Professional Documents
Culture Documents
Ingles para Defesa
Ingles para Defesa
Ingles para Defesa
The consctruction of masonry wall is the stage in which survey of a property begins.
First – bring the alignment material close to the location where the alignment will be
carried out;
Second- wet the alignment site if it a ground or floor before doing the alignment;
Third – plumb and level the blocks at the ends of the wall to be raised;
Fourth- stretch the alignment thread;
Fifth – put the Mortar on the wet floor and proced with the alignment;
Sixth – fill the joints and remove the mortar that comes out from the sides and under the
blocks
3- Under what conditions can be stonemason work?
4- What should the technical know to be able to cary out this activity?
Be proficient in handling tool such as: bubble level, hose level, trowel, clow hummer, plumb
line, chisel.
Conclusion
This activity is important becouse gives the aesthetic to the building, acoustic isolation, thermal
comfort