Test Work Permit Procedure (29-05-2024)

Total points 76/100

Choose the right answer from MCQs given below.

Email *

kingz ack0332@gmail.com

Apprentice Name:

AhmadZohaib

P. #:

6867
There are ____________ types of work permit in FFC-GM 1/1

None Of These

Permit system ensures safety of 1/1

Personnel

Plant Facility

Both

Safe Job Execution is the responsibility of 1/1

Production

Maintenance

Safety
Retention time for permit after job completion is 0/1

One Month

One Week

Fortnightly

42 Days

Other:

Correct answer

42 Days

Physical verification by Shift Engineer is mandatory for all jobs 0/1

True

False

Correct answer

True
Pneumatic Tools operation is covered in 0/1

Civil Work Permit

Cold Work Permit

Hot Work Permit

Correct answer

Hot Work Permit

Maximum explosivity allowed at FFC to permit for Hot Jobs 1/1

0%

15%

5%

40%

If a vehicle is fitted with spark arrestor, explosivity test is not required 1/1

True

False
Project & Electrical Engineer Co-Signing is required at excavation of depth more 1/1
than

6 inch

12 inch

18 inch

At what excavation depth confined space permit is applicable 1/1

1 meter

1.5 meter

2 ft

Dosimeter badge is not mandatory for the Inspection Technician carrying out 1/1
Radiography

True

False
During radioactive source transportation the extent of radiations outside container1/1
should not be more than

0.7 Milliard / Hour in air

0.75 Milliard / Hour in air

0.85 Milliard / Hour in air

During normal days work permit is issued for maximum of 0/1

8 hrs.

9 hrs.

12 hrs.

Correct answer

8 hrs.

Minimum Oxygen percentage valid for confined space entry is 1/1

19 %

19.5 %

21 %
Oxygen meter low value buzzer shall sounds if oxygen drops to 1/1

19 %

19.5 %

20 %

Permit can be issued to Contractors employees or Contractor 1/1

True

False

Safe angle for ladder positioning is 1/1

75 Degree

60 Degree

45 Degree

Shoring timber must extend above top of excavation minimum by 1/1

15 cm

30 cm

60 cm
Scaffolding structure more than 26 ft high requires fixing to some other structure 1/1

True

False

Safety Harness is used to arrest falls 1/1

True

False

If the tools arrangement takes more than two hours after permit exchange, the 1/1
permit becomes Invalid or Void

True

False

Safe Job Handover is the responsibility of 1/1

Executing's agency

Initiating agency

Safety
After completion of job, Housekeeping is the responsibility of 1/1

Area Operator

Executing Crew

Toe Plates should not be provided around working platforms at heights 1/1

True

False

Confined space entry work permit is required for entry in excavation more than 1/1

220 cm

100 cm

150 cm

Category B Electrical Jobs requires co-signing 1/1

True

False
The meter scale above 60% indicates that the concentration in this range is almost 1/1
explosive.

True

False

For plant site, confined space entry attendant shall be arranged by ____________ 0/1
agency

Work Permit Issuing

Executing Agency

Correct answer

Work Permit Issuing

Maximum voltage allowed for Lighting in confined space is 1/1

72 Volt

48 Volt

220 Volt
Earth Leakage Circuit Breaker (ELCB) with Isolating Transformer is to be 0/1
provided and located as close as possible to the source of power and must be safely
supported outside the confined space. for voltage above in confined space.

72 Volt

48 Volt

220 Volt

Correct answer

48 Volt

During shut down it may be possible to combine certain items of equipment on 1/1
one cold work permit. This is known as

Project

Cold Permit System

Blanket Permit

Any lifting greater than 75 percent of the rated capacity of crane or hoist used for 1/1
the operations.

Blind Lifting

Complicated Lifting

Heavy Lifting
Radiography should not be done without proper shielding near flame detectors of 1/1
B-601/602/605, F-202 and gas turbine, control compartment of gas turbine,
capacitance type transmitters installed at urea plant proximeter J.B's of all
vibration equipments and control rooms during normal plant operation.

True

False

If higher voltage electrical equipment is to be used inside Urea reactor, then the 1/1
Requesting Section must obtain approval from

DM Electrical

Electrical Engineer

GM M&O

During the Job inside confined space, Job Conditions are changed, What to do 1/1
first?

Get New Permit

Stop The Job

Get Help
Block & Bleed arrangement for confined space entry permit 0/1

Acceptable

Not Acceptable for long time

Not Acceptable

Correct answer

Not Acceptable

Mechanical isolation for vessel entry is 0/1

Block & Bleed

Closed Valves

Blind

Venting

Correct answer

Blind

Confined space permit covers 1/1

Hot Jobs

Cold Jobs

No Job

Entry Only
Radiography area is cordoned off as per 1/1

Area Requirement

Control Room Order

Isotope Strength

Equipment Service

Security of MOS requires co signing of 1/1

Coordination Engineer

Instrument Engineer

DM

No Co Signing is required

Jobs at Instrument racks, required co signing of 1/1

Coordination Engineer

Instrument Engineer

DM

No Co Signing is required
Prior to Starting a job, Who will explains Safety Instructions to Area Engineer / 1/1
Designate

Area Operator

Maintenance Supervisor

Shift Incharge

Coordination Engineer

Safe Welding earth is with 0/1

Piping

Vessel

Structure Beam

Welding Machine

Correct answer

Structure Beam
Additional protective equipment are not required, what to be mentioned on work 1/1
permit

Ear Plug

Safety Goggles

Ammonia Gas Mask

None

Cotton Gloves

1/1

Ear Plug

Safety Goggles

Ammonia Gas Mask

None

Cotton Gloves
The Condition in which the permit is to be __________ if permit is not extended 1/1
after 1 hour of next shift.

Invalid

Re- issue

Valid

Stopped

Extend

The Condition in which the permit is to be __________ if the job scope extends. 0/1

Invalid

Re- issue

Valid

Stopped

Extend

Correct answer

Re- issue
The Condition in which the permit is to be __________ if workers are not using 1/1
PPEs mentioned on permit.

Invalid

Re- issue

Valid

Stopped

Extend

The Condition in which the permit is to be __________ if permit is extended for 0/1
next 9 hours during normal operation.

Invalid

Re- issue

Valid

Stopped

Extend

Correct answer

Invalid
The Condition in which the permit is to be __________ if any particular of the 1/1
permit is left unchecked or blank.

Invalid

Re- issue

Valid

Stopped

Extend

The Condition in which the permit is to be __________ if fire extinguisher is 0/1


placed nearby but not accessible.

Invalid

Re- issue

Valid

Stopped

Extend

Correct answer

Stopped
The Condition in which the permit is to be __________ if SCABA placed for 0/1
confined space entry is without seal.

Invalid

Re- issue

Valid

Stopped

Extend

Correct answer

Stopped

The Condition in which the permit is to be __________ if Housekeeping of area is 0/1


not good.

Invalid

Re- issue

Valid

Stopped

Extend

Correct answer

Stopped
It is the responsibility of initiating agency to define work and ensure fulfillment of 0/1
all safety checks of work permit before handing it over.

True

False

Correct answer

True

Ladder inspection is carried out on 1/1

Monthly Basis

Quarterly Basis

Annual Basis

Six Monthly Basis

Who will double checks, signs the permit & retains the hard copy. 1/1

Area Operator

Area Engineer / Designate


Checks on machines / equipment's are carried out before exchange or closing of 0/1
work permit.

True

False

Correct answer

False

Permit required for arrangement of Tripod / Portable Lights in area 1/1

Electrical

Cold

Hot

None

Required Tag on completed Scaffolding Structure is 1/1

Red Tag

Scaffolding OK

Toe Boards

None
For offsite facilities Work permit is valid for 1/1

8 Hours

12 hrs.

One Day

None

While entering the vertical vessel, following PPEs is required 1/1

Life Line

SCABA

Full Face Mask

None

If there is a risk of Suffocation then what PPE must be used in confined space 1/1

Breathing Appratus

Ammonia Gas Mask

Dust Mask

Face Shield
Which type of work permit is required for Transmitter Calibration. 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined

Which type of work permit is required for Scaffolding Erection / Removal 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined
Which type of work permit is required for Sandblasting 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined

Which type of work permit is required for Opening & assembling of Piping 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined
Which type of work permit is required for Removal of Valve Bonnet 0/1

Cold

Hot

Electrical

Civil

Instrument

Confined

Correct answer

Cold

Which type of work permit is required for Wall Plastering 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined
Which type of work permit is required for Entry inside a vessel 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined

Which type of work permit is required for working on electrical circuit 1/1

Cold

Hot

Electrical

Civil

Instrument

Confined
Permit required for Flight Pump Operation in Trench 0/1

Cold

Hot

Electrical

Civil

Instrument

Confined

Correct answer

Hot

Well Area Facilities are classified as 1/1

Offsite

Battery Limit

Area around Weighing Bridge is classified as 0/1

Offsite

Battery Limit

Correct answer

Battery Limit
11 KV line to APL is classified as 1/1

Offsite

Battery Limit

Scarp Drain Line & Adam Sohaba Line is classified as 1/1

Offsite

Battery Limit

Trench & Lines containing Air Conditioning Circuits are responsibility of 1/1
Utilities.

True

False

Gas Compression station at DSP is classified as 1/1

Offsite

Battery Limits
Urea Bulk Storage is classified as 0/1

Offsite

Battery Limits

Correct answer

Battery Limits

Lime Storage is classified as 0/1

Offsite

Battery Limits

Correct answer

Battery Limits

Soft copy of permit should be available in 1/1

Control Room

Area Operator Cabin

Displayed in Area
Fire Water Network in Production units is the responsibility of 1/1

Respective Area

Safety

Security

Admin

Rest of Fire Water Network except in Production units is the responsibility of 1/1

Respective Area

Safety

Security

Admin

Rest of Fire Water Network except in Production units is the responsibility of 1/1

Respective Area

Safety

Security

Admin
Evaporation Ponds are classified as 1/1

Offsite

Battery Limits

Township Potable Water Plant & Township AC plant is classified as 1/1

Offsite

Battery Limits

6.3 KV line to Township is classified as 1/1

Offsite

Battery Limits

HVAC system and window type ACs electrical job is classified as 1/1

Categoty A

Category B
Communication and fire alarm system electrical job is classified as 1/1

Categoty A

Category B

UPS & DCP panels electrical job is classified as 1/1

Categoty A

Category B

Medium voltage generators (Auxiliaries not included) electrical Job is classified as 1/1

Categoty A

Category B

Medium and low voltage bus bar in substation electrical Job is classified as 1/1

Categoty A

Category B
In Scaffolding All ties provided. Distance between two ties is 6ft. Lowest tie 1/1
point is 6" above ground

True

False

All planks are extended 9 ft - 10 10 ft (Minimum) outside the ties of Scaffolding. 1/1

True

False

Scaffolding of height to width ratio higher than 4:1 is secured with other fixed 0/1
structures

True

False

Correct answer

False
Scaffolding of height to width ratio higher than 4:1 is secured with other fixed 0/1
structures

True

False

Correct answer

False

Ladder is extended 4 ft above the platform level of Scaffolding 0/1

True

False

Correct answer

False

Allowable load on scaffolding platform is two persons plus 50 kg weight (for tools 1/1
etc.) per square meter.

True

False
Maximum free span of wooden plank is 4 feet in Scaffolding. 1/1

True

False

Toe boards are provided where scaffolding platform height is more than 8 ft from 1/1
ground

True

False

Hot Work permit will be required for use of camera within plant battery limits. 1/1

True

False