DATE FOR DEADLINE

POWER FACTOR
CORRECTION

3/27/2023

4/18/2023
5/11/2023
5/22/2023

5/31/2023

6/7/2023

6/22/2023

6/30/2023
AFTER APPROVAL
PROCESS OF PROJECT DEVELOPMENT

LITERATURE REVIEW & MARKET RESEARCH

INPUT AND OUTPUT RATINGS SELECTION

ESTIMATION OF THE BUDGET FOR THE PROJECT

SOFTWARE PURCHASE

SIMULATION
SIMULATION

PURCHASING OF COMPONENTS

HARDWARE
MECHANICAL DESIGN

EVALUATE AND DEBUG

QUALITY CHECKING

CERTIFICATION & APPROVAL FROM STANDARD TEST CENTER

3D MODELLING DOCUMENTATION AND USER MANUAL CREATION


BATCH PRODUCTION
SUB PROCESS 1

RESEARCH THE COMPETITION AND CONFIRM THAT


MARKET EXIST FOR OUT PRODUCT

SELECTION OF RATING OF INPUT AND OUTPUT


POWER VOLTAGE AND CURRENT AS PER MARKET
REQUIRMENTS

ESTIMATING APPROXIMATE BUDGET OF THE


PROJECT

PURCHASING OF NEW SOFTWARE IF NEEDED

DESIGN OF SCHEMATIC DIAGRAM OF POWER


FACTOR CORRECTION
DESIGN OF SCHEMATIC DIAGRAM OF POWER
FACTOR CORRECTION

1) IDENTIFY THE BEST SUITABLE STORE OR


ONLINE PLATFORM
2) SENDING THE LINK OR CONTACT NUMBER TO
THE PURCHASE TEAM WHERE WE CAN FIND THE
RIGHT COMPONENTS

SELECTION OF RIGHT COMPONENTS


DESIGN OF MECHANICAL CHASE , CASE,
FINISHING

1) EVALUTE THE COMPLETE PRODUCT AND MAKE A


TEST RUN CONTINUOUSLY

2) CHECK ANY FAULT OR MALFUNCTIONS ARE


HAPPENING

CHECKING THE QUALITY OF THE PRODUCT AS PER


INDUSTRY QUALITY STANDARDS

SEND THE FINAL PRODUCT FOR APPROVAL

MODELLING IN 3D

PREPARATION OF USER MANUAL


PROCEED FOR BATCH PRODUCTION AFTER
GETTING THE APPROVAL
SUB PROCESS 2

1) COLLECTION OF DESIGN PAPERS


2) COLLECTION OF SOFTWARE AND HARDWARE DESIGN VIDEO
LECTURES AND USEFUL LINKS
3) SEARCH FOR DESIGN RELATED THESIS/DOCUMENTS AND DATA
COLLECTION
4) DETAILED STUDY OF QUALTIY AND TESTING STANDARDS

1) INCLUDE THE COST OF THE PCB ASSEMBLY,FINAL PRODUCT


ASSEMBLY, PRODUCT TESTING, RETAIL PACKAGING
2) SUBMISSION OF ESTIMATED BUDGET TO THE PURCHASE TEAM

1) PROTEUS, KICAD SOFTWARES ARE USED FOR SIMULATION AND


PCB DESIGN
2) OPEN SOURCE SOFTWARE

DESIGN OF OPEN LOOP SOLARCHARGE CONTROLLER


1) DESIGN OF RECTIFIER CIRCUIT
2) DESIGN OF VOLTAGE SENSING CIRCUIT
3) DESIGN OF CURRENT SENSING CIRCUIT
4) DESIGN OF OSCILLATOR CIRCUIT
5) DESIGN OF BOOST CONVERTER
6) DESIGN OF COMPARATOR
7) ZERO CROSSING DETECTOR
8) POWER FACTOR CORRECTION CAPACITOR BANK SIZING
CALCULATION

CREATION OF PRELIMINARY BILL OF MATERIALS

ENSURE THE RIGHT COMPONENTS HAS BEEN PURCHASED


1) PREPARE THE DOCUMENTATION AS PER THE STANDARS TEST
CENTER PROCEDURE

2) CHECKING WHETHER ALL SAFETY STANDARDS WERE FOLLOWED

1) PREPARATION OF MECHANICAL DIMENSIONS 3D MODEL


2) PREPARATION OF ELECTRICAL WIRING CAD DIAGRAM OF ALL
WIRING USED IN PRODUCT
SUB PROCESS 3

1) IDENTIY BEST SUITED MODEL OR PROTOTYPE


2) FINILISE THE DESIGN TOPOLOGY

GET THE APPROVAL

DESIGN OF CLOSED LOOP


DESIGN OF FEEDBACK SENSING ELEMENTS
BREAD BOARD LEVEL TESTING

1)HARDWARE TESTING IN BOARD LEVEL

2) VERIFY AND CHECK WHETHER THE ALGORITHM


WORKING PROPERLY
3) IF RESULTS ARE SATISFIED GO TO PCB LEVEL

4) INTEGRATE ALREDY DESIGNED NORMAL


INVERTER WITH THIS SOLAR INVERTER
SUB PROCESS 4

PROGRAMMING
WRITING ALGORITHM USING MICROCONTROLLER
PCB PROCESS

1) DESIGNING PCB ELECTRONIC CIRCUIT IN PCB DESIGN SOFTWARE

2) VERIFICATION OF PCB DESIGN


3) PRINT THE PCB IMAGE TO PCB PLATE

4) ETCHING AND DRILLING PROCESS


5) SOLDERING OF ELECTRONICS COMPONENTS TO PCB
6) CALIBARATION PROCESS
7) TESTING OF WHOLE DESIGN
SUB PROCESS 5
INTEGRATION OF IOT/(SMART TECHNOLOGY)

INTEGRATION OF IOT MOBILE APPLICATIOON ONTO THE PRODUCT

DEVELOP THE MOBILE APPLICATION


SIMULATION TESTING

HARDWARE TESTING WITH PRODUCT


SUB PROCESS 6
CREATION OF FINAL BILL OF MATERIAL

CREATE THE FINAL BOM


ATERIAL