Concrete Checklist ���


Project Name MOBILY DATA CENTER Date of Pour

IR Reference Pour location


Pour information
Mix Design Design slump
Estimated concrete Qty Concrete placement Temp.
item Descriptions Yes No N/A comments
1.0 R=uired Documents
1.1 Check and confirm latest Revision/Versions of Approved Drawings are used.

2.0Survey

2.1 Confirm pre-pour setting out, position, Gl, Top and Bottom Elevation

2.2 Confirm position of cast in pipes, etc.


Confirm pre-pour survey for formwork & rebar dowel s, embeds (AB, Insert Plate)
2.3
Position/Elevation
2.4 line & Level as per drawing and specification

2.5 Survey pre-pour done

2.6 Other

3.0forms

3.1 Are forms in proper location (grade & alignment &dimensions and level )

3.2 Have form s been braced/supported & installed

3.3 Are forms dean and free of debris (dirt, wood chips, trash,etc)

3.4 Check for shuttering prop displacement / settlement

3.5 Styrofoam installed at CJ as per approved drawings

3.6 Other
NOTES:

1. DIMENSIONS ARE ALL IN MM, ANGULAR DIMENSIONS IN DEGREES AND ALL LEVELS
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 ARE IN METERS UNO.

2. NORTHING AND EASTING ARE SHOWN IN METERS AND ARE BASED ON W.G.S. 84.
52,030
2. RELATIVE REFERENCE LEVEL 0.000M IS EQUIVALENT
225 3,325 1,750 1,675 2,150 1,075 6,925 1,075 2,925 5,075 1,415 6,540 2,275 2,525 1,600 3,425 4,550 1,500 1,775 225 TO W.G.S. LEVEL +17.270M

3.) ALL LEVELS IN THIS DRAWINGS ARE SHOWN IN BOTH ABSOLUTE


875 800 6100 800 7800 800 7540 800 5290 800 3700 450 LEVEL(W.G.S.) AND RELATIVE LEVEL(LOCAL/PROJECT LEVEL)
T.O.W. +2.95 T.O.W. +2.95 T.O.W. +2.95 T.O.W. +2.95

200
400
400

400
A A

450

450

450
250

250

250
LEGENDS:

T.O.W. +2.95
C3-1 400 THK RET. WALL 225 C3-2 400 THK RET. WALL 700 C3-3 400 THK RET. WALL 315 C3-4 400 THK RET. WALL 625 C3-5 CN4-1

TOW+2.95
2268

950 450
20mm ISOLATION 20mm ISOLATION
2,293

2,293
1868
1868

1868
1818

1817
150 4950 1200
JOINT 1480 225 T.O.W.+2.950 300 3500 400 2750 450 JOINT T.O.C. = TOP OF CONCRETE
775 300 1200 1760 400
TOW+2.75 W1-1 450 THK RET. WALL T.O.W.+3.30 T.O.W. +3.30
W6-1 200 THK RET. WALL S.O.G.= SLAB ON GRADE

200
225

225

225

225

225

225

225
250 775 300
450

450

250 1200 450

950 450

450
500
B B

500

500

500
S.S.L.= STRUCTURAL SLAB LEVEL

250

800
200 THK RET. WALL

TOW+2.15
EL.+3.300
C7-3 C7-4 C7-5 C7-6 T.O.W. 450 THK RET. WALL 450 THK RET. WALL 1480 T.O.C.B=TOP OF CONCRETE BLINDING
450 2950 300 1200 6300 1200 7400 1200 7140 515 C2-1
300 T.O.W. +3.30 N.G.L.= NATURAL GRADE LEVEL
W6-2 B.O.E.= BOTTOM OF EXCAVATION
300 4000 300

3402
250 THK UPSTAND WALL (TOW+2.150) G.W.L.=GROUND WATER LEVEL

T.O.W. +3.20
2002

W6-3
25060 250 1890 250

3800
SHOP DRAWING NOTES

3975
CABLE TRENCH WALL
7050

W1-2

250 1500 250

250 1500 250

250

250 1500 250

1180 250
W1-1

W5
8,775

8,775
THIS SHOP DRAWING SHALL BE READ IN CONJUNCTION WITH THE FF:

7900

8650
CABLE TRENCH 4000 300
250 1000 500 4900 500 1100 493 1000 500 5052 500 1005 350 1211 500 4565 500 1036 350

W6-1

1500 100
1100 3000
250 775 300
1.) COLUMN AND WALL SURVEY SETTING LAYOUT:

W6-1
250

250

250
3998
W6-1

500

500

500

500

CABLE TRENCH WALL


CABLE TRENCH WALL TECB-JED3-SO-SI-104-1-1

12450
2567
1808

1308

2076
W6-2

2450

1950
2.) COLUMN AND WALL AXES LAYOUT:
1000 1010 1000

ELEV.+3.20
325 575 100 178
ELEV+2.15

250
EL.+3.300 TECB-JED-SC-F-100-1-1

OPG AT
OPG. AT

1100
1100

T.O.W.

T.O.W. +3.20
250

250

250
850

250
100

1100

1100

W6-3
225

3800
3975
3.) COLUMN VERTICAL STARTER REINFORCEMENTS:
1600

805

2189

600
2000

2000

2000

300
400
150
700

2125

2125

2125
1625

1625
C C

1548
TECB-JED3-SR-F-301-1-3
300

300

800

950 1000
1000 1010 1210 1000 C4-1

250 THK RET. WALL


225 C8-12 1500 825 1675 300 3500 1000 2150 450 TECB-JED3-SR-F-301-2-3

1900
250

250

250
C3-6 TECB-JED3-SR-F-301-3-3
C10-1 800 C10-2 800 C10-2 800

100
300 3050 450 1650 600 7450 7800 7540 1710 250 250W6-1

(TOW+3.20)
250 THK RET. WALL(TOW+1.950)

1010

500
3050
3,925

3,925
3600

3600
4.) WALL STARTER REINFORCEMENTS:

W6-2

100

T.O.W. +3.20
1500 300
TECB-JED3-SR-F-701-1-4

W6-3
1700
W6-1
1950
450 2900 450 1950 250 1000 250 6993 250 1000 250 6907 250 1211 250 5065 250 1035 350 EL.+3.300 20mm ISOLATION
T.O.W. 20 TECB-JED3-SR-F-701-2-4
225 JOINT
6250

C3-9 2500
450 THK RET. WALL ISO. JOINT

250
250

250

250
TECB-JED3-SR-F-701-3-4
575

575
800

800

W6-1 200 THK RET. WALL

150

450
450
D D

300
250 1450 250

250

200
225
TECB-JED3-SR-F-701-4-4

250 THK RET. WALL


300 C3-7 C3-8 800 700 2150 950 7100 1480
450 1950 1500

1450
T.O.W. +3.30 T.O.W. +3.30

TOW+2.25
1450
250 1890 250
2825

2825

2825

2875
4.) UPSTAND WALL REINFORCEMENTS:
2,850

2,850
2400
TECB-JED3-SR-F-702-1-1

250
250 1169

450 950
450 4450 500 3725 1575 7300 1600 7715 600 6296 500

950

375 1175
800 225 225

225
225

225

225

225

225

225
250
E E
600

600

600

600

600
300
1200

1200

1200
1600
C8-1 C8-2 CN3-3 C8-5
500 1400 C8-4
1419 1600 3100 450 2700 1600 1500 250
250 400
C7-1
C6-1 C8-3
450 C6-4
300

250 THK RET. WALL (TOW+2.250)


CABLE TRENCH WALL

CABLE TRENCH WALL


250 THK RET. WALL(TOW+1.950)

CABLE TRENCH
7448
7,523

7,523
6848

6848

6848

6848

6248
6248

6248

5498

46,868
47,358

450 4450 500 4525 1600 8000 1600 6190 600 6145 1600 8000 320 850 250 1500 250 4750 450
95
C8-11

350 250
650
300

300

300

300

300
600

600

600

600

600
F F

1600

1200
1200

1200

900
1325 C8-6 1600 C8-7 1505 C8-10 1600 1570

250 C6-2 C7-2 C8-9


400 600 250 C6-3

18848
250 THK RET. WALL (TOW+1.950)

250 THK RET. WALL (TOW+1.950)


9,600

9,600
9000

9000

9000

9000
9150
8192

8252
8550

01 27-JAN-24 REVISED AS CLOUDED

00 13-JAN.-24 ISSUED FOR APPROVAL


20mm ISOLATION 20mm ISOLATION
450 2950 300 1250 450

D
JOINT JOINT

ED
ED

TE
1480 450 1480

ED

ROV
MIT
WN
REV. No. DATE DESCRIPTION

IEW
GN
4525 1600 6975 450 575

ECK
1600 6190 600 2065 4080 1600 820 450 6730 1600 1320 200 4800
248 200

TOW+1.95 TOW+1.95

SUB
DRA

APP
DES

REV
TOW+2.10

CH
200
300

C9-3
300

TOW+2.10 300
1100 1050

100

300 427

G G
700

700

700

700
450

450

450
200 THK W2-4 200 THK

250
250
400

400
ELEV.+1.25

200 THK
RAMP WALL 250 THK UPSTAND WALL RAMP WALL
1600

CN3-2

WALL
CN3-1 C9-1 C9-2 320
OPG. AT

1325 CN3-5 C9-4


300 THK R.C. WALL

1450
2950 300
2600

1505 520 300


EL.+1.35 250 THK UPSTAND WALL
LIFT STATION
T.O.W. C8-12
300 STRUCTURE ISOLATED
750

W2-5

250 THK UPSTAND WALL


300 THK R.C. WALL

300 THK R.C. WALL


FROM RAFT FOUNDATION
300 600 300

3550

4760
TOW+2.10
1200

TOW+2.10
3510
5773

6652
6500

W2-6
5452

9450
W4
8,777

8,777
200
W2-1

450
300 5900 300 250 1200 450
TOW+2.10

450
300 THK R.C. WALL
300

CN3-4
7010

1400 200
T.O.W.+1.950
W2-3

T.O.W.+2.10
RET. WALL

RET. WALL
200 THK RET. WALL 200 THK RET. WALL 200 THK RET. WALL

2000
450 THK

450 450 THK


1600

1600
8350

24730
450 2950 300 5600 1000 7650 1000 T.O.W. +1.95 1000
500
C5-3 C5-4 500
225

225

450
450

450

450

450

H H
225

C5-2
900 C5-1 8165 1000 7815 1000 6750 C5-5 450 THK RET. WALL
500 6900 450
RET. WALL
T.O.W.+1.25

450 THK

T.O.W. +2.10
2,900

2,900
3616

2700
LEV+1.25
OPG. AT
490 200 1100
265

200 THK RET. WALL


I I

225
W2-2
200
715

450
450

225

3700 15250
T.O.W.+1.25

225 3,325 1,750 1,675 2,150 1,075 6,925 1,075 2,925 5,075 1,415 6,540 2,275 2,525 1,600 3,425 4,550 1,500 1,775 225 MOHAMMED MANSOUR AL RUMAIH
TRADING COMPANY (JOINT STOCK)
52,030

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 P.O. BOX 10510


RIYADH 11443
TEL: 464-74-19
FAX: 465-73-04

CONTRACT No. 068/2022 DATE: 13-JAN.-2024

SCALE: DRAWING No. REV.

1:100 TECB-JED3-SC-F-100 1/1 01

You might also like