STRUCTURAL ANALYSIS/DESIGN REPORT

PROJECT NAME PHARMACY FIT-OUT


PROJECT CODE MCR1
SITE ADDRESS 4 MALUKA DR, PALMERSTON CITY NT 0830
ITEM STRUCTURAL STEEL CALCULATION

B 2023.12.06 Phu Nguyen Vu Huynh


A 2023.11.20 Phu Nguyen Vu Huynh
Revision Date Prepared by Checked by Approved by
Contents

1 Structural Materials 1

2 Structure size 1

3 Design assumptions 5
3.1 Boundary conditions ..................................................................................................... 5
3.2 Load assumptions ......................................................................................................... 5
3.2.1 Self-Weight ............................................................................................................. 5
3.2.2 Finishing ................................................................................................................. 5
3.2.3 Live Load (Machine, device, or equipment) ........................................................... 6

4 Structural weight 6

STRUCTURAL STEEL CALCULATION Number:


Sep 2022 Project Code: HLC
Figures
Figure 2-1: 3D model .................................................................................................................. 1
Figure 2-2: Bottom frame plan view ........................................................................................... 2
Figure 2-3: Top frame plan view ................................................................................................. 2
Figure 2-4: Elevation 1 ............................................................................................................... 3
Figure 2-5: Elevation 2 ............................................................................................................... 4
Figure 2-6: Elevation 3 ............................................................................................................... 4
Figure 2-6: Elevation 4 ............................................................................................................... 5
Figure 3-1: Loading plan............................................................................................................. 6

STRUCTURAL STEEL CALCULATION Number:


Sep 2022 Project Code: HLC
1 Structural Materials
Steel for columns (RHS): JIS G 3101 Gr. SS400.

Steel for beams (H-Beam, RHS, SHS): JIS G 3101 Gr. SS400.

Steel for top joist, and C-stud wall: AS/NZS 1397 Grade G450Z275.

Steel decking: JIS G 3101 Gr. SS400.

Connection bolts: AS/NZS 1252 / ISO 4017 Grade 8.8 TB.

(Detailed section size and grade will be shown in DWGs).

2 Structure size

Figure 2-1: 3D model

STRUCTURAL STEEL CALCULATION Number:


Dec 2023 1 Project Code: MCR1
Figure 2-2: Bottom frame plan view

Figure 2-3: Top frame plan view

STRUCTURAL STEEL CALCULATION Number:


Dec 2023 2 Project Code: MCR1
Figure 2-4: Elevation 1

STRUCTURAL STEEL CALCULATION Number:


Dec 2023 3 Project Code: MCR1
Figure 2-5: Elevation 2

Figure 2-6: Elevation 3

STRUCTURAL STEEL CALCULATION Number:


Dec 2023 4 Project Code: MCR1
Figure 2-7: Elevation 4

3 Design assumptions

3.1 Boundary conditions

• Steel modules are modelled as “pinned connection” to Footing via anchor bolts.

• The secondary members such as C-floor joist, and C-stud are released moments both
ends.

3.2 Load assumptions

3.2.1 Self-Weight
Structure material use: Steel
Density, gsw = 78.5 kN/m3 (Determined by software automatically)

3.2.2 Finishing
Bottom floor: gf = 10kg/m2 (including Vinyl flooring, Metal sheeting)
Top ceiling: gf = 45kg/m2 (Compound ceiling, hat purlin, Metal sheeting)
Side wall: gf = 45kg/m2 (Compound ceiling, hat purlin, Metal sheeting)

STRUCTURAL STEEL CALCULATION Number:


Dec 2023 5 Project Code: MCR1
3.2.3 Live Load (Machine, device, or equipment)
The loading plan below is assumed according to Australian standards and based on the
machine layout as follows:

Figure 3-1: Loading plan

4 Structural weight
The rough structure weight (self-weight), which is exported from the analysis model (Etabs), is
6 tons for a unit (20 feet).

STRUCTURAL STEEL CALCULATION Number:


Dec 2023 6 Project Code: MCR1