• embankment condition. • MRM will continue to be responsible for post mine closure monitoring, and maintenance of the recovery system (if required), until closure criteria have been met and it is demonstrated that recovery wells are no longer required. MRM has invested more than $10 million since 2006 to continuously improve the performance and management of the TSF. MRM is committed to reducing the off-site environmental risks of the TSF, as shown by the TSF commitments outlined in Section 7.
A summary of the TSF risks and contingency plans are shown in Table 2.
Table 2 TSF Risk Assessment, Mitigation Measures, and Contingency Plans
Risk Mitigation Monitoring Contingency
Surface water Runoff and decant water to flow to Regular updating of the water Pump water from Water overflow Water Management Dam. balance modelling of the site water Management Dam to Water Management Dam designed management system, to minimise other storages. to be above the 1 in 500-year flood overflow risk. Increase the capacity of level Regular inspection of the decant the Water Management Maintain a suitable freeboard before system, to ensure efficient Dam. each wet season. operation. Discharge as per All runoff and decant water in the approved discharge Water Management Dam to be licenses. reused in the processing plant, evaporated or discharged as per the discharge license. Failure of TSF Design in accordance with ANCOLD Regular inspection of embankment Engineered remediation embankment guidelines for high hazard dams. integrity to be undertaken. measures in accordance Engineering analysis of embankment Monthly piezometric monitoring of with ANCOLD stability has confirmed a factor of phreatic surface levels within guidelines. safety well in excess of minimum embankment. requirements. Independent annual inspections. Erosion of Only hard durable NAF rock that is Regular inspection of rock face Replace any rocks outer face of resistant to erosion is to be used on integrity to be undertaken. showing signs of erosion TSF outer face. with more competent embankment material. Seepage from Embankment has clay core with cut- Ongoing monitoring of seepage Increase the number or TSF off key. rates through recovery bores and pumping rate of Ponded water in TSF kept away from observation bores. recovery bores. perimeter embankment. Monthly inspection of Install seepage collection Geopolymer barrier installed around embankment for evidence of trenches. eastern embankment. seepage. Network of recovery bores installed in identified seepage areas. TSF to be capped with low permeability layer, to prevent ongoing entry of water at closure. Maintain recovery bores post closure (if required), until seepage head in TSF reaches design level.