LT-902-TSG-LSS-001 Rev.0 Lighting Scene Schedule - FOH - Hotel ADD
LT-902-TSG-LSS-001 Rev.0 Lighting Scene Schedule - FOH - Hotel ADD
HAD.CBA.1.04 SPARE
HAD.CBA.1.05 HA-U1 9 1 6 DALI 80 70 60 50 OFF 90
Page 1 of 2
PROJECT II PLOT 18 - DORCHESTER HOTEL ADD
DOCUMENT II LIGHTING SCENE SETTING SCHEDULE
REFERENCE II LT-902-TSG-LSS-001 Rev.0
DATE II 28-Sep-21
`
Channel Number Luminaire Lamps Per Luminaire INITIAL SCENE SETTING
NOTES :
* The loads are actual lamp loads only and do NOT include control gear, ballasts or transformers
* Exact location of dimmer racks to be confirmed by Engineer.
* All loads for decorative interior designer specified luminaires are allowances.
* LT has assumed 5 Amps max per control group, 5A x 240V = 1200W
* Quantities stated are for reference only, please refer to drawings for take off.
* All luminaries to be pre-tested by Lighting Control Supplier to determine their dimming range, and compatibility to the system. The system should be capable of smooth dimming avoiding flicker and harsh transitions between scenes.
* Regarding the associated lighting control system, cabling and control protocol of both Refurbished and soft-touch areas, this will be determined by the client & electrical pending a decision on whether to implement the LT lighting recommendations.
* Timer based automatic scene transitions should be slowly & unnoticeable over a period of 10mins, whilst when triggered over a manual control panel within 3seconds.
xxx Above is an initial scene setting subect to review on site (alternative fixture & installation) and subject to final review and approval by client & operator
Denotes a change from previous revision issue
Denotes a power allowance only (supply by others)
Page 2 of 2