CONTROL SCHEMATIC DIAGRAM
COVER SHEET
D64-3CF-509071 0
SHEET NO. - 1
JSW-BHUSHAN POWER & STEEL LIMITED
N.A.
PROJECT NO. - PC0681
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
INDEX
D64-3CF-509071 0
SHEET NO. - 2
SEAL/SPREADER AIR
S.A. FLOW TO START-UP S.A. AIR TEMP. S.A. FLOW TO START-UP S.A. AIR TEMP. P.A. S.A. TO FUEL FEEDERS +
DRAG CHAIN FROM FI-401 BURNER AFTER APH (RHS) AFTER APH (RHS) BURNER AFTER APH (LHS) AFTER APH (LHS) STEAM FLOW
SA TO BED ASH COOLER FROM
FUEL OIL FLOW ATOMIZING AIR OIL PRESSURE MAIN STEAM PRESSURE P.A. FAN-1 AIR FLOW P.A. FAN-2 AIR FLOW DISCHARGE S.A. FAN-1 AIR FLOW S.A. FAN-2 AIR FLOW DISCHARGE SHEET-6 O 2 ANALYSER
FEEDERS SPEED F/B COAL FLOW STACK SO2
*
n
n
1oo2 FUEL
SELECTION
(a) (b) n n n n
TOTAL
H COAL FLOW
LSP LSP
RSP
(a-b) L
REVERCE
REVERSE ACTION SUMMATION SUMMATION REVERSE
ACTION ACTION (%)
W
TO BFG COMB.
< >
(0.8 kg/cm2) CONTROL
L
TOTAL START-UP 0.8 TO 1.2
COAL FIRING % BURNER AIR FLOW
LSP
(TPH)
NOTE-2 (TPH)
(1 to 1.5 kg/cm2) 2.5 L
DIRECT LL L
(PV) SUMMATION
ACTION
RSP / LSP
(TPH)
W
LOW (MKCal/Hr)
(TPH)
SELECTION (%) (PV) (b)
(TPH)
BOILER DEMAND (%) REVERSE TOTAL SA AIR FLOW
ACTION LSP (TPH)
TOTAL PA + SA
< AIR FLOW
(%)
(%)
BOILER DEMAND
TOTAL PA FLOW TOTAL START-UP / LOAD
BURNER AIR FLOW
(TPH) (TPH)
< MIN. SA TO OFA AIR FLOW
* TPH
(TPH)
0.162
FL/FC
(TPH)
(TPH) RSP /LSP
OIL FLOW CONTROL VALVE
(MIN) PA FLOW
(TPH)
*< >
TPH
(TPH)
TOTAL PA / SA
SUCTION
AIR FLOW (LSP) REVERSE (%)
FF SIGNAL ACTION
F/F DIRECT RSP /LSP
ACTION
REVERSE (%)
REFER ACTION
INTERLOCK
TABLE
*
A A
M M
1) 100% OF TOTAL PA + SA SUCTION AIR FLOW IS EQUIVALENT TO 620 TPH. TAG NO. CLAUSE ACTION ON FIC
2) 100% (SOLID FUEL) HEAT RELEASE TO EQUIVALENT 0 TO 250 MKCal/Hr.
1. TAH-101 & 102 `U' BEAM TEMP. HIGH RUN BACK ISSUED TO FUEL FEEDER 10% AT THAT INSTANT (THIS 10% TO BE SET AT SITE)
3) VALUES ARE TENTATIVE SAME SHALL BE FINE TUNED AT SITE DURING COMMISSIONING.
* SUPER HEATER
ON DELAY 5 MINUTES - TRIP DCF.
2. - ON DELAY 2 MINUTES - RUN BACK ISSUED TO ALL DRAG CHAIN TO LOWER RPM 10%
PROTECTION
ABREVIATIONS:- EVEN IF CONDITION RESET IT WILL START COMMAND FROM 10%
SP - SET POINT 3. TAHH-101 & 102 'U' BEAM TEMP. HIGH HIGH TRIP DCF
PV - PROCESS VERIABLE
4. TAH-100 BED TEMP. HIGH RUN BACK ISSUED TO FUEL FEEDER 10% AT THAT INSTANT (THIS 10% TO BE SET AT SITE)
RSP - REMOTE SET POINT
TPH - TON PER HOUR 5. TAHH-100 BED TEMP. VERY HIGH TRIP DCF
0-1
COAL FIRING % TO
COMB. CONTROL
BFG
LOADING
STATION
PV REVERSE
ACTION BFG LOAD BURNER-H
AIR FLOW FIC FIRING ON
RSP RSP
PV PV
REVERSE REVERSE
W
ACTION ACTION
SJG 19.10.2022
FC
RAJ/AEP 19.10.2022
FL/FC FL/FC
BFG FLOW CONTROL VALVE
AIR FLOW DAMPER FOR AIR FLOW DAMPER FOR PNC 19.10.2022
BFG LOAD BURNER BFG LOAD BURNER CONTROL SCHEMATIC DIAGRAM
(RHS) (LHS)
FOR COMBUSTION CONTROL
(BFG FIRING) D64-3CF-509071 0
SHEET NO. - 3A
BED TEMPERATURE BED TEMPERATURE BED TEMPERATURE
HH HH HH HH HH HH HH HH HH
H H H H H H H H H
L L L L L L L L L
LL LL LL LL LL LL LL LL LL
w
n n n
w
n
FUEL SELECTION
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FOR BED TEMP. CONTROL
D64-3CF-509071 0
MDC SCREW FEEDERS
SHEET NO. - 4
N O T E S :-
LOWER TO MIDDELE
FURNACE SHAFT LEVEL 1) WHEN D P GOES ABOVE HIGH VALUE SET AT DPIC-100 THE SELECTED ASH COOLER
SEQUENCE SHALL BE STARTED. REFER ASH COOLER LOGIC DRAWING FOR THE SEQUENCE OF
ASH COOLER OPERATION.
2) WHEN DIFFERENTIAL PRESSURE GOES BELOW SET POINT, SET AT DPIC-100 THE BED DRAINING TO ASH COOLER
SHALL STOP AFTER COMPLETING THE CYCLE.
3) OPERATOR TO SELECT, ASH COOLER 1 TO 4 OPERATION THROUGH ASH COOLER SELECTOR SWITCH. FOR
DETAILS, PLEASE REFER ASH COOLER LOGIC & WRITE UP (D61-3CF-509070) & (D61-CF-CS-216450).
4) * REFER CONTROL SCHEMATIC WRITE UP - D64-CF-CS-216451.
H H
L L
AVG.
STEAM FLOW
FROM SHT- 6
(RSP) ON OFF
FUEL SELECTION HIGH S.P CONTROL
(NOTE-2)
(NOTE-3)
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FOR BED LEVEL CONTROL
D64-3CF-509071 0
SHEET NO. - 5
H
w
L
n NOTES
1)
* L.S.P. SHALL BE SAME FOR BOTH CONTROLLER i.e LIC's
2) HIC O/P SHALL BE INVERTED TO MATCH OPERATOR COMMAND
STEAM DRUM AND CONTROL VALVE POSITION, SINCE CONTROL VALVE IS AIR TO CLOSE TYPE.
PRESSURE
SUPER HEATERS/ MAIN STEAM
ATTEMPERATORS
STEAM DRUM
w
n
L L L
1oo2
1E MEDIAN 3E
PV PV
* L.S.P. L.S.P.
*
REVERSE REVERSE
2oo3
ACTION ACTION
COMPENSATED
a STEAM FLOW
I TO SHT NO.- 4,8,9,28
b COMPENSATED STEAM
W
REVERSE
ACTION
w
n
FEED WATER
FL/FO (100%)
FL/FO (30%)
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FOR DRUM LEVEL CONTROL
FL/FO (100%)
D64-3CF-509071 0
SHEET NO. - 6
N O T E S :-
L PI-600
FROM SHT-6
W
R.S.P a = b+c c 5Kg/cm2
*
REVERSE
ACTION
A A
M M
50-100% 50-100%
VFD VFD
002 001
BFWP-2 BFWP-1
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
BFWP DISCHARGE PRESSURE CONTROL
D64-3CF-509071 0
SHEET NO. - 7
ATTEMP.-1 N O T E :-
1) REFER CONTROL SCHEMATIC WRITE-UP - D64-CF-CS-216451.
(TC) (TC) STEAM FROM BOILER FOR VARIABLE SETPOINT TABLE.
PSH-2 2) HIC O/P SHALL BE INVERTED TO MATCH OPERATOR COMMAND AND
CONTROL VALVE POSITION, SINCE CONTROL VALVE IS AIR TO CLOSE TYPE.
COMPENSATED
STEAM FLOW
FROM SHT NO.-6
PV
SPRAY WATER
FL/FO
ATTEMPERATOR-1 SPRAY WATER CV
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
STEAM TEMP. CONTROL
D64-3CF-509071 0
SHEET NO. - 8
ATTEMP.-2
FINAL STEAM N O T E :-
(TC) (TC) (TC) STEAM FROM BOILER 1) REFER CONTROL SCHEMATIC WRITE-UP - D64-CF-CS-216451.
SSH FOR VARIABLE SETPOINT TABLE.
2) HIC O/P SHALL BE INVERTED TO MATCH OPERATOR COMMAND AND
CONTROL VALVE POSITION, SINCE CONTROL VALVE IS AIR TO CLOSE TYPE.
COMPENSATED
w
STEAM FLOW
n FROM SHT NO.-6
L H R.S.P
FEED FORWARD
DIRECT
ACTION L
DIRECT REFER NOTE-1
ACTION
SPRAY WATER
FL/FO
ATTEMPERATOR CV - 2
JSW-BHUSHAN POWER & STEEL LIMITED
N.A.
PROJECT NO. - PC0681
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FINAL STEAM TEMP. CONTROL
D64-3CF-509071 0
SHEET NO. - 9
N O T E S :-
FURNACE 1)
* VALUES MENTIONED ARE TENTATIVE, SAME SHALL BE FINE TUNED DURING COMMISSIONING
2) REFER CONTROL SCHEMATIC WRITE-UP - D64-CF-CS-216451.
MEDIAN TO SHT-10
2oo3
(-50mmWC)
*
/L
(50mmWC)
H/
*
w
ACTION AIR FLOW
A A A A
M M M M
w
n n
w
n
PA FAN TRIP
(TO DRIVE LOGIC)
FUEL SELECTION
w
n STEAM FLOW
FROM SHT. NO.-6
R.S.P
L.S.P
REVERSE
ACTION
FUEL SELECTION
(NOTE-1&2)
STEAM FLOW
FROM SHT. NO.-6
*
R.S.P
L.S.P
REVERSE
ACTION
(NOTE-1&2)
A A A A
M M M M
*
A A A A
M M M M
(FL/FC) (FL/FC)
PA FAN-A PA FAN-B
SUCTION DAMPER SUCTION DAMPER
SJG 19.10.2022
(FL/FC) (FL/FC)
RAJ/AEP 19.10.2022
SA FAN-A SA FAN-B
SUCTION DAMPER SUCTION DAMPER
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
SA/PA APH OUTLET PRESSURE CONTROL
D64-3CF-509071 0
SHEET NO. - 11
TO SILENCER
FC
START UP VENT CONTROL VALVE
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
START UP VENT
D64-3CF-509071 0
SHEET NO. - 12
U BEAM TEMPERATURES
HH HH HH HH HH HH HH HH
H H H H H H H H
w
n
HH
H
HH/
AVERAGE U BEAM
TEMP. (RHS)
H/
TO SHEET.16,28
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
U BEAM MONITORING (RHS)
D64-3CF-509071 0
SHEET NO. - 13
U BEAM TEMPERATURES
HH HH HH HH HH HH HH HH
H H H H H H H H
w
n
HH
H
HH/
AVERAGE U BEAM
TEMP. (LHS)
H/
TO SHEET.16,28
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
U BEAM MONITORING (LHS)
D64-3CF-509071 0
SHEET NO. - 14
H/
H/
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
U BEAM MONITORING
(HIGH ALARM) D64-3CF-509071 0
SHEET NO. - 15
w
n
HH/
HH/
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
U BEAM MONITORING
(HIGH HIGH ALARM) D64-3CF-509071 0
SHEET NO. - 16
BED TEMP. VERY HIGH
RUN BACK ON
SJG 19.10.2022
BED TEMP.
COAL FEEDER
RAJ/AEP 19.10.2022
TO SHEET- 3
(INTERLOCK TABLE) PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
BED TEMP.MONITORING
D64-3CF-509071 0
SHEET NO. - 17
FIELD DCS FIELD
FC (ENERGIZE TO OPEN)
COMMAND GIVEN PURGE SHUT OFF VALVE
BUT VALVE NOT OPENED FOR FURNACE INSTRUMENTS
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FOR SHAFT LEVEL DP TRANSMITTER
PURGING
D64-3CF-509071 0
SHEET NO. - 18
FIELD DCS FIELD
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
CO EVACUATION LOGIC
D64-3CF-509071 0
SHEET NO. - 19
FIELD DCS FIELD
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
CO EVACUATION LOGIC
D64-3CF-509071 0
SHEET NO. - 19A
LSP LSP
REVERCE REVERCE
ACTION ACTION
FC (ENERGIZE TO OPEN)
MDC (LHS) HOPPER-1 BYPASS KGV
FC (ENERGIZE TO OPEN)
MDC (LHS) HOPPER-2 BYPASS KGV
FC (ENERGIZE TO OPEN)
MDC (RHS) HOPPER-1 BYPASS KGV
FC (ENERGIZE TO OPEN)
MDC (RHS) HOPPER-2 BYPASS KGV
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
MDC BYPASS KGV LOGIC
D64-3CF-509071 0
SHEET NO. - 21
FIELD DCS FIELD
FO (ENERGIZE TO CLOSE)
DCF-1 DISCHARGE KGV
FO (ENERGIZE TO CLOSE)
DCF-2 DISCHARGE KGV
FO (ENERGIZE TO CLOSE)
DCF-2 DISCHARGE KGV
FO (ENERGIZE TO CLOSE)
DCF-2 DISCHARGE KGV
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
DCF DISCHARGE KGV LOGIC
D64-3CF-509071 0
SHEET NO. - 22
JSW-BHUSHAN POWER & STEEL LIMITED
N.A.
PROJECT NO. - PC0681
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FAN/PUMP TEMPERATURE LOGIC
D64-3CF-509071 0
SHEET NO. - 23
BLANK SHEET
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
BLANK SHEET
D64-3CF-509071 0
SHEET NO. - 24
BLANK SHEET
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
BLANK SHEET
D64-3CF-509071 0
SHEET NO. - 25
FIELD DCS FIELD
FC (ENERGIZE TO OPEN)
WINDBOX STEAM PURGE
SHUT OFF VALVE-1
FC (ENERGIZE TO OPEN)
WINDBOX STEAM PURGE
SHUT OFF VALVE-2
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
WIND BOX STEAM PURGING
D64-3CF-509071 0
SHEET NO. - 26
FIELD DCS FIELD
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
WIND BOX STEAM PURGING
D64-3CF-509071 0
SHEET NO. - 27
FIELD DCS FIELD
*
*
#
DEAERATOR
H H
L L
AVERAGE
REFER NOTE-1
PV
L.S.P. I
REVERSE
ACTION
REFER NOTE-1
TO DRIVE LOGIC
(BFWP MOTOR TRIP)
FC (ENERGIES TO OPEN)
(FL/FO) DEAERATOR OVER FLOW
DEAERATOR LEVEL. C V. SHUT OFF VALVE
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
DEAERATOR LEVEL CONTROL
D64-3CF-509071 0
SHEET NO. - 29
BLANK SHEET
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
BLANK SHEET
D64-3CF-509071 0
SHEET NO. - 30
REVERSE
ACTION
A A A A
M M M M
FORCE OPEN FORCE OPEN FORCE OPEN A A
FORCE CLOSE M M
FORCE OPEN FORCE OPEN
a a
b=100-a b=100-a
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
ESP I/L FLUE GAS TEMPERATURE CONTROL
D64-3CF-509071 0
SHEET NO. - 31
FIELD DCS FIELD
SJG 19.10.2022
NOTES:- RAJ/AEP 19.10.2022
1) OPEN & CLOSE COMMAND FAILURE ALARM SHALL BE GENERATED IN DCS. PNC 19.10.2022
2) ALARMS SHALL BE GENERATED IF COMMAND IS GIVEN AND THE DAMPERS HAVEN'T CONTROL SCHEMATIC DIAGRAM
ACHIEVED THE DESIRED POSITION. APH INLET & BYPASS DAMPERS LOGIC
D64-3CF-509071 0
SHEET NO. - 32
JSW-BHUSHAN POWER & STEEL LIMITED
N.A.
PROJECT NO. - PC0681
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
FAN DISCHARGE DAMPER LOGIC
D64-3CF-509071 0
SHEET NO. - 33
JSW-BHUSHAN POWER & STEEL LIMITED
N.A.
PROJECT NO. - PC0681
FO
CBD TANK DRAIN LEVEL
ON-OFF VALVE
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
CBD TANK LEVEL CONTROL
D64-3CF-509071 0
SHEET NO. - 34
BFG DUCT
REVERSE
ACTION
(FC)
BFG PRESSURE CONTROL VALVE
JSW-BHUSHAN POWER & STEEL LIMITED
N.A.
PROJECT NO. - PC0681
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
BFG PRESSURE CONTROL
D64-3CF-509071 0
SHEET NO. - 35
N O T E :-
1) PIC O/P SHALL BE INVERTED TO MATCH OPERATOR COMMAND AND
CONTROL VALVE POSITION, SINCE CONTROL VALVE IS AIR TO CLOSE TYPE.
LDO LINE
DIRECT
ACTION
FO
LDO RETURN CONTROL VALVE
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
LDO TANK OIL RETURN CONTROL
D64-3CF-509071 0
SHEET NO. - 36
N O T E :-
1) PIC O/P SHALL BE INVERTED TO MATCH OPERATOR COMMAND AND
CONTROL VALVE POSITION, SINCE CONTROL VALVE IS AIR TO CLOSE TYPE.
BAC INLET HEADER
REVERSE
ACTION
SJG 19.10.2022
RAJ/AEP 19.10.2022
PNC 19.10.2022
CONTROL SCHEMATIC DIAGRAM
BED ASH COOLER INLET PRESSURE CONTROL
D64-3CF-509071 0
SHEET NO. - 37