Rancangan Anggaran Biaya

SEKSI PERLENGKAPAN

NO NAMA BARANG JUMLAH SATUAN HARGA JUMLAH


1 Sound System 1 Set 5 Hari 1,500,000 7,500,000
2 HT 30 Buah - -
3 Alat Musik 1 Set 1 Hari - -
4 Terpal Besar 8 / 6 meter 6 Buah 700,000 4,200,000
5 Lampu Biasa 35 Watt 10 Buah 60,000 600,000
6 Lampu Sorot 10 Watt 5 Buah 250,000 2,500,000
7 Kabel 3 / 2,5 inchi 2 Roll 1,700,000 3,400,000
8 Vitting Lampu 10 Buah 35,000 350,000
9 Kepala Cok 10 Buah 20,000 200,000
10 Genset 5 Kpa 1 Buah 6,000,000 6,000,000
11 Kursi 800 Buah 2,000 1,600,000
12 Tenda besar 5 Buah/Hari 250,000 1,250,000
13 Cat air ember besar 5 Buah 400,000 2,000,000
14 Cat Minyak 5 Buah 110,000 550,000
15 Tiner 2 Buah 60,000 120,000
16 Kuas Roll Kecil 5 Buah 25,000 125,000
17 Kuas Roll Besar 5 Buah 35,000 175,000
18 Kuas Tangan 2,5 inci 5 Buah 10,000 50,000
19 Kuas Tangan 1,5 inci 5 Buah 5,000 25,000
20 Wadah Cat 5 Buah 30,000 150,000
21 Tali Rafia 2 Roll 20,000 40,000
22 Tali Jemuran kecil 20 Meter 3,000 60,000
23 BBM Pertamaks 200 Liter 17,000 3,400,000
24
25
26
27
28
29
30 TOTAL 34,295,000