Professional Documents
Culture Documents
RLR-BD52 (Zpec25) 28oct23
RLR-BD52 (Zpec25) 28oct23
RLR-BD52 (Zpec25) 28oct23
POC
Company Position Name Phone # Email
Garda World Project Manager Kevin 07827802629 basra.rfpm@garda.com
Garda World Site Security Manager Yussuf 7809211521 basra.rig02@garda.com
ZPEC Rig Manager Wong Song 07810691391 zj25@zpec.com
ZPEC Rig HSE Manager Fong 7852883141 yingchao.feng@zpec.com
Hong Hua Company man Reginald Lomatu 61413757054 reginald.lomatu2@
Observations
Rig site is guarded by Control risk Security, x7 armed guard at the gate, who controls entry and exit, small guard cabin at gate + supervisor.
Rig perimeters are surrounded by dytches and berms with razorwire, 4 towers.
Two dropdown barriers
MSR and ASR - Raised black top tarmac road, poor condition last 3 km.
Field CP (Military)100% permissions check.
GSM network (Zain and Asia Cell) works fine.
There is only one route in/out of the concession
Safe Havens
Location Grid Distance Info Remarks
ROO HQ 38RQU3254647153 8.3 Km BP Office Secured by CRG
DS Markazia 38RQU3001444628 2.5 Km Degassing Station Markazia Secured by IPF
COMMERCIAL IN CONFIDENCE 1
Halfaya
HF0438 DQ29 Location Report
Insert Map
COMMERCIAL IN CONFIDENCE 2
Halfaya
HF0438 DQ29 Location Report
# Description Grid Info Remarks
RV1 Heart junction 38RQU4936246207 2 mins from HBC Basra International Airport
RV2 Tampa bridge 38RQU2208484244 10 mins from RV1 to RV2 Major junction
RV3 South CP 38RQU2271899413 9 Km from Rig ZPEC 25 On the way to safe area
RV4 BP junction 38RQU3252245328 7 Km from Rig ZPEC 25 Entrance to ROO HQ
RV5 Turn to location 38RQU2918145137 4 mins from ZPEC 25 MSR and ASR
Route Report
COMMERCIAL IN CONFIDENCE 3
Halfaya
HF0438 DQ29 Location Report
COMMERCIAL IN CONFIDENCE 4