UNLOADING UNIT
Document Number :
LAL/WMS/HSE/001/03/2024
Prepared by : Approved by :
1) Purpose:
The purpose of this activity is to ensure that the unloading unit from towing to ground. This method
statement shall ensure that the installation is executed safely. This method statement applies to
everyone who is related to work in PT Linesia Adofa Lestari all site.
2) Scope:
This activity is carried out in the PT Linesia Adofa Lestari site .
4) Reference documents:
1. Undang-Undang Nomor 1 Tahun 1970
2. Undang-Undang Nomor 22 Tahun 2009 tentang Lalu Lintas dan Angkutan Jalan
3. Permen nomor 8 tahun 2020
4. Peraturan Pemerintah Nomor 41 Tahun 1993 tentang Angkutan Jalan
7) Environment of work:
The activity takes place in client area and this activity is medium risk. When unloading unit that
needs to be considered is the clear area. Skill and accuracy are required during unloading this unit.
Make sure area clear for any obstacle and people who not capable for this activity.
Page 2 of 5
Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit
8) PPE required:
1. Safety helmet.
2. Hand gloves.
3. Work uniform
4. Safety Shoes.
5. Vest with reflector
6. Full Body Harness
9) Competency certifications:
Competency standard for driver must have driving lisence and for the operator must have SIO from
Disnaker RI. The lisence must be valid and not expired.
2 Make sure the unit unloading area is in the clear area and there are no obstructions
Make sure the parking brake is engaged when unloading the unit
4
7 Make sure the person doing the unloading is a competent person as proven by SIO
• Ensure that when do the work, please the work area is separated by a 360° barricade and only
people involved in the work are allowed to enter the work area
• Make sure the towing unit has wheel chocks installed on the wheels during the unloading process
Page 3 of 5
Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit
Permits Required:
PT DSV Indonesia
PT Linesia Adofa Lestari 1. Ronald Fitron
Kecelakaan
1. Abidul M ukm in (0882-1451-2370)
(0895-1382-3178)
(3)
(1)
(2)
Tidak
YA
Butuh
BUAT LAPORAN NYARIS Evakuasi ?
CELAKA (NEARMISS)
(4)
Tidak YA
(5) (6)
Laporan Kecelakaan,Investigasi
dan Penyelesaian
(7)
SELESAI
Page 4 of 5
Doc No : LAL-WMS-HSE-001-03-2024
PT LINESIA ADOFA LESTARI
Date : 03/2024
Work Method Statement
Project : DSV Indonesia
Unloading Unit
Page 5 of 5