Installation Qualification (IQ)
Index
1 Table Of Content .................................................................................................................... 3
2 Pre-Approval ........................................................................................................................... 4
3 Objective ................................................................................................................................. 5
4 Scope ....................................................................................................................................... 5
5 Responsibility ........................................................................................................................ 6
6 Pre-Installation Check List .................................................................................................... 7
7 Installation Qualification Tests ............................................................................................... 9
7.1 Document & Drawing Verification ...................................................................................... 10
7.2 Identification Of Major Components .................................................................................... 12
7.3 Utility Verification ................................................................................................................ 17
7.4 Software Verification ............................................................................................................ 18
7.5 Network Verification ............................................................................................................ 19
7.6 Digital Input Verification ...................................................................................................... 20
7.7 Digital Output Verification ................................................................................................... 21
8 Acceptance Criteria / Checks During Installation.................................................................. 22
9 Qualification Document Report Approval ............................................................................. 23
10 Discrepancy and Corrective Action Report ........................................................................... 24
11 Final Approval……………………………………………………………………………….25
12 Remark If Any ....................................................................................................................... 26
Page 3 of 26
Installation Qualification (IQ)
3. Objective:
To design, engineer, and supply the High Shear Mixer- 30 & 10 LTR as per cGMP and GEP
guidelines and to provide assurance that the machine is manufactured as per the URS and it
complies with the Scope of Supply.
To prove that each operation proceeds as per the design specification and the tolerances
prescribed there in the document, are the same at utmost transparency. Validation procedure
is set for complete satisfaction of the customer & building confidence of the user about the
machine.
4. Scope:
The scope of this qualification document is limited to the Installation Qualification of High
Shear Mixer 30 & 10 LTR
The scope of this document includes all of the operating functions, control functions, &
alarm of the High Shear Mixer.
In addition to an introduction to the machine functionality, this document provides a detailed
description for each identifiable separate function performed by the machine.
Page 5 of 26
Installation Qualification (IQ)
5. Responsibilities
A. Client: -
To provide the URS for the Equipment.
To perform the Installation Qualification Test (IQ).
Page 6 of 26
Installation Qualification (IQ)
This check list needs to be verified by customer once the machine is received at location. This
is to ensure everything is intact before service engineer reached to the site to help to reduce the
installation time to smooth installation and commissioning. This check list also help customer
to install the utilities of correct specification.
1. Minimum space required to house the basic Machine High Shear Mixer-30&10 Ltr
2300mm x 1270mm x 1970 mm (L x W x H)
3. Maintain humidity at the Machine site between 40% RH and 50% RH and / or
lower Depending upon formulation requirement if any
5. Ensure electrical supply connections for the Machine and the accessories as per
their technical specifications.
6. Ensure Pneumatic compressed air supply connections for the Machine and the
Accessories as per their technical specifications.
The above activities carried out prior to arrival of our engineer will help him
devote more time towards setting formulations and training your personnel
Page 7 of 26
Installation Qualification (IQ)
CAUTIONS:
Do not operate the machine until the machine is fixed properly.
Tighten all nuts and bolts firmly as they may be loosened during transportation.
Check if there is oil inside the gear box through the indication port provided.
Page 8 of 26
Installation Qualification (IQ)
The table below lists the tests to be performed as part of the Installation Qualification phase.
Page 9 of 26
Installation Qualification (IQ)
Purpose:
To verity that the documents provided are complete and correct technical references and
permits servicing of the units.
Test equipment:
Not Required.
Procedure:
1. Verify that the required documents and drawings listed in the tables below are available.
Page 10 of 26
Installation Qualification (IQ)
Acceptance Criteria:
1. The documents must be accurate and complete.
2. The drawing information must correspond to the physical installation.
Conclusions / Comments:
Result: - _______________________________________________________________
Page 11 of 26
Installation Qualification (IQ)
Verified By
Sr. No. Description Specifications
Yes /No
6.1 Product Bowl Assembly
Product Bowl
Manufacturer Exenity Systems Pvt Ltd, Pune.
MOC SS316
Gross Volume: 30 &10 LTR
Working Volume: 24 – 6 LTR And
Volumetric Capacity 8 – 2 LTR
[ Working Volume Min. & Max capacity by
considering bulk density ≤ 0.45 gm/cc]
Page 12 of 26
Installation Qualification (IQ)
Verified By
Sr. No. Description Specifications
Yes /No
Impeller Motor with Gear Box
Make Sew Eurodrive
Type/Model KAF49AMS100
Machine Lamp
Make Bold India
Specification 21Watt
Page 13 of 26
Installation Qualification (IQ)
Verified By
Sr. No. Description Specifications
Yes /No
6.2 Purge Air Assembly
Make SMC
Model PFMB7201-C8-D
Atomization pressure regulator
Make SMC
Model ITV2050-012CS3
5/2 Solenoid Valves - 2Qty
Make SMC
Model SY5320-5DZ-01
Mist Separator
Make SMC
Model AC30X-X5B867-B
Regulator with Gauge -2Qty
Make SMC
Model AR20-02BG1-B
Pressure Switch
Make SMC
Model ISE20A-V-01-J
Verified By
Sr. No. Description Specifications
Yes /No
6.3 Discharge Assembly
Discharge Assembly
Manufacturer Exenity Systems Pvt Ltd, Pune.
MOC SS316
Page 14 of 26
Installation Qualification (IQ)
Verified By
Sr. No. Description Specifications
Yes /No
6.4 Control Assembly
Analog Output Card: 1 No.
Make Mitsubishi
Model FX5-4DA-ADP
Page 15 of 26
Installation Qualification (IQ)
Verified By
Sr. No. Description Specifications
Yes /No
MCB
Make Siemens
Specification 2 Pole ,6 AMP (Qty-3)
MCB
Make Siemens
Specification 2 Pole ,10AMP (Qty-1)
MCB
Make Siemens
Specification 1 Pole ,6 AMP (Qty-1)
Choke
Make Arihant Electricals
Specification 2.2 KW
Choke
Make Arihant Electricals
Specification 0.75 KW
Transformer
Make Arihant Electricals
Input 110V/ Output 230V ,
Specification
AC220-230VA
Main switch
Make Siemens
Model 3LD2003-OTK53
Drive Section
VFD for Impeller Motor
Mak
Mitsubishi
e
Mod
FR-D740-050-E16
el
VFD for Chopper Motor
Mak
Mitsubishi
e
Mod
FR-D740-036-E16
el
Page 16 of 26
Installation Qualification (IQ)
Purpose:
To verify that all necessary utilities are correctly installed.
Test Equipment:
Calibrated digital multi-meter
Procedure:
Confirm that utilities connections are configured as per specification and in compliance with local
codes.
Record the results in the table below. Note any deviations or discrepancies.
Acceptance Criteria:
All services and connections must be installed and documented as per Specifications.
Conclusions / Comments:
Result: -
_______________________________________________________________
Page 17 of 26
Installation Qualification (IQ)
Purpose:
To verity that all software for the High Shear Mixer has been updated before starting the
Installation Qualification.
Procedure:
Verify that all software are updated using an approved procedure, against a traceable standard.
Note any deviations or discrepancies and recommend follow up actions if required.
For all software, attach copies of certificates to this protocol.
Acceptance Criteria:
All software for the High Shear Mixer shall be in a state of software.
Complies
Description Model No. Software Version Remark
Yes / No/ NA
HMI GS2110-WTBD-N Zenon Supervisor 7.60
GX Works 3,
PLC FX5U-32MT/ESS
Version 1.090U
Conclusions / Comments:
Result: -
_______________________________________________________________
Page 18 of 26
Installation Qualification (IQ)
Purpose:
To verity that all network for the High Shear Mixer has been updated before starting the
Installation Qualification.
Procedure:
Verify that all networks are updated using an approved procedure, against a traceable
standard.
Note any deviations or discrepancies and recommend follow up actions if required.
For all software, attach copies of certificates to this protocol.
Acceptance Criteria:
All networks for the High Shear Mixer shall be in a state of network.
Present Complies
Description Type Remark
(Yes / No) Yes / No/ NA
1. Ethernet Ethernet
Conclusions / Comments:
Result: -
_______________________________________________________________
Page 19 of 26
Installation Qualification (IQ)
Purpose:
To verity that all digital input for the High Shear Mixer has been working before starting the Installation
Qualification.
Procedure:
Verify that all digital inputs are working using an approved procedure, against a traceable standard.
Note any deviations or discrepancies and recommend follow up actions if required.
Acceptance Criteria:
All digital inputs for the High Shear Mixer shall be in a state of INPUT status.
Conclusions / Comments:
Result: -
_______________________________________________________________
Page 20 of 26
Installation Qualification (IQ)
Purpose:
To verity that all digital output for the High Shear Mixer has been working before starting the
Installation Qualification.
Procedure:
Verify that all digital outputs are working using an approved procedure, against a traceable standard.
Note any deviations or discrepancies and recommend follow up actions if required.
Acceptance Criteria:
All digital outputs for the
High Shear Mixer shall be in a state of OUTPUT status.
Conclusions / Comments:
Result: - _______________________________________________________________
Verify the correct Location of placement of the machine in such a way that the machine
4.
should not foul with any wall, partition, pillar or any other object around the machine.
5. Verify & check all the items as per packing list supplied along with the machine.
6. Verify the assembly of all the loose parts at the decided location.
Verify electrical supply connections for the machine and the accessories as per their
7.
technical specification.
Verify availability of isolator of
8.
For 3 phase 415 V + Earth / ground, 50 Hz.
9. Ensure the top lid opening and closing easily without any hindrance.
14. Put the control switch to ON & verify the function of the control switches.
15. Ensure the functioning of process timer and operating push buttons.
Page 22 of 26
Installation Qualification (IQ)
9.1 Summary:
9.2 Certification:
Page 23 of 26
Installation Qualification (IQ)
Page 24 of 26
Installation Qualification (IQ)
Manufacturer -
Commissioning Engineer