Professional Documents
Culture Documents
Certificate Donnage MB
Certificate Donnage MB
TREATMENT DETAILS
Date fumigation completed : JUNE 30, 2024 Place of fumigation : AT WORKSHOP
AQIS prescribed dose rate(g/m3) : 48 GRAM / M3 Exposure period (hrs) : 24 HOURS
Forecast minimum temp (oc) : 240 Applied dose rate (g/m3) : 48 GRAM/ M3
How was the fumigation conducted? ☒ Stack under sheet
☐ Container/s under sheet
☐ Permanent Chamber
Container number/s (where applicable) : LCL ☐ Pressure tested container/s
Vessel : MV. OCEANUS 2402107
Does the target of the fumigation conform to the AQIS plastic wrapping, ☒ Yes ☐ NO
impervious surface and timber thickness requirements at the time of fumigation?
Ventilation Final TLV reading (ppm) : -- (not required for Stack or Permanent Chamber fumigations)
DECLARATION
By signing below, I, the AFAS accredited fumigator responsible, declare that these details are true and correct and the fumigation has been can-ied
out in accordance with all the requirements in the AQIS Methyl Bromide
Fumigation Standard
ADDITIONAL DECLARATIONS
The fumigation treatment only for wocxien packaging none other materials. The Fumigation Treatmenlt has no residual effect to prevent
reinfestation of common insect, therefore we can offer no guarantee in this respect.
This certificate refers to fumigation only and does not deal with any matter and is issued without prejudice.
Signature,
Jakarta, June 30, 2024
F0057MB
(Yudi. A) AFAS Accreditation Number Company Stamp
ATTACHMENT