Work Method Statement

UNLOADING UNIT
Document Number :

LAL/WMS/HSE/001/03/2024

PT LINESIA ADOFA LESTARI

Prepared by : Approved by :

Dwi Windi Aji


Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit

1) Purpose:
The purpose of this activity is to ensure that the unloading unit from towing to ground. This method
statement shall ensure that the installation is executed safely. This method statement applies to
everyone who is related to work in PT Linesia Adofa Lestari all site.

2) Scope:
This activity is carried out in the PT Linesia Adofa Lestari site .

3) Definitions and abbreviations:


Glossary Description
Client The contract giver
ERT Emergency Response Team
PPE Personal Protective Equipment
SPV Supervisor

4) Reference documents:
1. Undang-Undang Nomor 1 Tahun 1970
2. Undang-Undang Nomor 22 Tahun 2009 tentang Lalu Lintas dan Angkutan Jalan
3. Permen nomor 8 tahun 2020
4. Peraturan Pemerintah Nomor 41 Tahun 1993 tentang Angkutan Jalan

5) Machinery and tools:


1. Towing Car
2. Mechanical hand tools
3. Mobile Crane 25T
4. Lifting Gear

6) Chemical substances used:


No use chemical substances

7) Environment of work:
The activity takes place in client area and this activity is medium risk. When unloading unit that
needs to be considered is the clear area. Skill and accuracy are required during unloading this unit.
Make sure area clear for any obstacle and people who not capable for this activity.

Page 2 of 5
Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit
8) PPE required:
1. Safety helmet.
2. Hand gloves.
3. Work uniform
4. Safety Shoes.
5. Vest with reflector
6. Full Body Harness

9) Competency certifications:
Competency standard for driver must have driving lisence and for the operator must have SIO from
Disnaker RI. The lisence must be valid and not expired.

10) Step of Activity:


Duration of Activity : 1 Day
Description of the Activity (Step by Step)
1 Ensure that all document of this activity have been approved

2 Make sure the unit unloading area is in the clear area and there are no obstructions

3 Make sure the unloading area is flat and firm

Make sure the parking brake is engaged when unloading the unit
4

5 Ensure that no unauthorized persons enter the work area

6 Ensure that lifting activity in accordance with lifting plan

7 Make sure the person doing the unloading is a competent person as proven by SIO

8 Take the signal during unloading unit

9 Do this activity by the smooth

• Ensure that when do the work, please the work area is separated by a 360° barricade and only
people involved in the work are allowed to enter the work area
• Make sure the towing unit has wheel chocks installed on the wheels during the unloading process

Page 3 of 5
Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit
Permits Required:

Which Golden Rules apply?

☐ 1 High-Risk Situations ☒ 5 Work Permits ☐ 9 Excavation Work

☒ 2 Traffic ☐ 6 Lifting Operations ☐ 10 Work at Height

☒ 3 Body Mechanics and Tools ☐ 7 Powered Systems ☐ 11 Change Management

☒ 4 Protective Equipment ☐ 8 Confined Spaces ☐ 12 Simultaneous Operations / Co-Activities

11) Emergency Respons Procedure

PT DSV Indonesia
PT Linesia Adofa Lestari 1. Ronald Fitron
Kecelakaan
1. Abidul M ukm in (0882-1451-2370)
(0895-1382-3178)
(3)

(1)

ADA KORBAN LUKA?

(2)
Tidak

YA

Butuh
BUAT LAPORAN NYARIS Evakuasi ?
CELAKA (NEARMISS)
(4)

Tidak YA
(5) (6)

Peraw atan Rum ah Sakit


Peraw atan di Klinik Project Rumah Sakit/ Klinik
Diaw asi oleh petugas P3K Rujukan
Observasi di Klinik Project

Laporan Kecelakaan,Investigasi
dan Penyelesaian
(7)

SELESAI

Page 4 of 5
Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit

Page 5 of 5