WEATHER: AM:
PM:
MANPOWER: EQUIPMENT:
- Project Engineer - One Bagger - Jack Hammer
- Foreman - Elf Truck -
- Skilled Worker - Backhoe -
- Laborer - Water Truck -
- Safety Officer - Dumptruck -
- First Aider - Concrete Cutter -
- Operator - Bar Cutter
- - Tamping Machine
- - Cut Off Machine
- - Welding Machine
ACTIVITIES
VISITORS:
VISITORS: VISITORS:
Engr. Michael Jofred P. Doria Albert Solas Engr. Michael Jofred P. Doria Albert Solas
Site Engineer Contractors Project Engineer Site Engineer Contractors Project Engineer
PROJECT TITLE: Construction of New Mayor's Office and Executive Hall
WEATHER: AM:
PM:
MANPOWER: EQUIPMENT:
- Project Engineer - One Bagger - Jack Hammer
- Foreman - Elf Truck - Cut Off Machine
- Skilled Worker - Backhoe - Welding Machine
- Laborer - Water Truck -
- Safety Officer - Dumptruck -
- First Aider - Concrete Cutter -
- Operator - Bar Cutter
- - Tamping Machine
ACTIVITIES
VISITORS:
PREPARED BY:
SITE ENGINEER
WEATHER: AM:
PM:
MANPOWER: EQUIPMENT:
- Project Engineer - One Bagger - Jack Hammer
- Foreman - Elf Truck - Cut Off Machine
- Skilled Worker - Backhoe - Welding Machine
- Laborer - Water Truck -
- Safety Officer - Dumptruck -
- First Aider - Concrete Cutter -
- Operator - Bar Cutter
- - Tamping Machine
ACTIVITIES
VISITORS:
PREPARED BY:
Project Manager
FABRICATION AND
INSTALLATION OF 300
UNITS SOLAR STREET
LIGHTS WITH POST
Along Romulo Highway, Santa Ignacia, Tarlac
LOG BOOK
CONSTRUCTION AND
IMPROVEMENT OF
DRAINAGE SYSTEM ALONG
OLD SLAUGHTERHOUSE
ROAD AND ROAD #12,BRGY.
POB WEST
Old Slaughterhouse Road and Road #12, Brgy. Pob. West,
Santa Ignacia, Tarlac
LOG BOOK