Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LOCATI LOCATI

TYPE OF DESCRIPTION OF GRADE OF QUANTI


SR.N. DATE ON/ STR ON/ STR SIDE PLANT LOCATION
STRUCTURE ACTIVITIES CONCRETE TY (M3)
FROM TO
1 28-Jun-24 392+813 392+823 RHS RETAINING WALL RAFT M30 RCC 5.00 392+300 LHS
2 28-Jun-24 388+400 VIADUCT GIRDER BED PCC M15 PCC 3.50 392+300 LHS
3 28-Jun-24 394+560 LHS FLYOVER A1 PIER CAP M35 RCC 24.00 392+300 LHS
4 28-Jun-24 397+028 397+038 LHS DRAIN RAFT M30 RCC 4.80 392+300 LHS
5 28-Jun-24 395+234 395+219 RHS RETAINING WALL WALL M30 RCC 5.50 392+300 LHS
6 28-Jun-24 388+600 RHS VIADUCT PSC GIRDER P20-P21 IG-02 M55 PSC 42.50 392+300 LHS
7 28-Jun-24 393+500 LHS LVUP RCC GIRDER A1-A2 OG-02 M40 RCC 18.50 392+300 LHS
8 28-Jun-24 395+202 395+214 RHS RETAINING WALL RAFT M30 RCC 4.50 392+300 LHS
9 28-Jun-24 395+800 FLYOVER GIRDER BED PCC M15 PCC 2.30 392+300 LHS
10 28-Jun-24 369+600 PATCH WORK DIVERSION MAINTENANCE DLC 8.00 384+600 RHS PERINJANAM
11 28-Jun-24 379+040 380+100 PATCH WORK DIVERSION MAINTENANCE DLC 384+600 RHS PERINJANAM
12 28-Jun-24 381+762 381+768 LHS DRAIN WALL M30 RCC 7.60 384+600 RHS PERINJANAM
13 28-Jun-24 379+980 379+988 LHS DRAIN RAFT M30 RCC 384+600 RHS PERINJANAM
14 28-Jun-24 381+790 DRAIN PRECAST SLAB (NOS-02) M30 RCC 384+600 RHS PERINJANAM
15 28-Jun-24 372+785 372+790 LHS DRAIN WALL M30 RCC 1.70 384+600 RHS PERINJANAM
16 28-Jun-24 389+465 LHS VIADUCT CROSS GIRDER P14-P15 M40 RCC 7.50 384+600 RHS PERINJANAM
17 28-Jun-24 370+750 370+759 LHS DRAIN SLAB M30 RCC 3.00 384+600 RHS PERINJANAM
18 28-Jun-24 370+759 370+767 LHS DRAIN WALL M30 RCC 2.50 384+600 RHS PERINJANAM
19 28-Jun-24 388+400 VIADUCT GIRDER BED PCC M15 PCC 3.50 384+600 RHS PERINJANAM
20 28-Jun-24 386+600 REPANEL REPANEL CASTING M35 REPANEL 13.80 384+600 RHS PERINJANAM
21 28-Jun-24 372+838 LHS LVUP CROSS GIRDER M40 RCC 7.50 384+600 RHS PERINJANAM
Total 165.70

You might also like