MECHANICAL ENGINEERING DESIGN

PROJECT HEAT EXCHANGER PADA PT


NEOSIA TRAINING CENTER METODE
REVERS ENGINEERING
1stArokib Darjat Saputra 2ndFuat Faturrohman Fauzi
Program Studi Teknik Industri, Fakultas Teknik Program Studi Teknik Industri, Fakultas Teknik
Universitas Dian Nuswantoro Universitas Dian Nuswantoro
512202001446@mhs.dinus.ac.id 512202001470@mhs.dinus.ac.id

ABSTRACT engineering is the traditional process that goes from


Neosia Training Center is an Education and Training Institute logical design to the physical implementation of a system.
that has been established since 2009 and is here to fill the void in
In some situations, it is possible that there are products or
the scarcity of Engineering Software training programs. In the
parts that do not have technical details, such as drawings,
Neosia Training Center training there are many work projects
bill-of-materials, or without engineering data. The process
and assignments to train skills in the world of Engineering
of duplicating an existing part, subassembly, product
Software, for the projects there are 9 project assignments in
AutoCAD software, 18 project assignments in Inventor software, without drawings, documentation, or computer models is
and 36 assignments in Solidworks software projects. However, called reverse engineering. Reverse engineering is also
what will be discussed in detail is the Heat Exchanger in the defined as the process of obtaining geometric models from
Solidwork software project section. The way this Heat 3-dimensional points from scanning or digitizing existing
Exchanger works is to change the temperature from hot to cold products.
or vice versa from cold to hot and it only uses a tube that
Solidwork is a CAD software made by DASSAULT
contains very many small pipes. And why do I also use
SYSTEMES used to design machining parts or machining
SolidWorks software instead of iventor, which I studied earlier at
part arrangements in the form of assembling with a 3D
campus, namely Solidworks software that is more detailed, more
complete, and faster in working on Heat Exchanger project
view to represent the part before the real part is made or a

assignments. 2D view (drawing) for machining process drawings. (Arif


Syamsudin, 2022).
Keywords : Solidwork, Heat Exchanger

II. EASE OF USE


I. INTRODUCTION
This type of research is included in descriptive research
Manufacturing is the process of turning raw materials or categorized in qualitative research methods using the
into a product. The process of converting raw materials reverse engineering method, namely the act of
into a product includes product design, material selection, disassembling an object to see how it works, this is done
and the process steps in which the product is made. In a mainly to analyze and gain knowledge about how
more modern context, manufacturing involves making something works but is often used to duplicate or enhance
products from raw materials through various processes, objects.
machines and operations, following a well-organized plan
for each required activity. (Supriyanto, Erlian, 2013). III. PREPARE YOUR PAPER BEFORE STYLING
Reverse Engineering is the process of designing,
3.1 Heat Exchanger Manufacturing Project
manufacturing, assembling and maintaining a product or
A Heat Exchanger or often we call a Heat Exchanger
system. There are two types of engineering namely
is a tool that functions to transfer heat energy between
forward engineering and reverse engineering. Forward
two or more fluids and occurs at different components by right-clicking on surface revolved,
temperatures between the fluids, where some of the clicking on insert into new, we are told to give it
fluids act as hot fluids and others act as hot fluids. my name here, using the name Shell, then Thicken
cold (cold fluids). it with a thickness of 12.7 mm.
The heat exchanger can be used as a heater  Again for the Nozzel 1 section, how to separate the
(regenerator) or as a cooler (recuperator) depending on components by right-clicking on the surface
the review of the heat transfer that occurs. In our daily revolved, clicking on insert into new, we are told
lives, we cannot be separated from this tool, both on a to give it my name here, using the name Nozzel 1,
small scale, such as: AC (Air Conditioner) and on a then Thicken it with a thickness of 10 mm.
large scale, such as: Powerplant.  To create pads N3 and N4 on the shell by making a
previous sketch with size.
 To separate the components by right-clicking on
3.2 Steps for Making Shell and Tube Heat
the surface trim part, clicking on insert into new
Exchanger Engineering with Solidwork 2022
part, later they are told to give it my name here
Making Shell and Tube Heat Exchangers here the
using the name N4 after that it is Thicken down to
author uses several techniques in Solidwork called
10 mm.
Multibody Parts, consisting of Multibody Design
 Enter the Heat Exchanger assembly, Insert
Techniques, Feature Scope, Patterning Bodies,
Component, select the previous part N3 and N5,
Combining Bodies, Case Study, Intersect with Solid
right click on the float to make it free, then the
Bodies, Indent Feature, Deleting Solid Bodies.
origin master and the origin parts are mated one by
Making Body Shell with Surface:
one and will become a single part.
 The making of the Body Shell starts with making a
Making Nozzel Flanges, and Pipes:
sketch, following the dimensions specified in the
 To make a flange, we enter the design library,
2D drawing of the Neosia Training Center. With
routing, piping, flange, welding neck flange, select
dimensions of R99.38 mm, R567.06 mm, width
the 300-NPS8 Wneck flange.
292.30 and height 442.4 mm.Setelah sketch 2D
 To separate components by right-clicking on the
yang telah di buat yaitu dengan menggunakan
part, clicking on insert into new part, later asked to
revolved surface.
give it my name here using the name Pipe Hub
 Create the middle Body using 2D Sketch with a
Nozzel 1 after that it was Thickened to 12.65
length of 3814 mm.Setelah sketch 2D di buat
mm.Lanjut ke Flange 1, dan 2 di mate pada Pipe
selanjutnya yaitu dengan menggunakan revolved
Hub Nozzel 1 dan 2 dengan di mate, dan di edit
surface.
feature part, pilih chamber dengan ukuran 8 mm.
 Back to making a 2D sketch for the right disk with
 To make a pipe on the shell to the N3 flange, enter
the same dimensions, namely R99.38 mm,
the skeleton part, use the Sketch name convert
R567.06 mm, width 292.30 and height 442.4 mm.
intities, on the N3 sketch pad, extrude the
 Then cut between Surface to Sketch on N1 and N2
Direction Blind surface 428 mm up and in the
using Trim Surface and in Thicken 12.7 mm thick.
chamber 8 mm.
 To separate components by right-clicking on
 To take components in solidwork, select the design
surface revolved, clicking on insert into new part,
library, flanges, welding neck flange, select the
we are told to give it my name here using the name
WNeck Flange 300-NPS 4, then mate with each
Disk Right after that in Thicken with a thickness of
pipe hub.
12.7 mm.
 To take components in solidwork, select the design
 Again, in the middle of the tube, how to separate
library, flanges, welding neck flange, select the
WNeck Flange 300-SCH 600, then mate with each  To make the fixed base plate, first make a sketch
pipe hub on Flange N5, N6, and N7. like the one below, then extrude it to a thickness of
 To make the LS-01 flange, you must first make a 34 mm.
sketch with the size shown in the image below and  To make the sliding base plate, first make a sketch
extrude 10 mm thick. like the one below, then extrude it to a thickness of
 Continue in the second extrude with a diameter of 25 mm.
581.60 mm in the sketch, 4.80 mm thick comes out  Making the lifting lug part, namely first making a
with the name baffle full then cut through all. sketch on the main body, namely the shell part as
 To make the first gaskets 1 and 2, you must first in the technical drawing.
make a sketch with the size shown in the image  Making a linear pattern with a distance of 180 mm,
below, and extrude 4.80 mm thick. 3 pieces.
Making Baffle, Straight Tube, Spacer 4.2, and  Making a sketch like the one below with a
Spacer 4.1: thickness of 10 mm, and extruding it with the up to
 To make the first baffle, you must first make a surface feature.
sketch with the size of an engineering drawing.  In the first part of the saddle pad, make a sketch
 To cut and separate parts by means of extrude cut, like the one below with a circle of 132 degrees, 66
split, cut part and insert into the new part. degrees and a 330 mm surface blind.
 To make the first spacer parts 4.1 and 4.2, make a 3.3 Assembly Heat Exchanger
sketch with a diameter of 19.05 mm. For the total Heat Exchanger assembly there are
 Making the seal strips is like making other parts, 622 parts which are combined into 1 of which are
namely making a sketch like a technical drawing. Shell, Nozzel N1, N2, N3, N4, Nozzel Neck N1, N2,
 To make the sliding base plate, first make a sketch N3, N4, Reinf Pad N1, N2, N3, N4, Lifting Lug Pad ,
like the one below, then extrude it to a thickness of Lifting Lug, Base Plate Fix, Base Plate Sliding, Rib of
25 mm. Saddle, Saddle Pad, Tailing Lug, Flange LS-01,
 To separate the shell component from the lifting Flange CS-02, CS-03, CS-04, Gasket 01, 02, Baffle 01
lug pad by right clicking on the part, clicking on lower part then in the Linear Component Pattern as
insert into new part, you will be asked to give it my many as 8 pieces with a pattern spacing of 246 mm,
name here using the name lifting lug pad 1 and 2 Baffle 02 at the top, in the Linear Pattern as many as 8
because it has 2 parts after that it is thickened to pieces with a spacing of 246 mm, Spacer 4.1 there are
12.70 mm, and in the chamber 10 mm. 4 pieces, Spacer 4.2 there are 2 pieces, Straight Tube
 To separate the shell component from the lifting which totals the most, namely 498 pieces tube inside
lug by right clicking on the part, clicking on insert the Heat Excganger, there are 4 Seal Trips, Hex bolt
into new part, you will be asked to give it my name M24 x 3.0 x 130 –60C there are 22 on the right, 22 on
here using the names lifting lug 1 and 2 because it the left on the Flange LS-01, CS-02, CS-03, CS 04 and
has 2 parts after that it is thickened to 12.70 mm. finally the Hex nut M24 x 3 this is a pair with Hex bolt
10 mm thick. M24 x 3.0 x 130-60C there are 22 on the right, 22 on
 Making a linear pattern with a distance of 180 mm, the left on Flange LS-01, CS-02, CS-03, CS 04.
3 pieces.
 To cut with the split feature, that is to make a
surface on the main part, namely surface-offset 2
with an offset of 12.70 mm, and split 4 times as
shown in the technical drawing.
Manufacturing of Heat Exchanger Mounts
an advanced level in solidwork, because some of the
tools such as Surface, thicken, fill pattern, Insert into
new part, sketch, extrude, cut extrude, fillet, chamfer,
revolve, offset are basic tools in making a design. 3d.

IV. CLOSING
Conclusion
1. In working on the 3D Heat Exchanger design,
Picture 3.3 Assembly Full Heat Exchanger conclusions are obtained. The design of the Heat
Exchanger consists of 622 parts, namely Shell,
Nozzel N1, N2, N3, N4, Nozzel Neck N1, N2, N3,
3.4 Duration of Work on Making Heat Exchanger N4, Reinf Pad N1, N2, N3, N4, Lifting Lug Pad,
In working on the Heat Exchanger project, the Lifting Lug, Base Plate Fix , Base Plate Sliding,
Neosia Training Center gives a 1 week deadline for Rib of Saddle, Saddle Pad, Tailing Lug, Flange
the completion of the project. If it exceeds the LS-01, Flange CS-02, CS-03, CS-04, Gasket 01,
specified time, a consequence of a reduction in value 02, Baffle 01 at the bottom then in the Linear
will be given. For the manufacture of the Heat Component Pattern as many as 8 pieces with a
Exchanger project which consists of 622 parts, the pattern spacing of 246 mm, Baffle 02 at the top, in
author needs exactly 7 days to make all parts and Linear Pattern 8 pieces with a spacing of 246 mm,
assemblies, for more details the manufacturing time Spacer 4.1 there are 4 pieces, Spacer 4.2 there are
per part will be explained in the following table : 2 pieces, Straight Tube which is the most, namely
498 tubes inside the Heat Exchanger, Seal Trips
there are 4 pieces, Hex bolt M24 x 3.0 x 130-60C
there are 22 on the right, 22 on the left on Flange
LS-01, CS-02, CS-03, CS 04 and lastly, the Hex
nut M24 x 3 is a pair with Hex bolt M24 x 3.0 x
130 –60C there are 22 on the right, 22 on the left
on Flange LS-01, CS-02, CS-03, CS 04. Where in
making all Heat Exchanger parts it starts with the
initial stage of making a Sketch, after the sketch is
successfully made it is continued with the Extrude
stage which aims to make what was only a 2D line
into a 3D design. For certain parts, if the 3D shape
has been formed, in order to make it perfect, you
need tools such as Cut Extrude to make holes or

Gambar 3. 4 Heat exchanger work


cuts, fillets, chambers to make a depression with a
From the results of the Heat Exchanger project certain angle you want, Thicken to make the
which was carried out for 7 days exactly with a one surface become an object with mass, offset useful
week deadline, the authors worked on the status on for making the Sketch smaller or larger on the
time. Then the level of assessment of the time of other hand, Fill Pattern makes the Feature as many
completion of the work against the time of completion as we want, Insert into a new part is to take a part
of work is at a value of 100% on time at the deadline. from the main part to be separated into its own
For difficulties in Heat Exchanger projects, they are at part, and lastly Revolve creates a 3D object from
the 2D Sketch being played. https://www.solidworks.com/product/solidworks-
2. In working on the 3D Heat Exchanger design, it 3d-cad.
was concluded that the level of achievement of the [5] Unlock educational access to Autodesk products,
3D Heat Exchanger design using Solidwork diakses pada 15 Agustus 2022 dari
software with a 100% success rate on time from https://www.autodesk.com/education/edu-
the target is no more or less than the 7-day software/overview?
deadline given by the Neosia Training Center. sorting=featured&filters=individual
[6] The most trusted and complete Design and
Engineering Training and Certification in
Indonesia, diakses pada 15 Agustus 2022 dari
https://www.neosiatc.com/semua-produk/
[7] Darius, Autodesk Inventor vs Solidworks (2016),
Suggestion diakses pada 07 Juni 2022 dari
1. Study and deepen Software Inventor first before https://blog.woodworkforinventor.com/autodesk-
entering advanced Solidwork Software to make it inventor-vs-solidworks-review/
easier to understand the software that will be used [8] Mor Merige, AutoCAD Unduh Gratis - 2023
to create 3D designs. Versi Terbaru, diakses pada 23 Agustus 2022 dari
2. Observe carefully the 2D drawing, so that the 3D https://id.wizcase.com/download/autocad/
design that will be realized will get the desired [9] Ankita Prajapati, Everything about Autodesk
results. Iventor, diakses pada 23 Agustus 2022 dari
3. Set the time so that all projects at the Neosia https://yourengineer.in/knowledge-hub/everything
Training Center can be completed before the given -about-autodesk-inventor-new-age-design-
deadline. technique/
4. In carrying out the verification exam from the [10] Jeff Rowe, First Look At SOLIDWORKS 2018
Neosia Training Center, for those who are online, (2017), diakses pada 23 Agustus 2022 dari
they are accompanied by a Mentor or more expert https://www10.mcadcafe.com/blogs/jeffrowe/201
during the exam so that system errors or human 7/09/14/first-look-at-solidworks-2018/
errors do not occur.

REFERENCES
[1] Sam, Speed Up Reverse Engineering with 3D
Scanning Services (2020), diakses pada 24 Juni
2022 dari
https://www.zeal3dprinting.com.au/speed-up-
reverse-engineering-with-3d-scanning-services
[2] Design/Engineering, diakses pada 22 Juli 2022
dari https://www.solidworks.com/domain/design-
engineering
[3] SOLIDWORKS - All Products by Domain,