F.ENG.01.

00

DATA KAPASITAS Dibuat Diperiksa Disetujui

NAMA SUB CON : CV SEMBADA ERA PERKASA


TYPE/PROJECT : K97
TANGGAL : 6/5/24 Syifa A Ano K Ganesha SP
06/05/2024 06/05/2024 06/05/2024

Data Capacity
QTY Sharing
WORK PROD PROD Line /
QTY MOULD CYCLE CAVIT Total Total
SUB HOUR % TIME CAP / NEED % Machine Status
NO PART NAME PART NO MAIN PROCESS Plant MACH / DIES / EFF TIME Y Need + % Remark
CON / DAY Reject CAPACITY DAY BME LOAD (+/-)
(Unit) JIG (Second) (Pcs) Reject Load
(Hour) (Second) (Pcs) Item %
(Unit)

Capacity Current

1 Rod 77221-K97-T000-21 Cutting


Pekayon 1 1 8 90% 1%
25.632
5 1
5.126 606 600 12%
12%
lebih 1MP 1 Shift

Pekayon 1 1 8 90% 1% 15 1 35%


Bending 1- 4 25.632 1.709 606 600 35% lebih 1MP 1 Shift

Pekayon 1 1 8 90% 1% 5 1 12%


Final Inspeksi 25.632 5.126 606 600 12% lebih 1MP 1 Shift