to the Minutes of 114th EAB Meeting held on June 6, 2024 at PEC H/O, Islamabad
Zone-II (Sindh/Balochistan)
Name of University/
S# 114th EAB Decision
Program Profile
01. Iqra University, Karachi (Main Campus)
Program B.E. Electrical Based on the satisfactory level of compliance
Current Status From Intake and triangulation of breadth and depth of the
Batches 2017 to program, QMS, CQI and implementation of OBE
2018 system, the re-accreditation is granted for two
Visit Type Re-Accreditation (02) years i.e., for Intake Batches 2019 & 2020.
Date of Visit March 8-9, 2024
The Institution, however, is required to address
all observations, particularly in Criteria 1 ,2, 3, 5
& 8, as mentioned in the evaluation report as part
of its CQI process before applying for re-
accreditation.
02. Isra University, Hyderabad
a. Program B.E. Civil Based on partial implementation of OBE and
Current Status From Intake of incomplete assessment, CQI for the program,
Batch 2017 to re-accreditation is recommended for one (01)
2018 year i.e. Intake Batch 2019 subject to
Visit Type Re-Accreditation submission of satisfactory compliance report
Date of Visit November 24-25, alongwith tangible evidences of all major
2023 observations, particularly in Criteria-2, 3, 6 & 8
as mentioned in the detailed evaluation report.
Name of University/
S# 114th EAB Decision
Program Profile
Date of Visit November 24-25, i. Re-accreditation is granted for Intake Batch
2023 2019.
ii. Re-accreditation is also recommended for
Intake Batch 2020 subject to submission of
a satisfactory compliance report alongwith
tangible evidence on major observations,
particularly in Criteria-1, 2, 3 & 8 as
mentioned in the detailed evaluation report
to be verified through a Confirmatory
Visit.
Name of University/
S# 114th EAB Decision
Program Profile
Date of Visit February 27-28, program, QMS, CQI and implementation of OBE
2024 system, the EAB decided as follows:
Name of University/
S# 114th EAB Decision
Program Profile
Date of Visit April 22-23, 2024 (MFS) and Full Time Dedicated Faculty (FTDF)
as defined in Section 3.2.5 of PEC Manual of
Accreditation-2019.
Date of Visit May 17-18, 2024 The Institution, however, is required to address
all observations, particularly in Criteria 5 & 7, as
mentioned in the evaluation report as part of its
CQI process before applying for re-accreditation.
05. NED University of Engineering & Technology, Karachi
a. Program B.E. Electronics Based on the satisfactory level of compliance
Current Status From Intake of and triangulation of breadth and depth of the
Batch 1998-99 to program, QMS, CQI and implementation of OBE
2019 system, re-accreditation is recommended for
Visit Type Re-accreditation four (04) years i.e. Intake Batches 2020, 2021,
2022 & 2023.
Date of Visit May 16-17, 2024
The HEI is required to submit a Midterm
Progress Report as part of CQI process along
with the evidence/ record on initiatives, major
chances, accomplishments, and attainments,
after the graduation of Intake batch 2022.
Name of University/
S# 114th EAB Decision
Program Profile
Date of Visit May 16-17, 2024 The HEI is required to submit a Midterm
Progress Report as part of CQI process along
with the evidence/ record on initiatives, major
chances, accomplishments, and attainments,
after the graduation of Intake batch 2022.
Name of University/
S# 114th EAB Decision
Program Profile
Visit Type Accreditation system, the accreditation is granted for two
years (02) years i.e., for Intake Batches 2020 &
Date of Visit May 24-25, 2024 2021.
Note:
Date of Visit May 24-25, 2024 The Institution, however, is required to address
all observations of the evaluation report,
particularly in Criteria 3 & 6 as part of its CQI
process before applying for re-accreditation.
b. Program B.S. Electrical Based on the satisfactory level of compliance
Engineering and triangulation of breadth and depth of the
Current Status From Intake of program, QMS, CQI and implementation of OBE
Batch 2015 to system, re-accreditation is granted for three (03)
2019 years i.e. Intake Batches 2020, 2020-F & 2021.
Visit Type Re-accreditation
The Institution, however, is required to address
Date of Visit May 24-25, 2024 all observations of the evaluation report,
particularly in Criteria 3 & 6 as part of its CQI
process before applying for re-accreditation.
c. Program B.S. Electronics Based on the satisfactory level of compliance
Engineering and triangulation of breadth and depth of the
Current Status Till Intake of Batch program, QMS, CQI and implementation of OBE
2019 system, re-accreditation is recommended for
Visit Type Re-accreditation
7
Name of University/
S# 114th EAB Decision
Program Profile
Date of Visit May 24-25, 2024 three (03) years i.e. Intake Batches 2020, 2020-
F & 2021.
Name of University/
S# 114th EAB Decision
Program Profile
Ghulam Ishaq Khan Institute of Engineering Sciences and Technology, Topi –
1
Swabi
Program B.Sc. Engineering Based on the satisfactory level of compliance
Sciences and triangulation of breadth and depth of the
Current Status From Intake of program, QMS, CQI and implementation of OBE
Batch 2015 to system, the re-accreditation is granted for three
2018 (03) years i.e. Intake Batches 2020, 2021 &
Visit Type Re-accreditation 2022.
Date of Visit March 29-30 ,
2024 The Institution, however, is required to address
all observations of the evaluation report,
particularly in Criteria-3, 5, 6, 7 & 9, as part of its
CQI process before applying for reaccreditation.
Name of University/
S# 114th EAB Decision
Program Profile
The Institution, however, is required to address
all observations of the evaluation report,
particularly in Criteria-1, 2, 3 & 9, as part of its
CQI process before applying for reaccreditation.
3 International Islamic University, Islamabad
a. Program Bachelor of Based on the satisfactory level of compliance
Science (B.S.) in and triangulation of breadth and depth of the
Civil Engineering program, QMS, CQI and implementation of OBE
Current Status From Intake of system, re-accreditation is granted for two (02)
Batch 2014 to years i.e. Intake Batches 2020 & 2021.
2018
(No students were The Institution, however, is required to address
enrolled by the HEI all observations of the evaluation report,
in 2019). particularly in Criteria-1, 2, 3, 5 & 8 as part of its
Visit Type Re-accreditation CQI process before applying for reaccreditation.
Date of Visit May 20-21, 2024
b. Program Bachelor of Based on the satisfactory level of compliance
Science (B.S.) in and triangulation of breadth and depth of the
Mechanical program, QMS, CQI and implementation of OBE
Engineering system, re-accreditation is granted for three (03)
Current Status From Intake of years i.e. Intake Batches 2020, 2021 & 2022.
Batch 2010 to
2019 The Institution, however, is required to address
Visit Type Re-accreditation all observations of the evaluation report,
Date of Visit May 20-21, 2024 particularly in Criteria-1, 2, 3, 5 & 8 as part of its
CQI process before applying for reaccreditation.
4 National University of Technology, Islamabad
a. Program Bachelor of Based on the satisfactory level of compliance
Science and triangulation of breadth and depth of the
Mechanical program, QMS, CQI and implementation of OBE
Engineering system, re-accreditation is granted for three (03)
Current Status From Intake of years i.e. Intake Batches 2020, 2021 & 2022.
Batch 2018 to
2019 The Institution, however, is required to address
Visit Type Re-accreditation all observations of the evaluation report,
Date of Visit May 23-24, 2024 particularly in Criteria-1, 2, 3 & 8 as part of its
CQI process before applying for reaccreditation.
b. Program Bachelor of Based on the satisfactory level of compliance
Science Civil and triangulation of breadth and depth of the
Engineering program, QMS, CQI and implementation of OBE
Current Status From Intake of system, re-accreditation is granted for three (03)
Batch 2018 to years i.e. Intake Batches 2020, 2021 & 2022.
2019
Visit Type Re-accreditation The Institution, however, is required to address
Date of Visit May 23-24, 2024 all observations of the evaluation report,
9
Name of University/
S# 114th EAB Decision
Program Profile
particularly in Criteria-1, 2, 3 & 9, as part of its
CQI process before applying for reaccreditation.
c. Program Bachelor of Based on the satisfactory level of compliance
Science Computer and triangulation of breadth and depth of the
Engineering program, QMS, CQI and implementation of OBE
Current Status From Intake of system, re-accreditation is granted for two (02)
Batch 2018 to years i.e. Intake Batches 2020 & 2021.
2019
Visit Type Re-accreditation Further, re-accreditation is also recommended
Date of Visit May 23-24, 2024 for intake batch 2022 under Level-II subject to
submission of satisfactory Compliance Report
alongwith tangible evidences on all major
observations/ weaknesses, particularly in
Criteria 1, 3, 5 & 8.
Name of University/
S# 114th EAB Decision
Program Profile
Current Status From Intake of program, QMS, CQI and implementation of OBE
Batch 2008 to system, the re-accreditation is granted for Intake
2019 Batch 2020. Further, the re-accreditation of
Visit Type Re-accreditation intake batch 2021 was also recommended
Date of Visit May 6-7, 2024 based on submission of satisfactory Compliance
Report of the major observation mentioned in the
Evaluation Report.
Zone-I (Punjab)
Name of University/
S# 114th EAB Decision
Program Profile
01. Khwaja Fareed University of Engineering & Technology, Rahim Yar Khan
a. Program B.S. Civil Based on partial implementation of OBE and
Engineering incomplete assessment, CQI for the program, re-
Current Status From Intake of accreditation is granted for one (01) year i.e.
Batch 2017 to Intake Batch 2019 under Level-I.
2018
Visit Type Re-Accreditation Further, re-accreditation is also granted for
Date of Visit February 16-17, Intake Batch 2020 subject to submission of
2024 satisfactory compliance on following
observations:
Name of University/
S# 114th EAB Decision
Program Profile
The Institution, however, is required to address
all observations, particularly in Criteria-2,3,6 & 7,
as mentioned in the evaluation report as part of
its CQI process before applying for re-
accreditation.
d. Program B.S. Mechanical Based on partial implementation of OBE and
Engineering incomplete assessment, CQI for the program, re-
Current Status From Intake of accreditation is granted for one (01) year i.e.
Batch 2014 to Intake Batch 2019 subject to compliance on
2018 deficiencies and weak areas as mentioned in
Visit Type Re-Accreditation detailed visit report and to be verified through
Confirmatory visit.
Date of Visit February 16-17,
2024 The Level of accreditation will be decided subject
to outcome of Confirmatory Visit.
Name of University/
S# 114th EAB Decision
Program Profile
its CQI process before applying for re-
accreditation.
c. Program B.Sc. Mechanical Based on the satisfactory level of compliance
Engineering and triangulation of breadth and depth of the
Current Status Intake of Batch program, QMS, CQI and implementation of OBE
2010 & From system, the re-accreditation is granted for two
Intake of Batch (02) years i.e., for Intake Batches 2019 and
2012 to 2018 2020.
Visit Type Re-Accreditation
The Institution, however, is required to address
Date of Visit April 18-19, 2024
all observations, particularly in Criteria-2,3 5,6 &
8, as mentioned in the evaluation report as part
of its CQI process before applying for re-
accreditation.
03. University of Management & Technology, Lahore (Sialkot Campus)
a. Program B.S. Mechanical Based on partial implementation of OBE and
Engineering incomplete assessment, CQI for the program, re-
Current Status From Intake of accreditation is granted for one (01) year i.e.
Batch Fall-2014 Intake Batch 2019 under Level-I.
to 2018
Visit Type Re-Accreditation However, Based on the satisfactory level of
compliance and triangulation of breadth and
Date of Visit March 1-2, 2024 depth of the program, QMS, CQI and
implementation of OBE system, the re-
accreditation is granted for one (01) year i.e., for
Intake Batch 2020.
Name of University/
S# 114th EAB Decision
Program Profile
04. COMSATS University, Islamabad (Wah Campus)
Program B.Sc. Mechanical Based on the satisfactory level of compliance
Engineering and triangulation of breadth and depth of the
Current Status From Intake of program, QMS, CQI and implementation of OBE
Batch system, the re-accreditation is granted for three
2018 to 2019 (03) years as follows:
Visit Type Re-Accreditation
i. Intake Batch 2020 & 2021
Date of Visit May 2-3, 2024 ii. Intake Batch 2022 subject to submission of a
satisfactory compliance on weak areas as
mentioned in visit report:
Name of University/
S# 114th EAB Decision
Program Profile
mentioned in the evaluation report as part of its
CQI process before applying for re-accreditation.
b. Program B.E. Information Based on the satisfactory level of compliance
Security and triangulation of breadth and depth of the
Current Status Nil program, QMS, CQI and implementation of OBE
Visit Type Accreditation system, the re-accreditation is granted for two
(02) years of Intake Batches 2020 and 2021.
Date of Visit May 10-11, 2024
The Institution, however, is required to address
all observations, particularly in Criteria-2, 3 & 8
as mentioned in the evaluation report as part of
its CQI process before applying for re-
accreditation.
Note:
Name of University/
S# 114th EAB Decision
Program Profile
Faculty of Engineering, Bahawalpur, The Islamia University of Bahawalpur
08. (Formerly University College of Engineering and Technology, Islamia University
of Bahawalpur, Bahawalpur)
a. Program B.Sc. Computer Based on the satisfactory level of compliance
Systems and triangulation of breadth and depth of the
Engineering program, QMS, CQI and implementation of OBE
Current Status From Intake of system, the re-accreditation is granted for three
Batch 2005 to (03) years as follows:
2019
Visit Type Re-Accreditation i. Intake Batch 2020 and 2021
ii. Intake Batch 2022 subject to submission of a
Date of Visit May 24-25, 2024 satisfactory compliance on major weak areas
(W2 & W3) as mentioned in visit report.
Name of University/
S# 114th EAB Decision
Program Profile
ii. Intake Batch 2021 subject to submission of a
satisfactory compliance on weak areas as
mentioned in visit report.
Annex-B
to the Minutes of 114th EAB Meeting held on June 6, 2024 at PEC H/O, Islamabad
Zone-I (Punjab)
Name of University/
S# 114th EAB Decision
Program Profile
01. Army Public College of Management and Science, Rawalpindi
a. Program B.Sc. Civil Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status From Intake of granted for one (01) year i.e. Intake Batch 2020.
Batch 2018 to
2019. However, the observations/ weaknesses and
concerns identified in the PEC visitation report
Visit Type Confirmatory visit
must be addressed. Further, to observe CQI,
for re-
University/ Institute has to submit separate
accreditation of
progress report along with evidence to PEC,
intake batch 2020
while applying for subsequent re-accreditation
Date of Visit February 2, 2024
visit.
b. Program B.Sc. Software
Engineering Based on physical verification and assessment
Current Status From Intake of during confirmatory visit, re-accreditation is
Batch 2018 to granted for one (01) year i.e. Intake Batch 2020.
2019.
Visit Type Confirmatory visit Further, B.Sc. Software engineering program
for re- has been closed w.e.f. Fall-2021. Incase HEI
accreditation of intents to launch the program then a fresh Zero
intake batch 2020 visit request would be required to proceed
Date of Visit February 1, 2024 accordingly.
Name of University/
S# 114th EAB Decision
Program Profile
Date of Visit February 29, while applying for subsequent re-accreditation
2024 visit.
03. Information Technology University, Lahore
Program BS Computer Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status Intake of Batch granted for one (01) year i.e. Intake Batch 2020.
2019 only
Visit Type Confirmatory visit However, the observations/ weaknesses and
for re- concerns identified in the PEC visitation report
accreditation of must be addressed. Further, to observe CQI,
intake batch 2020 University/ Institute has to submit separate
Date of Visit April 22, 2024 progress report along with evidence to PEC,
while applying for subsequent re-accreditation
visit.
04. School of Engineering, University of Management and Technology, Lahore
a. Program B.S. Industrial Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status From Intake of granted for one (01) year i.e. Intake Batch 2019.
Batch 2012 to
2018 However, the observations/ weaknesses and
Visit Type Confirmatory visit concerns identified in the PEC visitation report
for re- must be addressed. Further, to observe CQI,
accreditation for University/ Institute has to submit separate
intake batch 2019 progress report along with evidence to PEC,
Date of Visit March 16, 2024 while applying for subsequent re-accreditation
visit.
b. Program B.S. Mechanical Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status From Intake of granted for one (01) year i.e. Intake Batch 2019.
Batch 2014 to
2018 However, the observations/ weaknesses and
Visit Type Confirmatory visit concerns identified in the PEC visitation report
for re- must be addressed. Further, to observe CQI,
accreditation for University/ Institute has to submit separate
intake batch 2019 progress report along with evidence to PEC,
Date of Visit March 16, 2024 while applying for subsequent re-accreditation
visit.
Program B.S. Civil Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status From Intake of granted for one (01) year i.e. Intake Batch 2019.
c. Batch 2014 to
2018 However, the observations/ weaknesses and
Visit Type Confirmatory visit concerns identified in the PEC visitation report
for re- must be addressed. Further, to observe CQI,
24
Name of University/
S# 114th EAB Decision
Program Profile
accreditation for University/ Institute has to submit separate
intake batch 2019 progress report along with evidence to PEC,
Date of Visit March 16, 2024 while applying for subsequent re-accreditation
visit.
05. The University of Lahore, Lahore
Program B.Sc. Civil Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status From Intake of granted for one (01) year i.e. Intake Batches
Batch 2014 to 2020.
2019
Visit Type Confirmatory visit However, the observations/ weaknesses and
for reaccreditation concerns identified in the PEC visitation report
for intake batch must be addressed. Further, to observe CQI,
2020 University/ Institute has to submit separate
Date of Visit April 22, 2024 progress report along with evidence to PEC,
while applying for subsequent re-accreditation
visit.
06. Faculty of Engineering and Technology (Bahauddin Zakariya University, Multan)
(Formerly University College of Engineering and Technology, Multan
Program B.Sc. Building & Based on physical verification and assessment
Architectural during confirmatory visit, re-accreditation is
Engineering granted for one (01) year i.e. Intake Batches
Current Status From Intake of 2020.
Batch 2004 to
2019 However, the observations/ weaknesses and
Visit Type Confirmatory visit concerns identified in the PEC visitation report
for re- must be addressed. Further, to observe CQI,
accreditation of University/ Institute has to submit separate
intake batch 2020 progress report along with evidence to PEC,
Date of Visit May 3, 2024 while applying for subsequent re-accreditation
visit.
Institute of Electrical, Electronics and Computer Engineering (Formerly College
07.
of Engineering and Emerging Technologies, University of the Punjab, Lahore)
Program B.Sc. Electrical Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current Status From Intake of granted for one (01) year i.e. Intake Batch 2019.
Batch 2005 to
2018 However, the observations/ weaknesses and
Visit Type Confirmatory visit concerns identified in the PEC visitation report
for reaccreditation must be addressed. Further, to observe CQI,
for intake batch University/ Institute has to submit separate
2019 progress report along with evidence to PEC,
Date of Visit February 1, 2024 while applying for subsequent re-accreditation
visit.
25
Name of University/
S# 114th EAB Decision
Program Profile
08. HITEC University, Taxila
Program Bachelor of Based on the physical verification and
Biomedical assessment during Interim Visit, permission is
Engineering granted to continue the program.
Current Status Nil
Visit Type Interim However, the observations/ weaknesses and
Date of Visit January 29, 2024 concerns identified in the evaluation report must
be addressed. Further, to observe CQI,
university/ institute must submit separate
progress report along with evidence to PEC,
while applying for accreditation visit.
09. NFC Institute of Engineering & Technology, Multan
Program B.Sc. Civil Based on physical verification and assessment
Engineering during confirmatory visit, re-accreditation is
Current From Intake of Batch granted for one (01) year i.e. Intake Batch 2020.
Status 2013 to 2019
Visit Type Confirmatory visit for However, the observations/ weaknesses and
a. re-accreditation of concerns identified in the PEC visitation report
intake batch 2020 must be addressed. Further, to observe CQI,
Date of Visit April 19, 2024 University/ Institute has to submit separate
progress report along with evidence to PEC,
while applying for subsequent re-accreditation
visit.
Program Based on physical verification and assessment
B.Sc. Mechanical during confirmatory visit, re-accreditation is
Engineering granted for one (01) year i.e. Intake Batch 2020.
Current From Intake of Batch
Status 2013 to 2019 However, the observations/ weaknesses and
b. Visit Type Confirmatory visit for concerns identified in the PEC visitation report
re-accreditation of must be addressed. Further, to observe CQI,
intake batch 2020 University/ Institute has to submit separate
Date of Visit April 20, 2024 progress report along with evidence to PEC,
while applying for subsequent re-accreditation
visit.
-----