Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

UG-TIL-02-M044-101363 - 02-82-NA-0003: CENTRAL CONTROL BUILDING - PLUMBING SYS Click here to view review comments in New Prodom (login

New Prodom (login required)


Revision: 00 (IFR)
Approver: Daher, Nicolas
Finalized: 18-Apr-2024 (UTC +3)
Review Status: 2 - Accepted with comments

Comment ID Comment Response Status File Name Page Number


1954520 What is the purpose of this drawing? There is no domestic hot and cold water Sectional details included in this drawing. Implemented UG-TIL-02-M044-101363_00_IFR_20240301.PDF 1
piping involved in this part of the CCB building. TKN Engineers need to pay
much more attention on whether it's necessary to issue a drawing for review
without any domestic water piping for domestic water system layout before any
kind of submission like this. This just creates further confusion and causes
unnecessary review. It won't add any benefit on the project. Please remove all
contents. Instead, please add the enlarged part plan details, sections/isometrics
in this drawing. Please resubmit this drawing in IFR in next revision as content
will be completely different. MDT to ensure this happens.

1955576 EDF: there is no routing and users in thi s section of the CCB? Sectional detail included in this drawing. Implemented UG-TIL-02-M044-101363_00_IFR_20240301.PDF 1

You might also like