CONSTRUCTION
No. of floors Height
1 or 2 less than 6m 3
3,4, or 5 between 6 and 15m 2
6,7,8 or 9 between 15 and 28m 1
10 or more more than 28m 0 3
Largest fire sector area
from 0 to 500 m 2 5
from 501 to 1500 m 2 4
from 1501 to 2500 m 2 3
from 2501 to 3500 m 2 2
from 3501 to 4500 m 2 1
more than 4500 m 2 0 5
Fire resistance
Fire resistant (concrete) 10
Non-combustible (metallic) 5
Fuel (wood) 0 10
False Ceilings
No fake tech hos 5
with false tea fireproof choses 3
with false tea different fuels 0 5
SITUATION FACTORS
Distance from Firefighters
under 5k 5 min. 10
between 5 and 5 and 10 min. 8
10
between 10 10 and 15 min. 6
and 15 15
between 15 and 25 min. 2
and
more25
than 25k 25 min. 0 10
Building Accessibility
Good 5
Half 3
Bad 1
Very bad 0 1
PROCESSES
Activation hazard
Low 10
Half 5 m
High 0
Thermal Load
5
Low 10
Half 5
High 0 5
Combustibility
Low 5
Half 3
High 0 5
Order and Cleanliness
High 10
Half 5
Low 0 5
Storage at Height
less than 2 m. 3
between 2 and 4 m. 2
more than 6 m. 0 5
CONCENTRATION FACTOR
Concentration factor $/m 2
less than 500 3
between 500 and 1500 2
more than 1500 0 3
Made by: Reviewed by

MESERI RESULTS TABLE

LEVEL OF R
MEANING
RISK O.B.

VERY LOW No specific action required P=

You will be required to purchase penomical documents for


LOW ensure that the effectiveness of measures is maintained P=

HALF It is necessary to control the risk in the minimum possible time P=


(Requires an Emergency Plan and Brigades).
The risk of fire cannot be tolerated. It is advisable to take
HIGH preventive measures as soon as possible. (Reauiere obligatorily P=
Plan v Brigades of
FIRE RISK ACTION
Date: Area:
uil, Apr 26 Yard
Eng. Emyl Yanez Girl

Concept Coefficient Points


DESTRUCTIBILITY
for heat
Low 10
Half 5
high 0 10
for smoke
Low 10
Half 5
high 0 10
Due to corrosion
Low 10
Half 5
high 0 10
By water
Low 10
Half 5
high 0 10
PROPAGABILITY
Vertical
Low 5
Half 3
high 0 5
Horizontal
Low 5
Half 3
high 0 5
SUBTOTAL (X)
109
PROTECTIVE FACTORS
Concept S.V. CV Points
Portable fire extinguishers (EXT) 1 2 1
Equipped fire hydrants 2 4 4
External moisturizing columns 2 4 2
Automatic detection (DTE) 0 4 0
Automatic sprinklers (ROC 5 8 5
Extinction by gaseous agents 2 4 4
CIIDTATAI IV\
()
I 16

CONCLUSION (Fire Protection Coefficient)

5X 5Y
P= + + 1(BCI )
22 120

P= 8.178030303

ESTIMATE
HALF
OBSERVATIONS:

a: Approved by:

RISK RISK
HAD OBTAINED

Major 7 P= Greater 7

5 to 6.99 P= 5 to 6.99

3 to 4.99 P= 3 to 4.99

1 to 2.99 P= 1 to 2.99