1. Introduction
This Method Statement provides details of placing plum concrete in Coke
Oven Battery Area for Coke Oven Project at JSPL, Raigarh (Chattisgarh).
The objective of plum concrete is to achieve required bearing capacity of soil
at the founding level.
2. Activities
The main activities described in this method statement are:
1. Excavation of site upto hard strata.
2. Placement of alternate layers of 100 mm thick concrete mix of 1:4:8 or
1:5:10 and 300 mm thick aggregate layer comprising of crushed
aggregates of size ranging between 40mm and 300mm.
3. Compaction of aggregate layer using tampers.
3. Construction Equipment
List of major plant and equipment to be deployed is as under:
S. No.Description Qty.
1. 10/7 Concrete mixer 1 No
2. Dumpers 2 Nos.
4. Materials
4.1 1:4:8 or 1:5:10 Concrete Mix:
This concrete mix will be prepared by 10/7 concrete mixer and placed in
layers of 100 mm alternately with layers of plums.
5. Filling Procedure
1
2