Professional Documents
Culture Documents
Erp Seol
Erp Seol
Copy Distribution to
Office of the Honorable Managing Director Project Site Administration Department
Office of the Chief Business Officer Project Office
Security Office Project site EHS Department
Facility/Plant Manager Office QA/QC, Production, Maintenance Department
This instruction is the property of SAMUDA EDIBLE OIL LIMITED and is furnished only for the purpose indicated. Possession of
this material does not convey any permission to reproduce this material, in whole or in part, or manufacture the subject matter
shown therein, or use the confidential or proprietary information thereon. Please contact with CBO via EHS Department.
Message from the Honorable Managing Director
This Emergency Response Plan (ERP) Manual describes the measures that are essential for various emergency
situation or condition surfaces due to activities and processes of Samuda Edible Oil Limited (SEOL), in orderto
comply with the requirements of the Safety Management. This manual will ensure prevention of injuries and ill-
health, compliance with applicable legal and other requirements, and continual improvement of ERP performance
of SEOL.
I hereby instruct all the employees of SEOL to follow the measures stipulated in this ERP Manual while executing
related tasks and to actively co-operate and contribute in realizing the set OHSMS objectives.
This journey calls for up-gradation and adoption of new and emerging techniques and practices in EHS
Management. In this endeavor, adopting tools and methods to study and analyze challenges and resolve them for
continual improvement of the EHS Management System is an imperative. Involving cross-functional teams to
address the day-to-day activities will enrich the organization as a whole and benefit individually in enhancing
professional performance of each employee of SEOL.
Let us move forward with a comprehensive EHS Management System with a commitment to improve EHS
performance for the betterment of all the employees and interested parties of SEOL.
Shiblee Sir
Managing Director
Samuda Group of Companies
Samuda Edible Oil Limited (SEOL) and newly established company under the flagship SAMUDA Group. The group is
currently in process of establishing a state-of-the-art edible oil refinery at Bangabhundhu Sheikh Mujib Shilpa
Nagor, Zone-16, Mirsarai, Chattogram. The Group already acquired 80 acres of land the Edible oil project is
ongoing in full swing and it will come under commercial operation within September, 2024. A investment of USD
100 million is estimated and the current workforce requirement is more than 100 and during service it estimated
to have 100+ manpower working opportunity.
OBJECTIVES
The aim of the ERP is to provide procedures and action plans to promote an effective response when faced with
an emergency situation. The major objectives of this ERP include but not limited to:
Identifying potential emergency situations, incidents that can cause illness or injury to human including
the environment.
Provide a guide for the preparedness and response to handle emergency situations.
Propose mitigation for associated adverse environmental impacts or impact to human and
prevention of accident.
Highlight the requirements for system review, revise and test emergency preparedness and response
procedures where applicable.
EMERGENCY CONCEPT
Emergency situation do occur. It is every employee’s responsibility to be prepared for these events. Being
prepared includes all of those activities that are done on a regular basis to ensure that:
The emergency procedures for the proposed Project emergency in relation to all kind of EHS (Environment,
Health and Safety) related emergency preparedness and response plan. The ERP developed based on the
requirements or general intent of all relevant legal requirements which amongst others include:
In the specific project case the following are deemed to be emergency cases identified and corresponding guilde to
address them is being developed
Fire, Explosion, Oil Spillage, Snake bite, Storm, Earthquake, Electrical Shock & Heat Stroke
ERT is the internal team to be at fore front handling the emergency situation and they should be trained in fire-
fighting, first aid and other related aspects to make sure they are well equipped to execute the ERP procedures in
the event of emergencies.
The proposed ERT for the Project is conceptually presented in Figure-1. The roles of the ERT include:
To control or limit any effect that an emergency or potential emergency may have onsite or on
neighboring areas;
To facilitate emergency response and to provide such assistance on the site as is appropriate to the
occasion;
To provide a communication channel with local, regional and national emergency response
networks;
To ensure timely communication of all vital information;
To facilitate the reorganization and reconstruction activities so that normal operations can be resumed;
To provide training so that a high level of emergency preparedness can be continuously
maintained; and
To provide a basis for updating and reviewing emergency procedures.
Admin In-Charge
Call for fire service, Ambulance, Hospitals, National Emergency Service as appropriate
Notify local authority and corporate personnel for approvals and guidelines
Support in arrangement of resources in terms quick of approvals, finance etc.
Notify all departments or facility within the same premises for caution
ERT Members
Perform front-line Damage Control actions as directed by the EHS Coordinator;
Work as a team to ensure safety of colleagues. Administer first aid when required;
Evacuation the place/area or plant depending on situation and as per the guideline of EHS Coordinator;
and
Maintain communications with EHS Coordinator.
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No. 01 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00 ERT
Date: 1-JUL-2024 Fire Alarm
FIRE HAZARD Acceptable Risk
Dept: Project Fire Extinguisher
Under Control
Location: RF & DF Fire Hydrant
S L Risk Evacuation S L Risk
5 2 10 First Aid 4 2 8
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No.02 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00
Date: 1-JUL-2024 ERT
CHEMICAL/OIL SPLLIAGE Acceptable Risk
Dept: Project First Aid
Under Control
Location: RF & DF PPE
S L Risk Awareness S L Risk
1 4 4 1 3 3
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No.02 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00 Awareness
Date: 1-JUL-2024 ERT
STRUCTURAL COLLASPE Acceptable Risk
Dept: Project First Aid
Under Control
Location: RF & DF PPE
S L Risk Vetted Str. Design S L Risk
5 1 4 Annual Inspection 3 1 3
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No.02 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00
Date: 1-JUL-2024 Awareness
ELECTRICAL SHOCK/HAZARD ERT Acceptable Risk
Dept: Project
First Aid Under Control
Location: RF & DF
PPE
S L Risk S L Risk
5 3 15 3 3 9
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No.02 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00 Awareness
Date: 1-JUL-2024 ERT
HEAT STROKE Acceptable Risk
Dept: Project First Aid
Under Control
Location: RF & DF Adequate Air
S L Risk circulation S L Risk
3 3 9 Drinking Water 3 2 6
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No.02 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00
Date: 1-JUL-2024 Awareness
EARTHQUAKE ERT Acceptable Risk
Dept: Project
First Aid Under Control
Location: RF & DF
Evacuation
S L Risk S L Risk
5 2 10 3 2 6
Hazard and Risk Rating without Existing Protection Hazard and Risk Rating with
Sl. No.02 Control Measures & Deadline
considering any Protection(S x L) = R Available Existing Protection (S x L = R)
HIRA Revision: 00
Date: 1-JUL-2024 Awareness
STORM ERT Acceptable Risk
Dept: Project
First Aid Under Control
Location: RF & DF
PPE
S L Risk S L Risk
3 3 9 2 3 6
EVACUATION PLAN
Evacuation of personnel from a specific area of the facility maybe needed during emergency. Therefore, it is
important to acquaint all personnel with the basic procedures to follow. This will ensure a safe, efficient and
orderly withdrawal. The EHS Coordinator will decide when to evacuate the site.
An exit route is a continuous and unobstructed path of exit travel from any point within a workplace to a place of
safety. An exit route consists of three parts:
Responsibility:
1. For any emergency situation the EHS Coordinator would decide the requirement for full evacuation
2. The ERT will alert or warn the members and other cross functional team
3. ERT also inform Project head, security and Cross functional team
4. Security is responsible for head count and arrangement of necessary logistics support
5. Admin is responsible for outside communication by discussiog with Project or facility head.
Procedure of Evacuation:
1. Stop all activities immediately and switch off the device or machinery or process.
2. Assess that all persons can evacuate the area, including individuals with mobility limitations, have
evacuated their area.
3. Follow EXIT signs to the nearest safe exit. Do not use elevators.
4. Allow others to enter the stairwell. As approach the landing of each floor, allow evacuees from that level
to enter the stairwell.
5. Steer clear of hazards. If evacuation becomes difficult via a chosen route, because of smoke, flames or
blockage, re-enter the facility on a safe floor. Continue evacuation via the nearest safe exit route.
6. Move away from the building. Away from the building and exit doors. Proceed to your Evacuation
Assembly Area.
7. Do not re-enter the building without an “all clear”. Do not, under any circumstances, re-enter the facility
unless declared safe,
8. The ERT will seek for personnel weather unable to get out
Fire hazards are workplace hazards that either involve the presence of an open flame, increase the probability
that an uncontrolled fire will occur, or increase the severity of a fire should one occur.
Responsibility:
1. Department members and ERT member will notify ASAP
2. The EHS Coordinator will take necessary measures by discussing with Project/facility head
3. Admin and security for external communication, arrangement of logistics etc.
Procedure:
1. If fire break out then immediately alert by pressing FIRE ALARM or by shouting FIRE FIRE
2. Switch off or shut down the electrical breakers, gas valves etc.
3. If someone gets injured, immediately bring him/her to the Assembly point
4. ERT will give First Aid to the effected personnel
5. Follow the Evacuation procedure mentioned above
6. ERT will try to extinguish the fire with extinguishers
7. In case of critical situation discuss with Project/Facility head and take appropriate action by
calling national emergency service (999) or fire brigade