lol b) The Executing Ageney is required to certify the Routine Maintenance Report on monthly, quarterly, half yearly or as required as per activities & scheduled mentioned in the Eol ©} The service centers! representatives of Executing Agency are required to ma complains rectification of the SSLS. -13 along fain a service lop, book for Article - 8.0 - Terms of Payment 8) Material Supply Payment: -Thirty (30) percent of the particular work order value against submited invoice on issuance of (a) material inspection report to be done by representatives of BREDA & py, Govt of Bihar and (b) Dispatch Instruction (DI). The payment will be released by PRD or its authorized representative on the basis of submission of the material inspection report to be done by representatives * BREDA & PRD, Govt. of Bihar and Dispatch Instruction (DI) issued by BREDA. b) Commissioning Payment: -Forty (40) percent of the particular work order value against submited invoiee on issuance of satisfactory Joint Inspecton-Cum-Commissioning Repost JICR) Format-12 along with work completion cum performance report (Format 10) by representatives of BREDA & PRD or th authorized representative ©) Payment of commissioning shall be made after deduction of delay penalties (Liquidated Damages) if * as applicable in line with Eol terms & conditions, 4) Comprehensive Maintenance Contract Payment: - Balance Thirty (30) pereent ofthe work order value shall be paid in 10 half yearly installments (.e. 3% half yearly in the eyele month of October and Apri towards Comprehensive Maintenance Contract against submitted invoice on (a) Routine Maintenmce feport certified by representatives of BREDA and (b) Performance Report to be preferably generated from an automated Remote monitoring system (as por prescribed format) of the installed Solar Stret Light Systems to be submitted by the executing agency. 6), Payment of CMC shall be made on pro-rata basis towards the numberof solar treet light systems working satisfactorily (ie, iFupto 97.99% of the systems of the particular work order is ettfied tobe in satisfactony working condition, then 97.99% of the CMC payment shall be done). However, if 98% of the system is certified to be in satisfactory working condition, then 100% of the CMC payment shall be done (.e. ir 98% factory working condition, then 100% of the systems of the particular work order is certified to be in satis of the CMC payment shall be done). ) Payment of CMC shall be made after deduction of delay penalties (Liquidated Damages) if any, as applicable in line with Eol terms & conditions. Article - 9.0 — Penalty/ Liquidated Damages @ Delay in Commissioning: The delivery of the material in time is the essence of the contract and for ensuring the commissioning of alloted SSLS works within 6 months (180 days) which is guaranteed under this penalty clause. Incase, the éxecuting agency fails to complete the alloted work within the time period specified inthis Eol / Contract / Work Order the penalty clause shall be imposed. The usual term of penalty is at the rate of 2% of the Contract, Price per month of delay, subject to maximum upto 10% of the Contract Price unless Extension of Time (EoT) is allowed by PRD or its authorized representative, Once the maximum penalty reaches, PRD or its authorized representative may consider for termination of the work order of such works and further necessary action as deemed fit may be initiated. For the purpose of calculation, one month means a period of 30 calendar days i) Delay in CMC: ‘The CMC obligations under this contract is the essence for ensuring the proper functioning of the ——— Ss, = Clause. In ease, the executing agency fails to cary out the obligations of the CMC within the time perie) specified in this Eo / Contract the penalty clause shall be imposed. The usual term of penalty iyat the rae INR 10/. (Rupees Ten) per day per SSLS and shall be imposed after 72 hours from the intimation of delecy rectification to be done tll is reification by the executing agency. In cases where required the penalty shell be recovered from the subsequent allied payment or the Performance Bank Guarantee (PEG) of the Executing Agency, as the case may be. Article* 10.0 ~ Service Centre 1) The scope of work also includes mandatory opening of Service Center in the bidder's name at relevan locations in concerned distievs through which servicing and maintenance should be provided as stipulated in Bid document. The maintenance shall include detailed testing for fault identification & its rectification shal include replacement! repair of any damaged parts to restore the system in working condition. Apart from this, any complaint registered/ service calls received /IVRS / faults notified inthe report generated by the RMS any other legal means should be attended and rectified within 72 hours, b) The executing agency shall be required to establish at east one Service Centre in each distrit with aueq manpower and at least two mobile number with WhatsApp for registering the complaints and its redressal nn sufficient numbers of critical components (Spares & Consumables) should be available. ¢)_ The service centers are required to maintain a service log book for complains redressal of the beneficiary per the format attached. Article - 11.0 ~ Transfer of Ownership + The Ownership of the Solar Street Light System and Equipment shall be transferred in working condition to BRD or its authorized representative, when Comprehensive Maintenance Contract (CMC) is complete successfully of the commissioned Solar Street Light System on the Site. Article - 12.0 - Arbitration and Jurisdiction * Any dispute between the PRD or its authorized representative and Executing Agency arising out of this Contract will first be resolved amicably between the both Parties, In such eases where dispute is not resolved between the Parties, then the Parties may mutually agree to appoint an arbitrator under the provisions a Arbitration and Conciliation Act, 1996. © Any disputes arising shall be subject to the jurisdiction of the High Court of Pat + Whenever required BREDA shall provide assisiance in arbitration with respect to interpretaion of the EOL clauses, + The provisions relating to Arbitration and Jurisdiction are specified in Bol document, In ease of any- conflict amongst Contract Agreement Documents, the decision of the PRD or its authorized representative shall be final & biding on the Executing Agency. This Contract is executed in English Language, each party receiving one set and both the sets are authentic. IN WITNESS WHEREOF the Parties through their duly authorized representatives have signed this agreement on the day, month and year mentioned herein of before. Witness. (Panchayati Raj Department, GoB) Fa (Authorized Person Name) (Executive Agency Seal) | itness-2 | (Executing Agency) (Authorized Person Name) i > Revised Format for “MATERIAL INSPECTION REPORT” (Format-11) shall be as Format tf Material Inspection Report 11 is hereby certified that following SOLAR STREET LIGHT SYSTEM supplied under “Empanelment of Executing Agencies for Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for 5 years) including Remote Monitoring System (RMS) of Smart Selar Strvg {Light System on the identified existing electri pole under ‘Mukhyamaniri Gramin Solar Street Light Vojuea! in Bihar, State” with following details has been supplied at Warehouse:- © Name of Distric © Name of Executing Agency. © Work order no. and date...... + Quantity. DETAILS OF SOLAR PV MODULES _ 1. |a) SPV Modules Type (Poly/Mono crystalline/or other) ~ fa) b) Sr. No of module: ic) Make of module: id) Model No: ©) Module wattage 1) Module Voc: g) Module Ise h) Module Vp: i) Module Imp |i) Module effici k) year of manufacte MINAIRE with BATTERY details (Battery detail should be written in luminary ea ~[a) Details of Battery _ a) b) Type of Battery _ __ by — ©) Sr. no of Battery Te) d) Make of Battery: @) ) Model No: 2) 2. [f) Name of Mi D ri eam) 4 uuminaire hd i). Model No. a i) = {)) Wattage of Luminaire 7 7 HN — j) Year of manufacturing of Luminaire : kD NEW HDGI POLE / MOUNTING STRUCTURE AND OTHER HARDWARE and ACCESSORIES 3. Ta) Specify the Name of Manufacture of HDGI POLE / i STRUCTURE / HARDWARE P Length and Size of HDGI Pole jo Galvanization thickness in mm. 4, [aul the cable should be multi strand copper conductor properly insulated and sheathed. It is certified that the solar street lighting system is supplied as per tech ccifications 4 agreement, if any shorteoming is found in future, will be fepai edirepiacsdinactihy pame deh 88 per the Signature of Executing Ageney Signature of BREDA Signature of PRD with Seal Representative Representative “+ Revised Format for “Covering Letter” (Format-2) shall be a: Covering Letter (On the Bidder’s Letter Head): Format 2 From: (Full name and address of the Bidder) rector, Bihar Renewable Energy Development Agency (BREDA), int Agency under Energy Department), hyut Bhawan”, Building No- Il, Baily Road Patna ~ 800001 (Bihar) Sub: Empanelment of Executing Agencies for Design, Supply, Installation, ‘Testing, Commi Comprehensive Maintenance Contract (CMC for years) including Remote Monitoring System (RMS) ‘of Smart Solar Street Light System on the identified existing electric pole under ‘Mukhyamantyi G Solar Street Light Yojana’ in Bihar State. Eol No: BREDA/Eol/SPV/MGSSLY/27/2021-22 Sir, In response to your above referred Eol, we hereby submit our Bid for “Empanelment of Executing Agencies for Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for $ years) including Remote Monitoring System (RMS) of Smart Solar Street Light System on the identified existing éleetrie pole under ‘Mukhyamantri Gramin Solar Street Light Yojana’ in Bihar State” in compliance with tent: & conditions of the Bidding Documents referred to therein, A copy of the Bidding Document, duly signed on exch page is also submitted as a proof of our acceptance of all specifications as well as Terms and Conditions therein, We have submitted the documents as per Checklist along with requisite amount of Bid Security (EMD) inthe form of Bank ‘Guarantee (BG) from a Nationalized/ Scheduled Commercial Bank. PROPOSED MANUFACTURERS (from list of Empanelled Manufacturer) UNDER DIFFERENT COMPONENTS OF SMART SOLAR STREET LIGHT: (OPTIONAL) Proposed Luminary Proposed Battery Manufacturer Manufae Signature Seal of Bidder (Nome mete Designation Date tee % 3.16 CENTRALIZED REMOTE MONITORING SERVER: Cla: CENTRALIZED REMOTE MONITORING SERVER: ¢ * 4,15 ELECTRONICS: SL. NO. IV: Clause Deleted. + 1.21.3 Clause is revised as : The Performance Bank Gu as mentioned below: i) Part one of the 5 % PBG shall be valid for a period of Thirty (30) months from the date of > issuance of work order ii) Part two of the PBG shall be of 2 % of issued work order value and shall be valid for a period of Thirty Nine (39) months from the expiry of validity of Part one PBG (30 months), ‘The % PBG (Part one) submitted by the bidder initially shall be released on successful completion of performance of the system after 30 months and submission of the 2 % PBG (Patt two), ntee shall be bifurcated into two Revised EOL CLAUSE 4.15 REMOTE MONITORING SYSTEM: Revised EOL CLAUSE 4.15 REMOTE MONITORING SYSTEM: 1. The Smart Solar Steet Lighting System shall automatically connect othe public mobile network via 2GISG/4G/503 or any latest technology networks for sending data to cloud server or CMS (Central Moni Server) via RMS hardware. The remote monitoring system shall collect and centrally send veal-time perturmance ine Cincung equipment failures as per ist below) foreach Smart SSLS. RMS hardware shall bevastalled hese luminary and shall be capable to generate report for functionality issues, healthiness, problem status ee, aaa, lod server with he help of GSM module & the network coverage shal be updateable Over The Air(OTA} during the contrat period. The frequency of data transmission (Send Interval) shouldbe atleast 6 times ina doy ae interval of 4 hours. All communication of RMS device with CMS must follow Goverment of India Mien specifications as applicable. The executing agency shall ensure that the supplied RMS Device should be hack mer and leak proof to avoid the malicious activity or event. The communication nodes shall connect to the charge controller through suitable communication interface and automatically sense and monitor various parameters of the Solar Street Light. The RMS dashboard shall capture the following parameters: 1) Battery Parameters: a) Battery Voltage (BV) b) Battery Current (BI) ©) Battery Power (BP) 2) Solar PV Parameters: a) Solar PV Voltage (SV) b) Solar PV Current (SI) ©) Solar PV Power (SP) 3) Load Parameters: 2) Load Voltage (LV) b) Load Current (LI) ©) Load Power (LP) 4) Load ON/OFF condition 4) System shutdown due fo fault (even fault should be recorded) 2. Illustrative Parameters to be Displayed in the District level Dashboard of the j interface (Web UD: the RMS software (GUIY web user ‘Sr. No._| Parameters to be monitored i i EL 2_| Serial no. of Li ‘Battery Voltas Bat wer ‘Solar Module. jolar Module Current Power Luminary Voltage ‘Luminary Current Luminary Power System S fa ‘Luminary fault Battery Fault Dai ule fault uuminary fault Date suminary fault Time. uminary ON. uminary OFF time ime di ion date rightness Level ‘ll Bright 7 | Harv atlery State of Char 29. | Battery Depth of Discharge (4) of BREDA). All related data/service charges for the same shall be in bidder scope. . Software NOTE 2: A Separate RFP may be floated for CMS (Central Monitoring Server & Softwar F Successful Bidders has to later coordinate with the selected CMS vendor to maa om ee uninterrupted Remote Monitoring features availability as per this Eol, 7 *% 3.4.1.1 Clause is revised as : The Executing Agency after commissioning of Solar Street Light System shall ensure that the Solar Street Light System with RMS is functional along with network connectivity and erformance Report are being generated & obligated Comprehensive Maintenance Contract (CMC) activities as per Format-13 along with Routine Maintenance Report are being performed/ certified accordingly as per Fol, Also, the following Service Level Agreement (SLA) has to be ensured as per site conditions: Solar Street Light Service Level Agreement Compliance “J Date: Name of the Client / User Place of installation (Village) ‘Gram Panchayat. Block District - a Date of visit a 7 oT | Name & address of the staff (visiting the installation) 7 (8) OBSERVATIONS ro 7) 7 | (To be filled-in by the successful bidder) Quarter | Quarter | quarter | quarter Visual damage of all Components / Equipment / Items in SSSLS: (Monthly) If any damage, pls mention. Checking of Cleanliness of PV Modules (Monthly) Looseness of PV Modules (Monthly) Inspection of Luminary: (Monthly) Tightness of Nuts, bolts, of Module Mounting ~ Structures. (Quarterly) Tightening of the all electrical connections - (Quarterly) Verification of Harvested Energy (Monthly RMS - = Data to be furnished) _ Verification of Maintenance/ Complaint Log book records (Monthly) ‘Checking of Spares and Consumables availability wrterly) s of the Smart Street Lighting system ~ —— (Monthly) 2 7 - | Remarks of the User a ae * Work Completion cum Performance Report (Format 10) is revised as: Format-10 Work Completion cum Performance Report . (Summary) This is t0 stale that Mis (With Full Address), has Successfully completed the work of design, Supply, Installation and Commissioning of Solar Street Light under “Empanelment of Executing Agencies for Design, Supply, Installation, Testing, Commissioning with Comprehensive Maintenance Contract (CMC for 5 years) including Remote Monitoring System (RMS) of Smart Solar Street Light System on the identified existing electric pole under ‘Mukhyamantri Gramin Solve Street Light Yojana’ in Bihar State” as per following details: Site__| |_&Date | Commissions | ground level | a] Location! | District [ W.0.No. | SSIS] Lax Measured at Remarks) = eI | Total Solar Street Lighting System Installed & Commissioned The Workmanship and performance of the installed systems are found satisfactory and are in successful ‘operation as per tender terms and conditions. . Executive Agency Seal & Sign (Authorized Signatory) PRD Seal & Sign (Authorized Signatory) BREDA Seal & Sign (Authorized Signatory) ‘The existing ol is being incorporated with the following Changes/Corrections/Additions/Deledons ide this Corrigendum Notice -01. Shier 8 Assistant Director, BREDA, Pa

You might also like