BUDGET: HOME LIMA OCTOBER 25, 2011

CONSTRUCTION SITE: HOUSE BATHROOM REMODELING


DEPARTURE: WET WORK
CUSTOMER: EULOGIO HUAYTA PARI
ATTENTION: ING. MADELEINE HUAYTA GARCIA
ADDRESS: AV. VICTOR ALZAMORA 396 DEPARTMENT 303 URB. SURQUILLO MEDICAL NEIGHBORHOOD
BATHROOM REMODELING
LABOR BUDGET

No. 1 DESCRIPTION You MEASUREM PRICE TOTAL


ENT
1.00 Disassembly and Demolitions 1,469.80
1.01 Removal of existing majolica (manual) m² 13.50 25.00 337.50
1.02 Removal of existing floor (manual) m² 7.50 37.64 282.30
1.03 Disassembly of existing bathroom accessories glb 1.00 100.00 100.00
Chipping and patching of the wall to change the iron pipe
1.04 glb 1.00 500.00 500.00
for plastic in the entire bathroom
1.05 Hauling and Disposal during the Work glb 1.00 250.00 250.00
2.00 Floors and Pavements 1,088.94

2.01 Ceramic installation on bathroom wall m² 19.00 28.81 547.39

2.02 Ceramic installation on bathroom floor m² 5.00 28.81 144.05

2.03 Installation of rodon for bathroom edges ml 6.50 15.00 97.50

2.04 Therma Installation und 1.00 300.00 300.00

3.00 Sanitary Installations and Accessories 750.00


3.01 Oval sink installation und 1.00 200.00 200.00
3.02 Toilet installation with water saving system und 1.00 250.00 250.00
3.03 Installation of faucets in shower and sink glb 1.00 150.00 150.00
3.04 Installation of accessories for towels and curtains glb 1.00 150.00 150.00
4.00 Civil Works 100.00
4.01 General Remedies glb 1.00 100.00 100.00
5.00 Others 150.00

5.01 Electrical installation in bathroom glb 1.00 150.00 150.00

DIRECT COST S/. 3,558.74


GENERAL EXPENSES AND UTILITY S/. 0.00% 0.00
SUB TOTAL S/. 3,558.74

TOTAL COST S/ 3,558.74


NOTE: The cost is for labor only.

Payment method: 70% at the beginning and is paid upon completion of the work.

Awaiting your kind approval, we remain with you.

Sincerely

BYH CONSTRUCTION