Professional Documents
Culture Documents
RLR-Halfaya-AT5006 (HF1341) 16.07.23
RLR-Halfaya-AT5006 (HF1341) 16.07.23
POC
Company Position Name Phone # Email
Garda World Site Security Manager James Kerodong 07809211545 Jkerodong@gmail.com
Garda World Project Manager Rudy 07809211537 Halfaya.RigPM@garda.com
Antonoil Rig HSE Manager Faisalfaq Nawaq 07845582067 faisalfaqnawaq@petrochina-hfy.com
Antonoil Rig Company Man n/a n/a n/a
Antonoil Rig Manager Yang Pengyu 07834970373 Yang Pengyu@petrochina-hfy.com
Observations
Rig site is guarded by Garda World Security, x1 SSM, x3 armed guard at the gate, who controls entry and exit, small guard cabin at gate.
Rig perimeters are surrounded by berms with razor wire and ditches. There are no towers.
There are two police officers staioned at the front of the main ECP. Both members had AK47s.
Field CP (Military)100% permissions check.
GSM network (Zain and AsiaCell) works fine.
There is only one route in/out of the concession
Safe Havens
Location Grid Distance Info Remarks
CPF 1 38RQA 30467 07075 7,5 km Central Prodiction Facility 1 Secured by GW Security
CPF2 38RQA 37515 05717 12,4 km Central Prodiction Facility 2 Secured by GW Security
COMMERCIAL IN CONFIDENCE 1
HF0287 AT5006-Rig Location Report
COMMERCIAL IN CONFIDENCE 2
HF0287 AT5006-Rig Location Report
RV1 BIA junction 38RQU 59366 78916 25mins from HBC Basra International Airport
RV2 Rte 6 Al Hartha junction 38RQV 57932 03904 30mins from RV1 to RV2 MSR-ASR
RV3 Saleh Castle Hospital, Madhar 38RQV 17667 89132 26 km from at 5005 On the way to task hosptial ,safe area
RV4 CP on entrance of Consession 38RQA 17057 06877 CP on entrance of Consession Main CP IP
RV5 Turn to Petrochina Camp 38RQA 19833 07799 6 mins from DQ20 HF127 Entrance of PCH camp
Route Report
Insert Map
COMMERCIAL IN CONFIDENCE 3
HF0287 AT5006-Rig Location Report
COMMERCIAL IN CONFIDENCE 4